Proyectos acuícolas y hub de inversión
Filtra 23 arquetipos de proyectos comerciales por país, especie, sistema, etapa, valor de inversión y fuente de financiamiento — luego planifica, compra y financia con FishMatch Group.
100-Ton RAS Fish Farm
Indoor recirculating fish farm — tanks, filtration, oxygen, monitoring, energy, cost drivers, bankability.
500-Ton RAS Fish Farm
Large-scale indoor RAS: tilapia, sea bass, trout, salmon smolt — full engineering & financing playbook.
500-Ton Shrimp RAS
Indoor whiteleg shrimp RAS — nursery + grow-out, biosecurity, energy and full CAPEX breakdown.
Shrimp Farm Development
Semi-intensive / intensive vannamei ponds — site, water, biosecurity, aeration, financing.
Fish Hatchery
Marine or freshwater hatchery — broodstock, larvae, live feed, water treatment, biosecurity.
Broodstock & Genetics Center
SPF/SPR broodstock, genomic selection, quarantine, RAS and cryo — certified eggs and PLs.
Aquafeed Mill
Extruded aquafeed plant — intake, extrusion, drying, coating, packing, QC.
Seafood Processing Plant
Reception, filleting, IQF, packing, cold storage — HACCP, BRC, EU/FDA/GCC export.
Aquaculture Cold Chain
Blast freezing, cold storage, reefer logistics, traceability and export.
Industrial Ice Plant
Flake, tube and slurry ice; ammonia vs freon; silos and bagging for harvest and processing.
Integrated Export Aquaculture Facility
Integrated farm + processing + cold chain + export logistics to EU/US/Japan/GCC.
Offshore Sea-Cage Farm
Salmon, sea bass, sea bream, cobia — cages, moorings, feed barge, monitoring and EIA path.
Solar Aquaculture
PV + battery storage across pond, RAS, hatchery, cold storage — sizing, ROI, financing.
Solar-Hybrid Shrimp Farm (100 t)
Semi-intensive pond aeration on PV + LFP battery — reduce diesel 60–90%.
Solar-Hybrid RAS Fish Farm (250 t)
Grid-tied hybrid RAS for tilapia / trout / sea bass.
Off-Grid Solar Hatchery
100% off-grid PV + battery for remote PL / fingerling production.
Aquaculture Water Treatment Plant
Intake, reuse, effluent and discharge — for RAS, hatchery, shrimp, fish and processing.
Aquaculture Wastewater & Effluent Plant
Solids, denitrification, phosphorus, disinfection and discharge compliance.
Sea-Water Intake, Outfall & Reservoir
Coastal intake heads, pump stations, transmission mains, storage reservoirs and marine outfalls.
Industrial Farm Hall & Biosecure Building
Insulated hall, load-bearing tank slab, HVAC, drainage and biosecurity envelope.
Biofloc Fish & Shrimp Farm
Commercial biofloc modules for tilapia, catfish and vannamei — tanks, aeration, carbon dosing, solids control, CAPEX and risks.
Pond Aeration System
Farm-wide aeration packages: oxygen demand sizing, paddlewheel vs diffused vs hybrid, electrics, backup power and DO automation.
Fish Feed Extruder Line
Extruded aquafeed line from 1 to 20 t/h — grinding, conditioning, single vs twin screw, drying, vacuum coating and packing.
Educación de inversión y recursos para el comprador
Fish, shrimp & pond financing overview
Debt, ECA, leasing, PPP and blended structures for $250K–$100M+ fish, shrimp and pond projects.
Financing pre-qualifier
Confidential 7-step readiness scoring for fish, shrimp and pond project lenders and equity partners.
Commercial segments
Dedicated pages for shrimp farms, RAS fish farms, sea cages, pond systems, feed mills and more.
Buyer guides
Supplier-neutral tender playbooks for RAS fish farms, shrimp farms, ponds and cage projects.
Bankability checklist
Every document lenders will ask for before signing your fish, shrimp or pond CAPEX.
Documentation Center
Downloadable bankable templates for fish, shrimp and pond scope, specs, tender and bid comparison.
Planning centers
Specialized centers for fish, shrimp and pond engineering, energy, water, cold chain and biosecurity.
Case studies
Anonymized real fish, shrimp and pond projects — CAPEX, timelines and outcomes.
Country solutions
Localized fish, shrimp and pond playbooks for 50+ markets.
Licitaciones acuícolas y programas de desarrollo
FishMatch Group no publica licitaciones activas. Preparamos a compradores, patrocinadores y agencias públicas para licitar y estructurar la contratación pública acuícola — Banco Mundial, AfDB, IFC, IDB, FAO, UE, seguridad alimentaria del CCG y programas nacionales.
- Soporte EOI y precalificación
- Redacción de Employer's Requirements
- Presupuesto de cantidades y CAPEX
- Matriz de comparación de ofertas
- Documentación bancable
- Formación de consorcios de proveedores
Envíanos el RFP o brief del programa. Prepararemos una estrategia neutral de respuesta en 72 horas.
Contactar a FishMatch¿Listo para pasar de la planificación a las compras?
FishMatch Group opera el flujo confidencial de compras y financiamiento detrás de cada proyecto acuícola comercial que aceptamos.
Short answer
What is the fastest way to get quotes for Investment Hub?
Submit one structured request for Investment Hub. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.
- How it works:
- One structured request, human-reviewed before any supplier outreach
- Typical turnaround:
- Depends on scope and site data; no turnaround is guaranteed
- Confidentiality:
- Supplier names are never exposed during evaluation
- Cost to buyers:
- No fee charged to the buyer
Before you request quotes
Costs & budgeting
How much does a commercial fish farm cost to build?
Budget ranges depend on system type, not on country alone. Pond and cage projects are usually the lowest capital per tonne of annual output, while recirculating (RAS) projects carry the highest equipment and energy share because filtration, oxygenation and backup power are mandatory. Reliable numbers come from a sized bill of quantities — species, target tonnage, water source and grow-out temperature — not from a generic price list. Use the FishMatch calculators to size the project, then submit an RFQ so quotes are priced against the same specification.
What drives the price differences between aquaculture equipment quotes?
Most spread between quotes comes from scope, not from margin: included spares, installation and commissioning, control and automation level, materials (HDPE vs steel vs FRP), certification and testing, delivery terms (EXW vs CIF) and warranty length. Two quotes are only comparable when they answer the same specification. A structured RFQ fixes the scope so differences reflect real engineering choices.
What operating costs should a business plan include?
Feed is normally the largest recurring cost, followed by energy (highest in RAS), labour, fingerlings or post-larvae, health management, water treatment consumables and maintenance. Financing cost and working capital for the first production cycle are frequently underestimated. FishMatch cost tools separate CAPEX from OPEX so the payback assumption is visible rather than implied.