Shrimp Culture Planning: Pond and System Preparation, Water Quality, Health, Feeding, Survival and Harvest
Updated: 2026-10-13 · FishMatch Group

Short answer
A shrimp cycle is planned backwards from harvest: decide the target size, harvest date and market, then plan stocking, feeding, aeration and water management to reach it. Prepare the pond or system before stocking, buy postlarvae with the health documents your country requires, monitor water and survival daily, adjust feeding with trays and sampling, and involve an aquatic animal health professional for any disease concern. Results depend on species, region, system and management — use your own records and local expertise to set targets.
Plan backwards from the harvest
Start with the market: target shrimp size, harvest date, quantity and buyer requirements (for example certification or traceability). From there estimate the cycle length, the stocking number you can support with your aeration and water management, and the feed you will need. The shrimp farm calculator helps test harvest, feed and margin scenarios with your own inputs.
Step 1 — Prepare the pond or system
- Ponds: drain, dry and clean the bottom where possible, remove sludge, repair dikes and liners, check gates and screens, and prepare water following local good practice.
- Lined ponds, tanks and RAS: clean and disinfect according to your biosecurity plan, check aeration, pumps, filtration and the biofilter before stocking.
- Test that aeration and backup power work before stock arrives. Calculate volume with the pond volume calculator.
Step 2 — Biosecurity and postlarvae selection
Buy postlarvae (PL) from a hatchery that supplies the health certificates or test results your national authority requires, and record the batch, stage and origin. Screen incoming water, control access of people, birds, crabs and equipment, and keep separate tools per pond where possible. The WOAH Aquatic Code lists notifiable crustacean diseases; follow your country's rules.
Step 3 — Stocking and acclimation
Match temperature, salinity and pH gradually between transport water and the pond, following the hatchery's written guidance for that stage. Count samples to confirm the number stocked and record early mortality separately.
Step 4 — Water-quality management
Monitor dissolved oxygen (especially before dawn), temperature, salinity, pH and alkalinity, and ammonia and nitrite according to your protocol, more often as biomass grows. Safe ranges depend on species, stage and system, so use species guidance such as the FAO vannamei fact sheet and local expert protocols. The shrimp oxygen-risk calculator highlights high-risk biomass levels.
Step 5 — Feeding and sampling
Sample growth regularly with a consistent method, estimate survival and biomass, and set rations from feed tables adjusted by feed-tray response, temperature and oxygen. Track FCR with the FCR calculator. See the growth and feed efficiency guide for diagnosis.
Step 6 — Health watch
Watch feeding, behaviour, colour, moulting and mortality every day. If you see unusual deaths or signs, check oxygen and water first, then contact a qualified aquatic animal health professional. This guide does not diagnose disease or recommend treatments. The shrimp mortality investigation checklist lists the records to collect.
Step 7 — Harvest
| Before harvest | Why |
|---|---|
| Confirm size and quantity by sampling | Matches buyer specification |
| Agree date, logistics and ice/cold chain | Protects product quality |
| Stop or reduce feeding per buyer and local practice | Empties the gut, improves quality |
| Record weighed harvest by pond | Calculates real survival, FCR and cost per kg |
Using the results for your next project
Cycle records show whether aeration, water treatment, nursery capacity or pond design limit results. If an upgrade or new farm is needed, use the project intake; FishMatch reviews it and contacts suitable suppliers for you.
Frequently asked questions
What survival should I plan for in a shrimp cycle?
There is no universal figure. Plan from your own cycle records or, for a new farm, from conservative local references, and test the economics with several survival scenarios.
How should a shrimp pond be prepared before stocking?
Drain and clean it, remove sludge, repair dikes, liners and screens, prepare the water according to local good practice, and test aeration and backup power before postlarvae arrive.
What documents should postlarvae come with?
The health certificates or test results required by your national authority, plus the batch origin, stage and count method. Ask the hatchery for written acclimation guidance.
How often should shrimp be sampled?
Regularly and with the same method, so that biomass, survival and rations stay accurate. Many farms sample weekly; your protocol should set the interval.
What should I do if shrimp start dying?
Check oxygen, aeration and water quality first, stop or reduce feeding, record what you see, and contact a qualified aquatic animal health professional. Report notifiable diseases as your country requires.
Tools and next steps
Sources
General guidance only. Targets, health decisions and results depend on species, region and system; consult qualified local professionals.