RAS · Anonymised Reference

Indoor RAS Shrimp Farm

Southeast Asia Intensive indoor shrimp production

Reference scope for an intensive indoor RAS vannamei shrimp farm — nursery and grow-out raceways with biofloc-assisted recirculation, sized from daily feed load rather than tank volume.

Sponsor, site and supplier identities are confidential. Scopes are illustrative; capacities and budgets are defined per project.
Intensive indoor RAS vannamei shrimp farm raceways with aeration and recirculation — aquaculture project procurement reference
Category
RAS
Region
Southeast Asia
Programme
Indicative programme: engineering → procurement → construction → commissioning
Budget
Class-3 budget range developed per project during RFQ preparation

Project scope

  • Nursery and grow-out raceways with biofloc-assisted RAS loops
  • Drum filtration, moving-bed biofilters, degassing and foam fractionation
  • High-duty aeration and oxygenation with emergency backup power
  • Heating, HVAC and building envelope engineered for year-round shrimp temperatures

Highlights

Indoor vannamei RASFeed-load sizing basisSurvival-driven economics
Procurement focus

Reference scope used to prepare a supplier-neutral RFQ covering RAS process equipment, HVAC and redundancy — with quotes compared line by line on identical scope.

Additional project imagery

Inside the ras scope

Biofiltration and water treatment loop supporting the Indoor RAS Shrimp Farm
Biofiltration & water treatment loop
Central process control room monitoring the Indoor RAS Shrimp Farm
Process & control room
Continuous water-quality monitoring dashboards at the Indoor RAS Shrimp Farm
Live water-quality monitoring

Illustrative process imagery. Site-specific photography is not published.

Buyer journey · enquiry to RFQ

How this project moved from a first enquiry to a comparable RFQ

Every FishMatch project follows the same five stages. Nothing is sourced until a person has reviewed the brief, and supplier identities stay confidential until the buyer decides to engage.

  1. 01

    Initial enquiry

    The buyer described a ras project in Southeast Asia in a few lines — species or product, target output and site situation — without naming or contacting a single supplier.

    Result · A confidential brief in the FishMatch desk, acknowledged the same day.

  2. 02

    Brief review

    FishMatch read the brief before any sourcing began, listed the missing decisions and separated what was fixed from what was still an assumption.

    Result · An agreed project definition: system type, production model and the constraints that change equipment selection.

  3. 03

    Sizing and numbers

    Duty figures were established for the ras scope — load, water treatment, aeration or oxygenation, flow and energy — so equipment was specified from numbers rather than catalogue models.

    Result · A sizing basis every supplier quotes against, using the same assumptions.

  4. 04

    Structured RFQ

    The scope was split into lots (nursery and grow-out raceways with biofloc-assisted ras loops and the rest of the package) and issued as one RFQ with identical questions to each shortlisted manufacturer.

    Result · Comparable offers on one sheet: scope, exclusions, lead time and commissioning support.

  5. 05

    Review and handoff

    Offers were normalised, deviations declared, and only then were introductions made manually — supplier identities were held by FishMatch throughout.

    Result · Reference scope used to prepare a supplier-neutral RFQ covering RAS process equipment, HVAC and redundancy — with quotes compared line by line on identical scope.

Confidential enquiry

Planning a project like the Indoor RAS Shrimp Farm?

Request a comparable planning package for a ras project in Southeast Asia or elsewhere. Your enquiry is handled confidentially — sponsor, site and supplier identities are not published.

Typical response · 1 business day
Class-3 CAPEX / OPEX benchmark
3–5 project-matched suppliers
Smart questions

RAS project details

Helps us match the right RAS integrator and size the biofilter, oxygen and control skids correctly.

Documents that help us quote faster

Optional — you can email them after or bring them to the first call. Uploads are private and sent over an encrypted (HTTPS) connection.

  • Site plan or Google Maps pin (PDF / image)
  • Water quality report (TAN, nitrite, alkalinity, salinity, temperature)
  • Existing building drawings if retrofitting
  • Environmental / discharge permit or application (if any)
Aquaculture project details (optional)

Tell suppliers what they need to quote accurately

The more complete your aquaculture project details are, the faster suitable partners can understand your request and respond with realistic options. Leave anything you do not know yet blank — nothing here is required.

Not sure what to write? Answer a few quick questions and we'll draft the brief for you.

Confidential matching · Supplier-paid model · No obligation · Human-assisted sourcing

Privacy: We use these details to review and answer this request. They stay confidential, are shared only as described in our Privacy Policy, and are not used for marketing unless you separately opt in. We keep them while your request or account is active and for as long as legal record-keeping requires. Privacy Policy · Your rights

Short answer

What is the fastest way to get quotes for Indoor RAS Shrimp Farm?

Submit one structured request for Indoor RAS Shrimp Farm. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer