$250K – $100M+ · 상업 양식

양식 프로젝트 & 투자 허브

23개의 상업 프로젝트 아키타입을 국가·어종·시스템·단계·투자 규모·자금 출처로 필터링하고 FishMatch Group과 기획, 조달, 파이낸싱을 진행하세요.

총 23개 중 23개 표시
Fish Farm · RAS

100-Ton RAS Fish Farm

Indoor recirculating fish farm — tanks, filtration, oxygen, monitoring, energy, cost drivers, bankability.

$1M–$5M$5M–$20MDomesticExport
Europe · GCC · Africa
프로젝트 보기
Fish Farm · RAS

500-Ton RAS Fish Farm

Large-scale indoor RAS: tilapia, sea bass, trout, salmon smolt — full engineering & financing playbook.

$20M–$100M+Export
Europe · GCC · North America
프로젝트 보기
Shrimp Farm · RAS

500-Ton Shrimp RAS

Indoor whiteleg shrimp RAS — nursery + grow-out, biosecurity, energy and full CAPEX breakdown.

$20M–$100M+DomesticExport
Europe · GCC · North America
프로젝트 보기
Shrimp Farm · Pond

Shrimp Farm Development

Semi-intensive / intensive vannamei ponds — site, water, biosecurity, aeration, financing.

$1M–$5M$5M–$20MExportDomestic
Latin America · Asia · Africa
프로젝트 보기
Hatchery · Hatchery

Fish Hatchery

Marine or freshwater hatchery — broodstock, larvae, live feed, water treatment, biosecurity.

$1M–$5M$5M–$20MDomesticExport
Global
프로젝트 보기
Genetics · Hatchery

Broodstock & Genetics Center

SPF/SPR broodstock, genomic selection, quarantine, RAS and cryo — certified eggs and PLs.

$5M–$20M$20M–$100M+DomesticExport
Global
프로젝트 보기
Feed Mill · Processing

Aquafeed Mill

Extruded aquafeed plant — intake, extrusion, drying, coating, packing, QC.

$5M–$20M$20M–$100M+DomesticExport
Global
프로젝트 보기
Processing · Processing

Seafood Processing Plant

Reception, filleting, IQF, packing, cold storage — HACCP, BRC, EU/FDA/GCC export.

$5M–$20M$20M–$100M+Export
Global
프로젝트 보기
Cold Chain · Cold Chain

Aquaculture Cold Chain

Blast freezing, cold storage, reefer logistics, traceability and export.

$1M–$5M$5M–$20MExport
Global
프로젝트 보기
Cold Chain · Infrastructure

Industrial Ice Plant

Flake, tube and slurry ice; ammonia vs freon; silos and bagging for harvest and processing.

$250K–$1M$1M–$5MDomesticExport
Global
프로젝트 보기
Export · Integrated

Integrated Export Aquaculture Facility

Integrated farm + processing + cold chain + export logistics to EU/US/Japan/GCC.

$20M–$100M+Export
Latin America · Asia · Africa
프로젝트 보기
Fish Farm · Cage

Offshore Sea-Cage Farm

Salmon, sea bass, sea bream, cobia — cages, moorings, feed barge, monitoring and EIA path.

$5M–$20M$20M–$100M+Export
Europe · Latin America · GCC
프로젝트 보기
Energy · Solar

Solar Aquaculture

PV + battery storage across pond, RAS, hatchery, cold storage — sizing, ROI, financing.

$250K–$1M$1M–$5MDomesticExport
Africa · Middle East · Latin America
프로젝트 보기
Shrimp Farm · Solar

Solar-Hybrid Shrimp Farm (100 t)

Semi-intensive pond aeration on PV + LFP battery — reduce diesel 60–90%.

$1M–$5M$5M–$20MExport
Latin America · Africa · Asia
프로젝트 보기
Fish Farm · Solar

Solar-Hybrid RAS Fish Farm (250 t)

Grid-tied hybrid RAS for tilapia / trout / sea bass.

$5M–$20MDomesticExport
Middle East · Africa · Southern Europe
프로젝트 보기
Hatchery · Solar

Off-Grid Solar Hatchery

100% off-grid PV + battery for remote PL / fingerling production.

$250K–$1M$1M–$5MDomestic
Africa · Latin America · Asia
프로젝트 보기
Water & Infrastructure · Infrastructure

Aquaculture Water Treatment Plant

Intake, reuse, effluent and discharge — for RAS, hatchery, shrimp, fish and processing.

$1M–$5M$5M–$20MDomesticExport
Global
프로젝트 보기
Water & Infrastructure · Infrastructure

Aquaculture Wastewater & Effluent Plant

Solids, denitrification, phosphorus, disinfection and discharge compliance.

$1M–$5M$5M–$20MDomesticExport
Global
프로젝트 보기
Water & Infrastructure · Infrastructure

Sea-Water Intake, Outfall & Reservoir

Coastal intake heads, pump stations, transmission mains, storage reservoirs and marine outfalls.

$5M–$20M$20M–$100M+DomesticExport
Coastal – Global
프로젝트 보기
Water & Infrastructure · Infrastructure

Industrial Farm Hall & Biosecure Building

Insulated hall, load-bearing tank slab, HVAC, drainage and biosecurity envelope.

$1M–$5M$5M–$20MDomesticExport
Global
프로젝트 보기
Fish Farm · Pond

Biofloc Fish & Shrimp Farm

Commercial biofloc modules for tilapia, catfish and vannamei — tanks, aeration, carbon dosing, solids control, CAPEX and risks.

$250K–$1M$1M–$5MDomestic
Asia · Africa · Latin America
프로젝트 보기
Water & Infrastructure · Pond

Pond Aeration System

Farm-wide aeration packages: oxygen demand sizing, paddlewheel vs diffused vs hybrid, electrics, backup power and DO automation.

$250K–$1M$1M–$5MDomesticExport
Asia · Latin America · Africa
프로젝트 보기
Feed Mill · Processing

Fish Feed Extruder Line

Extruded aquafeed line from 1 to 20 t/h — grinding, conditioning, single vs twin screw, drying, vacuum coating and packing.

$250K–$1M$1M–$5MDomesticExport
Africa · Asia · Latin America
프로젝트 보기
공공 조달

양식 입찰 & 개발 프로그램

FishMatch Group은 활성 입찰을 게시하지 않습니다. 세계은행, AfDB, IFC, IDB, FAO, EU, GCC 식량안보 및 각국 개발 프로그램의 공공 양식 조달을 준비·구조화하도록 바이어·스폰서·정부기관을 지원합니다.

  • EOI 및 사전 자격 지원
  • Employer's Requirements 작성
  • 수량 명세 및 CAPEX 구성
  • 입찰 비교 매트릭스
  • 금융 가능 문서
  • 공급사 컨소시엄 구성
공공 입찰을 준비 중이신가요?

RFP 또는 프로그램 브리프를 보내주세요. 72시간 이내 공급사 중립 응찰 전략을 준비해 드립니다.

FishMatch에 문의

기획에서 조달로 넘어갈 준비가 되셨나요?

FishMatch Group은 수락하는 모든 상업 양식 프로젝트의 기밀 조달·파이낸싱 워크플로를 운영합니다.

Short answer

What is the fastest way to get quotes for Investment Hub?

Submit one structured request for Investment Hub. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer

Before you request quotes

Costs & budgeting

How much does a commercial fish farm cost to build?

Budget ranges depend on system type, not on country alone. Pond and cage projects are usually the lowest capital per tonne of annual output, while recirculating (RAS) projects carry the highest equipment and energy share because filtration, oxygenation and backup power are mandatory. Reliable numbers come from a sized bill of quantities — species, target tonnage, water source and grow-out temperature — not from a generic price list. Use the FishMatch calculators to size the project, then submit an RFQ so quotes are priced against the same specification.

What drives the price differences between aquaculture equipment quotes?

Most spread between quotes comes from scope, not from margin: included spares, installation and commissioning, control and automation level, materials (HDPE vs steel vs FRP), certification and testing, delivery terms (EXW vs CIF) and warranty length. Two quotes are only comparable when they answer the same specification. A structured RFQ fixes the scope so differences reflect real engineering choices.

What operating costs should a business plan include?

Feed is normally the largest recurring cost, followed by energy (highest in RAS), labour, fingerlings or post-larvae, health management, water treatment consumables and maintenance. Financing cost and working capital for the first production cycle are frequently underestimated. FishMatch cost tools separate CAPEX from OPEX so the payback assumption is visible rather than implied.

Get Free QuotesFinancing