Hatchery Procurement Wizard

Hatchery Procurement: build a professional aquaculture procurement package in minutes. Independent, buyer-side, multilingual.

Why buyers choose it

  • Capacity models from 5M to 500M juveniles/year
  • Live feed (rotifer, artemia, copepod) presets
  • Biosecurity SOP checklist attached automatically

Built for

  • Hatchery Owners
  • Genetics Companies
  • Integrated Aquaculture Groups

How it works

  1. Step 1
    Enter species & juveniles/year
    The wizard sizes tank counts, live-feed volumes and biosecurity zones.
  2. Step 2
    Add engineering scope
    RAS loop, air, water intake, ozone/UV, effluent.
  3. Step 3
    Attach genetics requirements
    Certified broodstock lineage, SPF/SPR, disease-free certification.

Start your tender now

The wizard auto-saves every step. You can resume later on any device.

Aquaculture Tender Wizard
Step 1 of 9 · 11%
Auto-save on

Frequently asked questions

Yes. You can request separate bids for civil, engineering and genetics packages.

Yes — a training / knowledge-transfer section is built in.

Related procurement resources

Short answer

What is the fastest way to get quotes for Hatchery Procurement?

Submit one structured request for Hatchery Procurement. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.