Request a RAS or shrimp farm quote

For farmers planning a new farm or upgrading an existing site. Share your country, species, production target, water and power conditions, equipment scope, budget and timing with the FishMatch project team.

Free for buyers · Managed projects from USD 250,000 · Private, human-reviewed requests. Our team reviews your requirements before approaching providers; quotations depend on scope and supplier responses. No automatic quote or direct supplier contact is promised.

Aquaculture Project RFQ: RAS, Shrimp Farms & Equipment

Four short steps. Choose seafood products or equipment and projects — each goes to its own review lane.

Shrimp farm project? Start the shrimp RFQ wizard — it asks for pond area or tank volume, stocking density and target harvest weight.

Need to send a full technical brief? Open the detailed form.

The buyer journey in five steps
  1. 1. Submit a structured RFQ
  2. 2. We clarify and identify options
  3. 3. We coordinate supplier questions
  4. 4. We help review what was received
  5. 5. You decide; we coordinate next steps

We coordinate sourcing and procurement introductions for buyers. We do not own goods, and we are not the producer, manufacturer, seller of record, importer of record, inspection laboratory, customs broker or carrier. Your RFQ goes to the FishMatch team, not to a public board. You review what will be shared before outreach, and project details go to potential suppliers only as needed to obtain responses. Your company name and contact details are not passed to suppliers without your approval. Supplier communications stay mediated by our team, and supplier names and direct contact details are not shown in the buyer experience. See how we work

Buyer guide

Aquaculture Procurement RFQ: What Fish Farming Suppliers Need

The form above covers the details fish farming suppliers need to quote. These points explain why each one matters.

  1. 1.Write one specification first

    Species, target tonnes per year, system type, site, water source and budget. Quotes built on the same brief can be compared line by line; quotes built on different assumptions cannot.

  2. 2.Ask for the same delivery terms

    Request every price on the same Incoterms® 2020 rule (for example FOB or CIF, named port). Mixed terms hide freight, insurance and duty differences (ICC).

  3. 3.Separate equipment from design and installation

    Ask suppliers to price equipment, engineering, installation supervision, commissioning and training as separate lines, so missing scope is visible.

  4. 4.Check the technical basis

    For RAS, ask how flow, oxygen and biofilter capacity were sized from the feed load — the method in Timmons & Ebeling is a common reference.

  5. 5.Confirm certification needs early

    If your buyers require ASC or BAP, tell suppliers before design and check the applicable standard. FAO's certification guidelines provide a broader reference for environmental, social, food-safety and animal-health criteria; they do not certify a supplier or a project.

  6. 6.Compare total cost, not unit price

    Include spares, warranty terms, currency, payment milestones and lead time. The lowest equipment price is not always the lowest project cost.

How FishMatch Group handles aquaculture procurement

A specialist reviews your brief, asks for anything missing, then contacts relevant suppliers privately. Available proposals are organised in one comparison, line by line, with differences and exclusions identified. FishMatch Group is supplier-neutral: it does not manufacture equipment, build or operate farms, or lend. Supplier names, websites and contact details stay confidential. We do not guarantee a number of proposals, the lowest price or financing approval.

Open the RFQ form →

Planning a shrimp farm? Get a free cost estimate from your pond size, stocking density and harvest goals

Sources

Short answer

How do you prepare a reviewed RFQ for RFQ Intake?

Submit a private request for RFQ Intake with the country, scope, capacity or volume and timing. FishMatch Group is a human-reviewed sourcing and RFQ platform within Global B2B Group: its team clarifies the requirement, researches independent providers and helps compare any replies. It is not the producer, supplier, contractor or operator. No quotation, availability or outcome is guaranteed; the buyer decides whether to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer
How do you prepare a reviewed RFQ for RFQ Intake?

Submit a private request for RFQ Intake with the country, scope, capacity or volume and timing. FishMatch Group is a human-reviewed sourcing and RFQ platform within Global B2B Group: its team clarifies the requirement, researches independent providers and helps compare any replies. It is not the producer, supplier, contractor or operator. No quotation, availability or outcome is guaranteed; the buyer decides whether to proceed.

How does FishMatch Group source suppliers for this requirement?

Submit a private RFQ with the country, product or project scope, capacity or volume and timing. The FishMatch team reviews it, clarifies missing details and researches independent providers before approved outreach. Any received proposals are compared on the same scope; FishMatch is not the supplier, manufacturer, contractor or operator, and does not guarantee a response or outcome.

Do buyers see supplier names during the sourcing process?

No. Supplier identities stay confidential during discovery and evaluation. You receive anonymised, comparable technical and commercial packages, and introductions happen only after both sides are qualified and agree to proceed.

Before you request quotes

Supplier selection criteria

How should a buyer compare aquaculture suppliers?

Compare on evidence, not on presentation: delivered projects at a similar scale and climate, engineering support during design, lead time commitments, spare-part and service availability in your region, certification and testing documentation, payment and warranty terms, and willingness to quote against your specification rather than substituting a catalogue package.

What are the warning signs in a supplier quotation?

Treat these as review triggers: no itemised scope, guaranteed biological or financial performance, no named delivery terms or lead time, no spare-parts or service statement, unclear responsibility for installation and commissioning, and equipment sizing that does not reference your water temperature, oxygen demand or biomass targets.

How does FishMatch handle supplier selection?

FishMatch is an independent sourcing service, not a manufacturer or reseller. The buyer submits one structured project request; our team reviews it first and only then contacts suitable suppliers on the buyer's behalf, presenting their responses through FishMatch in a comparable format. Buyers do not contact suppliers directly and nothing is sent automatically. The final choice stays with the buyer.