RAS · Anonymised Reference

Indoor RAS Salmon Facility

Northern Europe Commercial-scale grow-out

Reference scope for an indoor recirculating aquaculture salmon grow-out facility with biofiltration, ozone disinfection and heat recovery for cold-climate operation.

Sponsor, site and supplier identities are confidential. Scopes are illustrative; capacities and budgets are defined per project.
Indoor recirculating aquaculture system (RAS) salmon grow-out hall with biofiltration and oxygenation equipment for supplier-neutral aquaculture project procurement
Category
RAS
Region
Northern Europe
Programme
Indicative programme: engineering → procurement → construction → commissioning
Budget
Class-3 budget range developed per project during RFQ preparation

Project scope

  • Grow-out and nursery halls with fully closed RAS loops
  • Drum filters, MBBR biofilters, O₂ cones and CO₂ degassing
  • Ozone and UV disinfection with continuous water quality monitoring
  • Heat recovery, HVAC and building envelope engineered for cold-climate operation

Highlights

Indoor salmon grow-outCold-climate heat recoveryFull biosecurity zoning
Procurement focus

Reference scope used to prepare a supplier-neutral RFQ package covering RAS process equipment, building services and monitoring.

Additional project imagery

Inside the ras scope

Biofiltration and water treatment loop supporting the Indoor RAS Salmon Facility
Biofiltration & water treatment loop
Central process control room monitoring the Indoor RAS Salmon Facility
Process & control room
Continuous water-quality monitoring dashboards at the Indoor RAS Salmon Facility
Live water-quality monitoring

Illustrative process imagery. Site-specific photography is not published.

Buyer journey · enquiry to RFQ

How this project moved from a first enquiry to a comparable RFQ

Every FishMatch project follows the same five stages. Nothing is sourced until a person has reviewed the brief, and supplier identities stay confidential until the buyer decides to engage.

  1. 01

    Initial enquiry

    The buyer described a ras project in Northern Europe in a few lines — species or product, target output and site situation — without naming or contacting a single supplier.

    Result · A confidential brief in the FishMatch desk, acknowledged the same day.

  2. 02

    Brief review

    FishMatch read the brief before any sourcing began, listed the missing decisions and separated what was fixed from what was still an assumption.

    Result · An agreed project definition: system type, production model and the constraints that change equipment selection.

  3. 03

    Sizing and numbers

    Duty figures were established for the ras scope — load, water treatment, aeration or oxygenation, flow and energy — so equipment was specified from numbers rather than catalogue models.

    Result · A sizing basis every supplier quotes against, using the same assumptions.

  4. 04

    Structured RFQ

    The scope was split into lots (grow-out and nursery halls with fully closed ras loops and the rest of the package) and issued as one RFQ with identical questions to each shortlisted manufacturer.

    Result · Comparable offers on one sheet: scope, exclusions, lead time and commissioning support.

  5. 05

    Review and handoff

    Offers were normalised, deviations declared, and only then were introductions made manually — supplier identities were held by FishMatch throughout.

    Result · Reference scope used to prepare a supplier-neutral RFQ package covering RAS process equipment, building services and monitoring.

Confidential enquiry

Planning a project like the Indoor RAS Salmon Facility?

Request a comparable planning package for a ras project in Northern Europe or elsewhere. Your enquiry is handled confidentially — sponsor, site and supplier identities are not published.

Typical response · 1 business day
Class-3 CAPEX / OPEX benchmark
3–5 project-matched suppliers
FishMatch Group and the other Global B2B Group platforms are committed to conducting their own activities in accordance with applicable laws and regulations. FishMatch facilitates sourcing and RFQs; it does not manufacture, process, export or sell the listed products and does not grant regulatory approval. Requirements differ by product and by origin, destination and transit country. As buyer or importer, you remain responsible for your own import permissions, local requirements and due diligence. This notice does not change anyone's legal duties and is not legal advice. Regulation & responsibilities
Step 1 of 6Equipment

Confidential matching · Supplier-paid model · No obligation · Human-assisted sourcing

Privacy: We use these details to review and answer this request. They stay confidential, are shared only as described in our Privacy Policy, and are not used for marketing unless you separately opt in. We keep them while your request or account is active and for as long as legal record-keeping requires. Privacy Policy · Your rights

Short answer

What is the fastest way to get quotes for Indoor RAS Salmon Facility?

Submit one structured request for Indoor RAS Salmon Facility. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer