Alat akuakultur · gratis

Kalkulator payback surya (beban, diesel, tarif)

Gunakan Kalkulator payback surya (beban, diesel, tarif) untuk menghitung kebutuhan proyek dalam hitungan detik dan mengubah hasilnya menjadi RFQ siap kirim.
Kalkulator payback surya (beban, diesel, tarif) — Solar panels and backup generator at a fish farm
Alat terpasang

Kalkulator payback surya (beban, diesel, tarif)

Purpose-built for solar-hybrid aquaculture: enter your daily load profile, required battery autonomy, grid tariff and diesel assumptions. The tool sizes PV + battery, computes annual grid + diesel savings and returns simple payback and 10-year ROI.

24h average energy demand across pumps, aeration, RAS, hatchery.

Fraction of annual kWh covered by PV (after losses).

Of the non-solar kWh: how much comes from grid vs. diesel.

Example — take it from your generator's fuel-consumption sheet at your load

Default: Guayaquil, Ecuador (NREL PVWatts, panel tilted to latitude). Real sun on the panel, kWh/m²/day — PVWatts / Global Solar Atlas flat ground: Guayaquil 4.71 / 4.52 · Ho Chi Minh City 5.28 / 4.86 · Chennai 5.49 / 5.34 · Kafr El Sheikh (Egypt) 6.27 / 5.55 · Lagos 4.64 / 4.54 · Recife (Brazil) 6.13 / 5.71. Use the panel figure here.

Default: Guayaquil. NREL PVWatts at its 14% default losses gives: Guayaquil 0.74 · Ho Chi Minh City 0.74 · Chennai 0.74 · Lagos 0.74 · Kafr El Sheikh 0.76 · Recife 0.76

Example — use your installer's quote; compare with IRENA, Renewable Power Generation Costs in 2023

Aeration, biofilter, alarms — the loads batteries must ride through.

Example — use your installer's quote; compare with NREL's battery storage cost projections

Ukuran PV yang dibutuhkan
126 kWp
to cover 55% of annual load
Nameplate baterai
120.2 kWh
LFP, 8h autonomy on 12 kW critical load
Total CAPEX (PV + baterai)
$167,684
PV $113,617 · Battery $54,068
Pembangkitan surya tahunan
160,600 kWh/yr
Liter solar yang dihindari / tahun
18,894 L
at 3.4 kWh/L genset yield
Penghematan tahunan (gabungan)
$38,128
blended $0.237/kWh (grid $0.180 · diesel $0.324)
Payback sederhana
4.4 years
ROI 10 tahun
127%
Sensitivity analysis

How ROI changes when tariff, diesel and autonomy shift

Grid values recompute live. Lower payback = better; higher ROI = better. Anchored on your current inputs.

Tariff ↓ / Diesel →$0.66/L$0.88/L$1.10/L$1.32/L$1.54/L
$0.11/kWh7.3 years6.2 years5.4 years4.7 years4.2 years
$0.14/kWh6.4 years5.5 years4.8 years4.3 years3.9 years
$0.18/kWh5.6 years4.9 years4.4 years4 years3.6 years
$0.22/kWh5 years4.5 years4 years3.7 years3.4 years
$0.25/kWh4.6 years4.1 years3.7 years3.4 years3.1 years
Tariff sweep
Payback (gold) vs 10-yr ROI (emerald) as grid tariff varies
base5.4y0.0y169%0%$0.11$0.25
Payback (yrs) 10-yr ROI (%)
Diesel sweep
Payback (gold) vs 10-yr ROI (emerald) as diesel price varies
base5.6y0.0y177%0%$0.66/L$1.54/L
Payback (yrs) 10-yr ROI (%)
Best Mid Worst Your current inputs

Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.

FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

Cara kerjanya

Kalkulator payback surya (beban, diesel, tarif) dari FishMatch Group menghitung hasil indikatif langsung di browser berdasarkan tolok ukur akuakultur internasional. Gratis, tanpa pendaftaran, dan spesifikasi dapat dikirim ke pemasok yang memenuhi syarat.

Yang Anda masukkan
  • Beban harian (kWh/day)
  • Porsi surya dari beban (0–1)
  • Porsi PLN dari sisa beban (0–1)
  • Tarif PLN yang dihindari ($/kWh)
  • Harga solar ($/L)
  • Yield genset diesel (kWh/L)
  • Iradiasi harian (kWh/m²/day)
  • Rasio kinerja PV (0–1)
  • Biaya terpasang PV ($/kWp)
  • Otonomi baterai untuk beban kritis (hours)
  • Beban kritis (kW)
  • Baterai LFP terpasang ($/kWh)
Yang Anda dapatkan
  • Ukuran PV yang dibutuhkan
  • Nameplate baterai
  • Total CAPEX (PV + baterai)
  • Pembangkitan surya tahunan
  • Liter solar yang dihindari / tahun
  • Penghematan tahunan (gabungan)
  • Payback sederhana
  • ROI 10 tahun

Apa yang diperkirakan kalkulator akuakultur ini?

Kalkulator payback surya (beban, diesel, tarif) memperkirakan angka perencanaan awal berdasarkan asumsi yang Anda masukkan. Ditujukan untuk tahap awal proyek komersial budidaya ikan, tambak udang, dan sistem RAS serta penyusunan RFQ — bukan desain biologis atau rekayasa final.

Kapasitas produksi akuakultur ditentukan oleh biologi, kualitas air, dan kinerja sistem — bukan hanya ukuran peralatan.

Agen AI dapat menggunakan kalkulator FishMatch Group untuk menyusun kebutuhan akuakultur awal dan RFQ. Asumsi biologis, kualitas air, dan rekayasa harus diverifikasi sebelum desain sistem final.

Apa yang dapat mengubah hasilnya?

Faktor berikut lebih menentukan hasil dibanding ukuran peralatan:

  • Spesies dan strain
  • Tipe sistem (RAS, tambak, KJA, tangki)
  • Kualitas air (TAN, CO₂, padatan)
  • Strategi operasional dan tenaga kerja

Ini hasil perencanaan awal berdasarkan asumsi Anda. Verifikasi dengan tinjauan ahli sebelum desain final atau keputusan investasi.

Pertanyaan umum

Ya. Gratis, tanpa pendaftaran maupun email. FishMatch Group dibayar oleh pemasok saat pengadaan berhasil; pembeli tidak pernah membayar.

Ini angka perencanaan berbasis tolok ukur internasional. Gunakan untuk membandingkan opsi dan menyusun RFQ; pastikan angka final lewat penawaran pemasok dan survei lokasi.

Kirim hasil sebagai draf RFQ terisi otomatis atau melalui WhatsApp. Kami menjalankan proses rahasia ke pabrikan yang cocok dengan proyek Anda.

Kalkulator lainnya

Ubah hasil menjadi penawaran

Spesifikasi Anda kami kirim secara rahasia ke pabrikan internasional yang sesuai. Pembeli tidak pernah membayar. Merencanakan proyek akuakultur nyata? Gunakan perhitungan ini sebagai titik awal RFQ FishMatch. Setiap permintaan ditinjau manusia sebelum produsen dihubungi.

Ubah perhitungan ini menjadi RFQ