اعثر على موردي معدات مزارع الروبيان في الإكوادور
طلب واحد، وعروض سرية متعددة من موردي معدات مزارع الروبيان في الإكوادور. مجاني للمشترين.
Ecuador — South America. World's largest vannamei shrimp exporter. Main farmed species: shrimp.
Specify these four figures before requesting quotes
Quotes are only comparable when every supplier prices the same specification. These are the inputs that change everything downstream — fix them first, and the rest of the bill of quantities follows.
Pond area & lining
Hectares, pond size and whether ponds are earthen, partially or fully HDPE-lined.
Target density & cycles
PL/m² at stocking, survival assumption and cycles per year — this sets aeration and feed logistics.
Aeration demand
Installed kW per hectare at peak biomass, split between paddlewheel, blower and injector aeration.
Water intake & discharge
Pumping capacity, sedimentation and treatment required to meet local discharge rules.
- Paddlewheel / aspirator aeration with kW sizing per pond
- Blowers, diffusers and distribution piping where used
- Intake pumps, reservoir and sedimentation layout
- HDPE liners, geomembrane welding and central drains
- Automatic feeders and feed monitoring
- Water quality monitoring, alarms and standby power
- Harvest, grading and chilling equipment
- →Lining scope — full HDPE lining is the largest single CAPEX swing per hectare
- →Installed aeration kW per hectare and motor efficiency class
- →Automation of feeding and monitoring versus manual operation
- →Standby power sizing for the whole aeration load
- →Freight and duty on bulky, low-density pond equipment
How the sourcing process runs
- Step 1
Structured brief
You submit the project figures once. FishMatch normalises them into a single specification so every supplier answers the same question.
- Step 2
Matched shortlist
Suppliers are selected against the specification, export experience and service reach for your market — never a directory dump.
- Step 3
Comparable quotes
Bids are returned on the same scope, so differences reflect engineering and delivery terms rather than what each vendor chose to include.
- Step 4
Financing review (optional)
Projects that need funding are reviewed for readiness and, where appropriate, introduced to financing partners. FishMatch is not a lender.