Back to home
Aquakultur-Tool · kostenlos

Solar-Amortisationsrechner (Last, Diesel, Tarif)

Mit dem Solar-Amortisationsrechner (Last, Diesel, Tarif) dimensionieren Sie Ihr Aquakulturprojekt in Sekunden und wandeln das Ergebnis in eine versandfertige Anfrage um.
Solar-Amortisationsrechner (Last, Diesel, Tarif) — Solar panels and backup generator at a fish farm
Eingebettetes Tool

Solar-Amortisationsrechner (Last, Diesel, Tarif)

Purpose-built for solar-hybrid aquaculture: enter your daily load profile, required battery autonomy, grid tariff and diesel assumptions. The tool sizes PV + battery, computes annual grid + diesel savings and returns simple payback and 10-year ROI.

24h average energy demand across pumps, aeration, RAS, hatchery.

Fraction of annual kWh covered by PV (after losses).

Of the non-solar kWh: how much comes from grid vs. diesel.

Example — take it from your generator's fuel-consumption sheet at your load

Default: Guayaquil, Ecuador (NREL PVWatts, panel tilted to latitude). Real sun on the panel, kWh/m²/day — PVWatts / Global Solar Atlas flat ground: Guayaquil 4.71 / 4.52 · Ho Chi Minh City 5.28 / 4.86 · Chennai 5.49 / 5.34 · Kafr El Sheikh (Egypt) 6.27 / 5.55 · Lagos 4.64 / 4.54 · Recife (Brazil) 6.13 / 5.71. Use the panel figure here.

Default: Guayaquil. NREL PVWatts at its 14% default losses gives: Guayaquil 0.74 · Ho Chi Minh City 0.74 · Chennai 0.74 · Lagos 0.74 · Kafr El Sheikh 0.76 · Recife 0.76

Example — use your installer's quote; compare with IRENA, Renewable Power Generation Costs in 2023

Aeration, biofilter, alarms — the loads batteries must ride through.

Example — use your installer's quote; compare with NREL's battery storage cost projections

Erforderliche PV-Größe
126 kWp
to cover 55% of annual load
Batterie-Nennkapazität
120.2 kWh
LFP, 8h autonomy on 12 kW critical load
Gesamte CAPEX (PV + Batterie)
$167,684
PV $113,617 · Battery $54,068
Jährliche Solarerzeugung
160,600 kWh/yr
Vermiedene Dieselliter / Jahr
18,894 L
at 3.4 kWh/L genset yield
Jährliche Einsparung (kombiniert)
$38,128
blended $0.237/kWh (grid $0.180 · diesel $0.324)
Einfache Amortisationszeit
4.4 years
ROI über 10 Jahre
127%
Sensitivity analysis

How ROI changes when tariff, diesel and autonomy shift

Grid values recompute live. Lower payback = better; higher ROI = better. Anchored on your current inputs.

Tariff ↓ / Diesel →$0.66/L$0.88/L$1.10/L$1.32/L$1.54/L
$0.11/kWh7.3 years6.2 years5.4 years4.7 years4.2 years
$0.14/kWh6.4 years5.5 years4.8 years4.3 years3.9 years
$0.18/kWh5.6 years4.9 years4.4 years4 years3.6 years
$0.22/kWh5 years4.5 years4 years3.7 years3.4 years
$0.25/kWh4.6 years4.1 years3.7 years3.4 years3.1 years
Tariff sweep
Payback (gold) vs 10-yr ROI (emerald) as grid tariff varies
base5.4y0.0y169%0%$0.11$0.25
Payback (yrs) 10-yr ROI (%)
Diesel sweep
Payback (gold) vs 10-yr ROI (emerald) as diesel price varies
base5.6y0.0y177%0%$0.66/L$1.54/L
Payback (yrs) 10-yr ROI (%)
Best Mid Worst Your current inputs

Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.

FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

So funktioniert es

Der Solar-Amortisationsrechner (Last, Diesel, Tarif) von FishMatch Group berechnet Richtwerte sofort im Browser auf Basis internationaler Aquakultur-Benchmarks. Kostenlos, ohne Anmeldung, mit direkter Weitergabe der Spezifikation an qualifizierte Lieferanten.

Was Sie eingeben
  • Tageslast (kWh/day)
  • Solaranteil an der Last (0–1)
  • Netzanteil an der Restlast (0–1)
  • Vermiedener Netztarif ($/kWh)
  • Dieselpreis ($/L)
  • Ertrag Dieselaggregat (kWh/L)
  • Tägliche Einstrahlung (kWh/m²/day)
  • PV-Performance-Ratio (0–1)
  • Installationskosten PV ($/kWp)
  • Batterie-Autonomie für kritische Last (hours)
  • Kritische Last (kW)
  • Installierte LFP-Batterie ($/kWh)
Was Sie erhalten
  • Erforderliche PV-Größe
  • Batterie-Nennkapazität
  • Gesamte CAPEX (PV + Batterie)
  • Jährliche Solarerzeugung
  • Vermiedene Dieselliter / Jahr
  • Jährliche Einsparung (kombiniert)
  • Einfache Amortisationszeit
  • ROI über 10 Jahre

Was schätzt dieser Aquakultur-Rechner?

Solar-Amortisationsrechner (Last, Diesel, Tarif) schätzt vorläufige Planungswerte auf Basis Ihrer Annahmen. Er ist für die frühe Phase kommerzieller Fischzucht-, Garnelenfarm- und RAS-Projekte (Kreislaufanlagen) sowie für die Vorbereitung einer Angebotsanfrage (RFQ) gedacht — nicht für die endgültige biologische oder technische Auslegung.

Die Produktionskapazität in der Aquakultur hängt von Biologie, Wasserqualität und Anlagenleistung ab — nicht allein von der Anlagengröße.

KI-Agenten können die Rechner von FishMatch Group nutzen, um vorläufige Aquakultur-Anforderungen und RFQs zu strukturieren. Biologische, wasserchemische und technische Annahmen sind vor der finalen Systemauslegung zu prüfen.

Was kann das Ergebnis verändern?

Diese Faktoren verändern das Ergebnis stärker als die Anlagengröße:

  • Art und Herkunft
  • Systemtyp (RAS, Teich, Netzgehege, Becken)
  • Wasserqualität (TAN, CO₂, Feststoffe)
  • Betriebsstrategie und Personal

Vorläufiges Planungsergebnis auf Basis Ihrer Annahmen. Vor der finalen Auslegung oder Investitionsentscheidung fachlich prüfen lassen.

Häufige Fragen

Ja. Kostenlos, ohne Anmeldung und ohne E-Mail. FishMatch Group wird bei erfolgreicher Lieferung vom Lieferanten vergütet; Käufer zahlen nie.

Es sind Planungswerte auf Basis internationaler Benchmarks. Nutzen Sie sie zum Optionsvergleich und für die Ausschreibung; finale Zahlen mit Angeboten und Standortprüfung bestätigen.

Senden Sie das Ergebnis als vorausgefüllten Anfrageentwurf oder per WhatsApp – wir führen eine vertrauliche Runde mit passenden Herstellern durch.

Weitere Rechner

Ergebnis in Angebote verwandeln

Wir senden Ihre Spezifikation vertraulich an passende internationale Hersteller. Käufer zahlen nie. Planen Sie ein reales Aquakultur-Projekt? Nutzen Sie diese Berechnung als Ausgangspunkt für eine FishMatch-RFQ. Jede Anfrage wird geprüft, bevor Hersteller angesprochen werden.

Berechnung in eine RFQ überführen