اعثر على موردي أنظمة الاستزراع المائي بإعادة التدوير (RAS) في النرويج
طلب واحد، وعروض سرية متعددة من موردي أنظمة الاستزراع المائي بإعادة التدوير (RAS) في النرويج. مجاني للمشترين.
Norway — Northern Europe. World leader in Atlantic salmon — sea-cage and land-based RAS. Main farmed species: salmon, trout.
Specify these four figures before requesting quotes
Quotes are only comparable when every supplier prices the same specification. These are the inputs that change everything downstream — fix them first, and the rest of the bill of quantities follows.
Design biomass & density
Peak standing biomass per tank and target kg/m³ at harvest size — every filtration and oxygen figure derives from it.
Recirculation rate
System turnover per hour and daily make-up water, which set pump duty, pipe sizing and heat load.
Oxygen demand at peak
Consumption at maximum temperature and feed load, including safety factor for feeding peaks.
Installed pumping head
Static plus friction head across drum filter, biofilter and degasser; the single most common cause of undersized pumps.
- Mechanical filtration (drum or belt) with sizing basis stated
- Biofilter type, media volume and expected TAN removal
- Degassing / CO₂ stripping and oxygenation equipment
- Disinfection (UV or ozone) with dose at design flow
- Pumps, piping, valves and instrumentation
- Control system, alarms and backup power interface
- Installation, commissioning, training and spares package
- →Recirculation intensity — a higher turnover multiplies pump, filter and energy cost
- →Materials: HDPE vs GRP vs stainless tanks and pipework
- →Automation depth: manual monitoring vs full SCADA with redundancy
- →Redundancy level for oxygen, power and pumping
- →Delivery terms (EXW vs CIF) and included commissioning days
How the sourcing process runs
- Step 1
Structured brief
You submit the project figures once. FishMatch normalises them into a single specification so every supplier answers the same question.
- Step 2
Matched shortlist
Suppliers are selected against the specification, export experience and service reach for your market — never a directory dump.
- Step 3
Comparable quotes
Bids are returned on the same scope, so differences reflect engineering and delivery terms rather than what each vendor chose to include.
- Step 4
Financing review (optional)
Projects that need funding are reviewed for readiness and, where appropriate, introduced to financing partners. FishMatch is not a lender.