Free supplier registration

Aquaculture supplier directory: register your company for review

Manufacturers, integrators, EPC contractors and technology providers can register interest in the FishMatch supplier directory. Every submission is reviewed by the FishMatch team before publication — there is no automatic buyer-to-supplier matching.

Buying, not selling? Create a free buyer account in the FishMatch buyer portal to submit RFQs, follow the human-led sourcing process and view screened proposals in one place.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

Directory segments

Registrations are organised by the segment a company actually serves. Buyers see what to specify for each segment, never a list of company names: FishMatch is buyer-first and supplier-neutral.

RAS technology & integrators

Recirculating systems, water treatment, filtration, oxygenation, monitoring and controls.

  • Full RAS system integration
  • Water treatment & process engineering
  • Filtration & recirculation components
  • Monitoring, sensors & control
  • Oxygenation & gas control

Shrimp systems & equipment

Pond systems, liners, aeration, biofloc and intensive shrimp production equipment.

  • Feeding systems & feed control
  • Biomass estimation & counting
  • Monitoring, sensors & control
  • Pond liners & geomembranes
  • Aeration equipment
  • Pond & tank farming systems

Fish farm equipment

Feeding, grading, pumping, biomass measurement, processing and cold-chain interfaces.

  • Feeding systems & feed control
  • Monitoring, sensors & control
  • Grading, counting & fish handling
  • Biomass estimation & counting
  • Harvest & processing lines
  • Pond & tank farming systems

Cages, nets & offshore

Cage structures, nets, mooring, offshore systems and marine site equipment.

  • Cage systems & floating collars
  • Nets & netting technology
  • Mooring & net-handling systems
  • Offshore & exposed-site structures

Hatchery & incubation

Incubation, larval rearing, nursery systems, water conditioning and biosecurity.

  • Full RAS system integration
  • Incubation & larval rearing equipment
  • Monitoring, sensors & control
  • Grading, counting & fish handling
  • Filtration & recirculation components

How FishMatch reviews registrations

  1. 1. Company registers interest

    You submit company details, country, segments, export markets and certifications. Free, no listing fee.

  2. 2. FishMatch reviews the submission

    The team checks the segments you actually serve, service coverage and whether the details are consistent and verifiable.

  3. 3. Directory entry published or held

    Approved companies are shown publicly only as anonymous capability profiles (reference code, segment, region, certifications). Company names, contact details and websites are never published. Incomplete submissions are held until the missing details are provided.

  4. 4. Considered for reviewed briefs

    When a reviewed commercial brief matches your segment, country coverage and scale, FishMatch may approach you. There is no automatic matching and no guaranteed RFQ volume.

What registration does and does not mean

  • Registration is free and does not create an exclusive or contractual relationship.
  • Supplier names, logos, websites and contact details are never published; buyers only see anonymous capability profiles.
  • An anonymous capability profile is not a recommendation, certification, endorsement or partnership claim.
  • Which suppliers receive a specific buyer brief stays confidential and is decided after review.
  • Availability, pricing and lead times are never guaranteed to either side.
  • You can update or remove your company details at any time using your management link.

FishMatch may maintain supplier and project partner information for research, SEO and RFQ support. This does not mean buyers are connected directly to suppliers through an unmanaged marketplace. FishMatch reviews each commercial project brief before supplier outreach.

How approved suppliers appear to buyers

Buyers never see supplier names here. Each approved registration appears only as an anonymous capability profile with a reference code, segment, region, certifications and export markets. Buyers compare capabilities, then request a quote through FishMatch; the FishMatch team decides which suppliers receive a reviewed brief.

Register your company

Complete the form below. Your submission goes straight to the FishMatch review queue.

FishMatch Group and the other Global B2B Group platforms are committed to conducting their own activities in accordance with applicable laws and regulations. FishMatch facilitates sourcing and RFQs; it does not manufacture, process, export or sell the listed products and does not grant regulatory approval. Requirements differ by product and by origin, destination and transit country. As supplier, producer or exporter, you are responsible, under applicable law, for ensuring that what you offer and supply meets the product, safety, quality, licensing, certification, labelling, traceability, sanitary, export, customs and documentation requirements that apply in the origin and destination countries — for fish, shrimp and live aquatic animals this can include health certificates and catch or production records. This notice does not change anyone's legal duties and is not legal advice. Regulation & responsibilities

Fields marked * are required.

Company
Contact
Scope & markets
Equipment categories

Select everything you manufacture or supply.

Capability details

These answers help our team review your capability against real buyer requirements. Nothing here is published automatically.

Capability submission does not guarantee listing, RFQs, buyer introductions, orders or contracts. Every submission is reviewed by a human before any buyer contact.

Producer-side success fee

What producers pay — only when a transaction closes

FishMatch Group is buyer-first: buyers pay no sourcing fee. Producers — fish and shrimp farms, hatcheries, seafood processors and aquaculture equipment manufacturers — pay a success fee only on each transaction that closes.

Final transaction valueProducer success fee (excl. VAT)
Up to and including USD 10,000,0003% of the transaction value
Above USD 10,000,000 up to and including USD 100,000,0002.5% of the full transaction value
Above USD 100,000,000No published rate — written terms from our team
  • Charged per closed transaction, on the final transaction value, using the bracket that full value falls into.
  • No registration, listing, upfront or monthly fee. If no transaction closes, nothing is owed.
  • This is a producer-side fee. It is not charged to buyers.
  • All rates, examples and calculator results exclude VAT. Applicable Cyprus VAT is added separately on top of the success fee, at the rate legally applicable at the time of invoicing.

Examples (excl. VAT)

  • USD 5,000,000 → USD 150,000 (3%) excl. VATPlus Cyprus VAT: added separately at the rate applicable when invoiced
  • USD 20,000,000 → USD 500,000 (2.5%) excl. VATPlus Cyprus VAT: added separately at the rate applicable when invoiced
  • USD 100,000,000 → USD 2,500,000 (2.5%) excl. VATPlus Cyprus VAT: added separately at the rate applicable when invoiced

Success-fee calculator

Enter the final value of a closed transaction, e.g. 5000000.

Success fee (excl. VAT):
USD 150,000 (3% × USD 5,000,000)
Plus Cyprus VAT:
added separately at the rate applicable when invoiced
How a transaction works

How a transaction works

  1. A buyer submits an RFQ. Our team qualifies scope, specification, volume, timing and budget — managed opportunities start at USD 250,000.
  2. We organise qualified requests into a clear RFQ with requirements and invite suitable producers privately. Registration alone does not guarantee an invitation or a buyer.
  3. You respond to our team with your offer, supporting evidence and terms.
  4. Our team handles every introduction, communication and transaction-coordination step between buyer and producer.
  5. If the transaction closes, the success fee applies to its final value. If it does not close, nothing is owed.

Mediated contact only. Buyer contact details are never published or released for direct contact. All buyer–producer communication runs through our team.

Optional financing assistance. Our team can help buyers or producers look at ways to finance or scale a transaction and, where appropriate, refer them to Ron Maimon. A referral or any sharing of your information happens only with your separate consent. Financing is subject to assessment and third-party terms; we do not promise financing, approval, rates or availability.

Terms version 2026-10-21.2 · Read the full producer terms

FishMatch Group is an independent intermediary. We do not manufacture equipment and do not provide financing directly.

Privacy: We use these details to review your application and, if it is accepted, to run your supplier profile. They stay confidential, are shared only as described in our Privacy Policy, and are not used for marketing unless you separately opt in. We keep them while your request or account is active and for as long as legal record-keeping requires. Privacy Policy · Your rights

Already registered? Update your company details.

Are you a buyer? Use the buyer portal

Farm owners, investors and project developers create a free account, save their project profile, submit structured RFQs and follow each sourcing request from review to screened proposals. FishMatch reviews every request manually — there is no automatic buyer-to-supplier matching from these directory pages.

FishMatch Group is an independent aquaculture project sourcing and RFQ platform. We are not a fish farm, feed producer, equipment manufacturer, EPC contractor, lender, broker-dealer, investment advisor or financial advisor. Supplier and project partner outreach is handled only after a commercial project brief is reviewed.

Short answer

What is the fastest way to get quotes for Supplier Directory?

Submit one structured request for Supplier Directory. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer
What is the fastest way to get quotes for Supplier Directory?

Submit one structured request for Supplier Directory. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How does FishMatch Group source suppliers for this requirement?

You submit one structured request. We translate it into a technical RFQ, run it against qualified manufacturers and integrators in the relevant categories, and return normalised quotations you can compare side by side on scope, lead time and total cost of ownership.

Do buyers see supplier names during the sourcing process?

No. Supplier identities stay confidential during discovery and evaluation. You receive anonymised, comparable technical and commercial packages, and introductions happen only after both sides are qualified and agree to proceed.

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.

Supplier selection criteria

How should a buyer compare aquaculture suppliers?

Compare on evidence, not on presentation: delivered projects at a similar scale and climate, engineering support during design, lead time commitments, spare-part and service availability in your region, certification and testing documentation, payment and warranty terms, and willingness to quote against your specification rather than substituting a catalogue package.

What are the warning signs in a supplier quotation?

Treat these as review triggers: no itemised scope, guaranteed biological or financial performance, no named delivery terms or lead time, no spare-parts or service statement, unclear responsibility for installation and commissioning, and equipment sizing that does not reference your water temperature, oxygen demand or biomass targets.

How does FishMatch handle supplier selection?

FishMatch is an independent sourcing service, not a manufacturer or reseller. The buyer submits one structured project request; our team reviews it first and only then contacts suitable suppliers on the buyer's behalf, presenting their responses through FishMatch in a comparable format. Buyers do not contact suppliers directly and nothing is sent automatically. The final choice stays with the buyer.