East Asia · 对虾板块

China对虾养殖设备与供应商

FishMatch 是面向China对虾养殖商的私密采购管家。我们将Guangdong, Hainan, Guangxi, Fujian的买家与全球经审核的育苗、RAS、增氧、生物絮团、饲料和加工设备供应商对接 — 全程保密。

融资申请由独立第三方机构审核,批准与条款由其单独决定,不保证获批。
育苗、标粗、成虾及 RAS 设备
L. vannamei 亲虾与 PL 苗种供应
生物絮团、车轮式与吸气式增氧
饲料(开口、生长、育肥)与益生菌
冷链、IQF 与出口加工线,经由 Shenzhen, Guangzhou, Xiamen
$25 万至 $5000 万融资 — 租赁、贸易融资、项目贷款
保密匹配
活跃于East Asia
金融合作伙伴预审

为什么是China

China是全球对虾强国,生产集中于Guangdong, Hainan, Guangxi, Fujian,出口经由Shenzhen, Guangzhou, Xiamen。买家面对碎片化的供应商市场、不透明定价与语言障碍 — FishMatch 消除三大痛点。

我们采购什么

成虾与育苗交钥匙项目、RAS 与生物絮团改造、增氧、水处理、自动投饲、制氧机,以及亲虾与 PL 合作伙伴。供应商名称保密。

融资层

每个对虾项目都可叠加国际融资:设备租赁、ECA 买方信贷、贸易融资(LC/SBLC)与营运资金。我们不是放贷机构。

获取免费私密报价

联系对虾专家

FishMatch Group 及 Global B2B Group 旗下其他平台致力于依照适用法律法规开展自身业务活动。FishMatch 为采购寻源和 RFQ 提供便利;不生产、加工、出口或销售平台所列产品,也不授予任何监管批准。具体要求因产品以及原产国、目的国和过境国而异。 作为买方或进口商,您仍须自行负责取得进口许可、满足当地要求并开展尽职调查。 本声明不改变任何一方的法定义务,也不构成法律意见。 法规与责任
Step 1 of 6Equipment

Confidential matching · Supplier-paid model · No obligation · Human-assisted sourcing

隐私: 我们使用这些信息来审核并答复此请求。 这些信息将予以保密,仅按我们的隐私政策所述方式共享,且除非您另行选择同意,否则不会用于营销。我们会在您的请求或账户处于有效状态期间,以及法律要求保留记录的期限内保留这些信息。 隐私政策 · 您的权利

Financing Disclaimer: FishMatch Group supports procurement project preparation, not credit decisions. Optional introductions require separate explicit consent before sharing. Availability is subject to provider confirmation and local law. This is not pre-approval, an offer, underwriting or a recommendation. Referral, packaging and compensation arrangements require local legal review. See Terms.

Size your harvest vacuum before you request quotes

Embedded tool

Shrimp Harvest Vacuum & Pump Sizing

Shrimp harvest vacuum (fish pump) systems are specified by live product throughput, the water carried with the product, hose diameter, lift height and the vacuum level the pump must hold without damaging the animals. Size the duty here, then request comparable quotes on the same spec.

Shorter windows raise pump size and cooling/ice demand.

2–4 typical for vannamei; gentler handling needs more water.

1.5–2.0 m/s keeps shrimp intact; above 2.5 m/s raises damage.

Required throughput
4 t/hr
12,000 kg in 3 h
Total pumped flow
16 m³/hr
12 m³/hr water + 4 m³/hr product
Hose / pipe diameter
56 mm
At 1.8 m/s design velocity — round up to the next standard size
Vacuum level required
0.51 bar
≈ 382 mmHg — static lift 4 m plus hose friction
Total dynamic head
7.2 m
Lift + hose friction + discharge allowance
Installed pump power
0.7 kW
Shaft 0.5 kW at 60% efficiency + 25% margin

Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.

FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

FAQ

不能。在双方同意推进之前,供应商身份保密。

需求主要来自Guangdong, Hainan, Guangxi, Fujian。我们匹配已在这些地区供货、安装并提供售后的供应商,因此交期与备件物流是切实可行的。

China的项目通常养殖L. vannamei。品种决定增氧负荷、换水率、投喂策略与收获方式,请在需求中注明品种,报价才能按正确规格给出。

货物通常经Shenzhen, Guangzhou, Xiamen清关。报价可按 FOB、CIF 或 DAP 出具,便于在同一基准上比较到岸成本、关税与内陆运输。

可以。请使用免费的池塘容积、放养密度和虾场成本计算器确定面积、生物量与预算,再将结果随询价一并发送,使各供应商按同一规格报价。

水车式增氧机、风机、水泵、投饵机和防渗膜等常备件通常出厂 2–4 周,海运至Shenzhen, Guangzhou, Xiamen另需 3–6 周。定制设备(RAS 撬装、转鼓过滤器、制氧机、加工线)生产周期 8–16 周。清关、进口许可以及养殖场或场地审批没有固定时长:由China主管部门决定,并取决于产品、文件和场地。请按四部分编排进度——各主管部门对您申请所公布的办理时限、进口商在装运前须备齐的文件、供应商生产与运输时间,以及清关后运至Guangdong, Hainan, Guangxi, Fujian的内陆运输和安装。请各主管部门书面确认现行时限,并将交货日期设为以清关为前提。

先确定水体容积与目标生物量,再设定换水或循环率、收获流量与固形物负荷。真空收获泵按流量(m³/h)、吸程、软管直径与固形物通过能力选型;增氧按峰值生物量的每公顷千瓦数计算。建议先运行收获真空泵、池塘容积与放养密度计算器,使各供应商按同一工况报价。

标准单证包括商业发票、装箱单、提单或空运单、原产地证、HS 编码,必要时还需进口许可证。机械设备通常需要 CE 或同等符合性声明、与当地电压频率匹配的电气参数、说明书及备件清单。活体动物、饲料和生物制品需另行取得China主管部门的兽医或卫生证书。

经Shenzhen, Guangzhou, Xiamen出口通常需要主管部门出具的卫生证书、养殖场注册信息、HACCP 与可追溯记录、原产地证,出口欧盟/美国/日本还需按买方要求提供药残与抗生素检测报告。冷链与加工线规格应据此规划,从投产即合规。

报价可按 FOB、CIF 或 DAP Shenzhen, Guangzhou, Xiamen。FOB 由买方承担运费、保险、关税与内陆运输;CIF 含海运费与保险;DAP 送达现场。关税与增值税仍由进口方承担。安装调试单独报价(仅指导或全交钥匙),我们会标明哪些供应商在Guangdong, Hainan, Guangxi, Fujian已有服务网络。

China需联系的审批事项与主管部门:虾场项目询价页面(英文) →

China进出口单证清单

在下达设备订单或经Shenzhen, Guangzhou, Xiamen出口成品前,请逐项核对本清单。单证不全是产生滞期费、延误调试和货物被拒的最常见原因。

设备进口至China

  • 与采购订单逐条对应的商业发票与装箱单
  • 收货人与通知方填写正确的提单或空运单
  • 原产地证及每台设备已确认的 HS 编码
  • 所属品类需要时的进口许可证
  • CE 或同等符合性声明,电气参数匹配当地电压与频率
  • 操作手册、电气图纸及推荐备件清单
  • 保险单及约定的贸易术语(FOB / CIF / DAP)
  • 活体动物、饲料及生物制品的兽医或卫生证书

从China出口对虾产品

  • 主管部门出具的卫生证书
  • 养殖场或加工厂注册与批准编号
  • 按生产批次的 HACCP 计划与可追溯记录
  • 原产地证及优惠贸易相关单证
  • 面向欧盟/美国/日本买家的药残与抗生素检测报告
  • 从收获到装箱的冷链温度记录
  • 装箱报告、铅封号及必要的植检附件

本清单仅供规划参考——请务必与报关行及China主管部门确认现行要求。

FishMatch Group 是私密采购管家,并非放贷机构或金融机构。供应商身份保密。融资以第三方审批为准。