Aquaculture Technology

Recirculating Aquaculture Systems (RAS)

Recirculating Aquaculture Systems (RAS) enable high-density, land-based fish production with up to 99% water reuse. FishMatch Group sources complete RAS facilities, oxygenation, degassing, UV and ozone from the world's leading manufacturers. For the filter stage specifically — drum, disc and sand filters, skimmers and MBBR biofilter media — see our dedicated aquaculture filtration systems page.

Key Benefits

  • 95–99% water reuse
  • Year-round production
  • Biosecurity by design
  • Reduced environmental footprint
  • Independence from natural waterbodies
  • Predictable harvest scheduling

Typical Applications

  • Atlantic salmon smolt and post-smolt
  • Trout and Arctic char
  • Tilapia and barramundi
  • Shrimp post-larval and grow-out
  • Hatcheries and nurseries

Specifying the filter stage? Aquaculture filtration systems covers drum, disc and sand filters, protein skimmers and MBBR biofilter media, with matched supplier quotes.

Frequently Asked Questions

Ready to source recirculating aquaculture systems (ras)?

Tell us about your project — we structure the requirement and the RFQ first, then research relevant manufacturers and system providers for that specific plan.

Submit Aquaculture Project Request

Short answer

What is the fastest way to get quotes for RAS Technology?

Submit one structured request for RAS Technology. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.

Get Free QuotesFinancing