FishMatch project desk
Commercial shrimp and fish farm projects in Indonesia
Commercial aquaculture investment in Indonesia centres on intensive vannamei shrimp in HDPE-lined ponds (Lampung, East Java, Sulawesi, NTB), tilapia in lake cages and ponds, and feed and hatchery capacity. A 100-tonne intensive shrimp cluster usually needs roughly USD 400,000–1 million for ponds, aeration and power; integrated projects run to several million dollars. FishMatch helps structure the project and compare equipment, hatchery and EPC offers through one reviewed RFQ.
Typical project sizes and planning budgets
| Project | System | Indicative budget | Main equipment |
|---|---|---|---|
| 100 t/yr | Intensive lined shrimp ponds | USD 400,000–1 million | HDPE liners, paddlewheels, central drains, generators |
| 500 t/yr | Shrimp farm cluster with nursery | USD 2–4 million | Nursery raceways, reservoirs, automation, power |
| 1,000 t/yr | Tilapia lake cages | USD 1–2.5 million | HDPE cages, moorings, feed barge, harvest boats |
| Hatchery | Vannamei post-larvae | USD 0.8–2.5 million | Broodstock, algae, artemia, biosecure larval rearing |
| 3 t/hr | Floating feed mill | USD 1.5–4 million | Extruder, grinding, mixing, drying, bagging |
Indicative planning ranges for equipment and construction, excluding land. Not quotes.
Why this market
- Indonesia is among the world's largest shrimp and tilapia producers, and the government targets strong growth in shrimp exports.
- The industry is shifting from traditional tambak to intensive and super-intensive lined ponds, which need heavy aeration, backup power and sludge management.
- Feed and benur (post-larvae) supply are the main bottlenecks, so hatchery and feed mill projects are growing alongside grow-out farms.
Equipment we source
- Paddlewheel and diffused aeration with redundancy
- HDPE pond lining and central drain systems
- Automatic feeders and DO monitoring with alarms
- Hatchery and nursery systems
- HDPE cages and moorings
- Feed extrusion lines
What buyers here ask for
Local checks before you send an RFQ
- Business licensing through OSS and KKP aquaculture permits
- Coastal zoning and environmental (AMDAL/UKL-UPL) approvals
- Grid capacity or generator plan for aeration
- Import duties and SNI requirements for equipment
- CBIB/ASC certification if targeting export buyers
How it works
- Tell us what you are building: species, tonnes per year, site and water source.
- Run the cost calculator to get a planning range before you talk to suppliers.
- Send one structured RFQ with capacity, system type, power, budget and target start date.
- A FishMatch project lead reviews it and shortlists 3–5 suitable manufacturers, integrators or EPC contractors.
- You compare like-for-like quotes; supplier identities are shared only when you move forward.
Questions buyers ask
How much does an intensive shrimp farm cost in Indonesia?
As a planning range, a 100-tonne intensive lined-pond cluster often needs USD 400,000–1 million for ponds, aeration, feeding and power, excluding land. Nursery, reservoirs and a hatchery raise the budget. Confirm with supplier quotes.
What equipment does an Indonesian shrimp farm need?
HDPE lining and central drains, paddlewheel and diffused aeration with redundancy, automatic feeders, intake reservoirs and treatment, generators, and DO monitoring with alarms.
Can FishMatch source a feed mill or hatchery for Indonesia?
Yes. Feed mill and hatchery scopes go through the same reviewed RFQ: we define capacity and species, then approach suitable manufacturers and integrators.
Is FishMatch a manufacturer or contractor?
No. FishMatch is an independent, human-reviewed RFQ service. Suppliers and EPC contractors quote and deliver; FishMatch structures the brief and compares offers.
Languages
Other priority markets
Short answer
What is the fastest way to get quotes for Indonesia?
Submit one structured request for Indonesia. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.
- How it works:
- One structured request, human-reviewed before any supplier outreach
- Typical turnaround:
- Depends on scope and site data; no turnaround is guaranteed
- Confidentiality:
- Supplier names are never exposed during evaluation
- Cost to buyers:
- No fee charged to the buyer
What is the fastest way to get quotes for Indonesia?
Submit one structured request for Indonesia. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.
How does FishMatch Group source suppliers for this requirement?
You submit one structured request. We translate it into a technical RFQ, run it against qualified manufacturers and integrators in the relevant categories, and return normalised quotations you can compare side by side on scope, lead time and total cost of ownership.
Do buyers see supplier names during the sourcing process?
No. Supplier identities stay confidential during discovery and evaluation. You receive anonymised, comparable technical and commercial packages, and introductions happen only after both sides are qualified and agree to proceed.