← All RAS guides

Coastal vs inland RAS: how to choose

Quick answer

Coastal RAS sites make seawater intake simple and suit salmon and marine species, but land and permits are often harder. Inland RAS sites are usually cheaper and closer to consumers, but need a salt or brackish water plan for marine species.

Coastal (onshore) RAS

  • Easy access to seawater for marine species
  • Often higher land prices and stricter coastal permits
  • Exposure to storms and sea-level risks
  • Good for export-oriented farms near ports

Inland RAS

  • Lower land cost and more site options
  • Closer to city markets, fresher product
  • Needs groundwater, brackish water or artificial salt for marine species
  • Discharge of saline water must be planned carefully

How to decide

Compare total cost per kilo delivered to your buyer, not only land price. Include water treatment, salt, energy, transport and permit time in the comparison.

Frequently asked questions

Yes. Several land-based salmon farms operate inland using recirculated seawater or low-salinity water. It requires careful salt management and discharge planning.

Planning a RAS project?

Send one request and our team shortlists suitable RAS suppliers and prepares comparable quotes. Human-reviewed, no automated marketplace.

Related RAS guides

Short answer

What is the fastest way to get quotes for Onshore Vs Inland RAS?

Submit one structured request for Onshore Vs Inland RAS. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.

Supplier selection criteria

How should a buyer compare aquaculture suppliers?

Compare on evidence, not on presentation: delivered projects at a similar scale and climate, engineering support during design, lead time commitments, spare-part and service availability in your region, certification and testing documentation, payment and warranty terms, and willingness to quote against your specification rather than substituting a catalogue package.

What are the warning signs in a supplier quotation?

Treat these as review triggers: no itemised scope, guaranteed biological or financial performance, no named delivery terms or lead time, no spare-parts or service statement, unclear responsibility for installation and commissioning, and equipment sizing that does not reference your water temperature, oxygen demand or biomass targets.

How does FishMatch handle supplier selection?

FishMatch is an independent sourcing service, not a manufacturer or reseller. The buyer submits one structured project request; our team reviews it first and only then contacts suitable suppliers on the buyer's behalf, presenting their responses through FishMatch in a comparable format. Buyers do not contact suppliers directly and nothing is sent automatically. The final choice stays with the buyer.