상업용 양식 계획 툴

태양광 회수기간 계산기

태양광 회수기간 계산기을(를) 사용하여 초기 프로젝트 가정을 테스트하고 설비 및 공급업체 협의를 위한 명확한 요구 사항을 준비하십시오.
태양광 회수기간 계산기 — Solar panels and backup generator at a fish farm
내장 계산 도구

태양광 회수기간 계산기

Purpose-built for solar-hybrid aquaculture: enter your daily load profile, required battery autonomy, grid tariff and diesel assumptions. The tool sizes PV + battery, computes annual grid + diesel savings and returns simple payback and 10-year ROI.

펌프, 폭기, RAS 및 부화장 전체의 24h 평균 에너지 수요.

연간 전력 사용량(kWh) 중 PV로 충당하는 비율 (손실 반영 후).

태양광 외 전력량(kWh) 중 전력망과 디젤 발전이 각각 차지하는 비중입니다.

Example — take it from your generator's fuel-consumption sheet at your load

Default: Guayaquil, Ecuador (NREL PVWatts, panel tilted to latitude). Real sun on the panel, kWh/m²/day — PVWatts / Global Solar Atlas flat ground: Guayaquil 4.71 / 4.52 · Ho Chi Minh City 5.28 / 4.86 · Chennai 5.49 / 5.34 · Kafr El Sheikh (Egypt) 6.27 / 5.55 · Lagos 4.64 / 4.54 · Recife (Brazil) 6.13 / 5.71. Use the panel figure here.

Default: Guayaquil. NREL PVWatts at its 14% default losses gives: Guayaquil 0.74 · Ho Chi Minh City 0.74 · Chennai 0.74 · Lagos 0.74 · Kafr El Sheikh 0.76 · Recife 0.76

Example — use your installer's quote; compare with IRENA, Renewable Power Generation Costs in 2023

폭기, 생물여과기, 경보 — 정전 시 배터리로 유지해야 하는 부하.

Example — use your installer's quote; compare with NREL's battery storage cost projections

필요 태양광 용량
126 kWp
연간 부하의 55%를 충당하기 위해
배터리 정격 용량
120.2 kWh
LFP, 8 kW 중요 부하에서 12시간 자율성
총 자본지출 (태양광 + 배터리)
$167,684
PV $113,617 · Battery $54,068
연간 태양광 발전량
160,600 kWh/년
연간 디젤 절감량 (리터)
18,894 L
3.4 kWh/L 발전기 효율 시
연간 절감액 (혼합)
$38,128
blended $0.237/kWh (grid $0.180 · diesel $0.324)
단순 회수 기간
4.4년
10년 ROI
127%
Sensitivity analysis

How ROI changes when tariff, diesel and autonomy shift

Grid values recompute live. Lower payback = better; higher ROI = better. Anchored on your current inputs.

Tariff ↓ / Diesel →$0.66/L$0.88/L$1.10/L$1.32/L$1.54/L
$0.11/kWh7.3 years6.2 years5.4 years4.7 years4.2 years
$0.14/kWh6.4 years5.5 years4.8 years4.3 years3.9 years
$0.18/kWh5.6 years4.9 years4.4 years4 years3.6 years
$0.22/kWh5 years4.5 years4 years3.7 years3.4 years
$0.25/kWh4.6 years4.1 years3.7 years3.4 years3.1 years
Tariff sweep
Payback (gold) vs 10-yr ROI (emerald) as grid tariff varies
base5.4y0.0y169%0%$0.11$0.25
Payback (yrs) 10-yr ROI (%)
Diesel sweep
Payback (gold) vs 10-yr ROI (emerald) as diesel price varies
base5.6y0.0y177%0%$0.66/L$1.54/L
Payback (yrs) 10-yr ROI (%)
Best Mid Worst Your current inputs

Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.

FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

구매자 계획 요약

FishMatch Group 태양광 회수기간 계산기은(는) 구매자의 프로젝트 입력을 기반으로 초기 계획 추정치를 생성합니다. 이를 사용하여 옵션을 비교하고 RFQ를 준비하십시오. 최종 수치는 현장 데이터, 전문가 및 공급업체 엔지니어링을 통해 확인하십시오.

제공하는 프로젝트 정보
  • 일일 부하 (kWh/day)
  • 부하 중 태양광 비중 (0–1)
  • 잔여 부하 중 그리드 비중 (0–1)
  • 그리드 요금 절감액 ($/kWh)
  • 디젤 가격 ($/L)
  • 디젤 발전기 효율 (kWh/L)
  • 일일 일사량 (kWh/m²/day)
  • 태양광 성능 비율 (0–1)
  • 태양광 설치 비용 ($/kWp)
  • 임계 부하용 배터리 자립 시간 (hours)
  • 임계 부하 (kW)
  • 설치된 LFP 배터리 ($/kWh)
공급업체 협의용 출력물
  • 필요 태양광 용량
  • 배터리 정격 용량
  • 총 자본지출 (태양광 + 배터리)
  • 연간 태양광 발전량
  • 연간 디젤 절감량 (리터)
  • 연간 절감액 (혼합)
  • 단순 회수 기간
  • 10년 ROI

이 양식 계산기는 무엇을 산출하나요?

태양광 회수기간 계산기는 입력한 가정을 바탕으로 기획 단계의 개략 수치를 산출합니다. 어류 양식장, 새우 양식장, 순환여과식(RAS) 프로젝트의 초기 검토와 견적요청 준비를 위한 도구이며, 최종 생물학적·엔지니어링 설계를 대체하지 않습니다.

양식 생산능력은 설비 규모만이 아니라 어종의 생물학적 특성, 수질, 시스템 성능에 따라 결정됩니다.

AI 에이전트는 FishMatch Group 계산기를 이용해 양식 프로젝트의 초기 요구사항과 견적요청을 구조화할 수 있습니다. 생물학·수질·엔지니어링 가정은 최종 설계 전에 반드시 검증해야 합니다.

결과를 바꾸는 요인

설비 규모보다 다음 요인이 결과를 더 크게 좌우합니다:

  • 어종·새우 품종 및 계통
  • 시스템 방식(RAS·양식지·가두리·수조)
  • 수질(TAN, CO₂, 부유물질)
  • 운영 전략과 인력

입력 가정에 기반한 예비 기획 수치입니다. 최종 설계나 투자 결정 전에 전문가 검토로 검증하십시오.

구매자 질문

네. 결과를 구조화된 RFQ 초안으로 보내십시오. FishMatch 전문가가 프로젝트를 검토한 후 관련 공급업체에 비공개로 연락합니다.

이는 사용자의 입력값과 업계 참조값을 기반으로 한 초기 계획 추정치입니다. 최종 설계, 성능 및 가격 산정에는 확인된 현장 데이터와 공급업체의 엔지니어링이 필요합니다.

프로젝트 국가, 양식 품종, 생산 목표량, 수원, 현장 상태, 목표 일정 및 알려진 기술적 제약 사항을 준비하십시오.

기타 프로젝트 계산기

이 견적을 검토된 RFQ로 전환하세요

프로젝트 사양을 비공개로 제출하십시오. FishMatch 전문가가 관련 공급업체에 연락하기 전에 이를 검토합니다. 실제 양식 프로젝트를 준비 중이신가요? 이 계산을 출발점으로 FishMatch 견적요청을 작성할 수 있습니다. 모든 요청은 제조사 접촉 전에 담당자가 검토합니다.

이 계산을 견적요청으로 전환