Shrimp hatchery guide: capacity, CAPEX and OPEX
Scope a shrimp hatchery request using supplied planning assumptions for 200M and 600M PL, cost composition and project-specific evidence checks.
The figures below were supplied as planning assumptions. Their source date, location and priced scope have not been independently verified. They are not quotations, current market benchmarks, engineering targets or financing terms.
Capacity and cost assumptions
| Capacity | CAPEX (USD) | OPEX (USD) |
|---|---|---|
| 200M PL | $3.5M–$6.5M | $0.8M–$1.5M |
| 600M PL | $7M–$12M | $1.8M–$3.2M |
PL = post-larvae. Capacity period and OPEX period were not supplied; confirm both before using these figures. Land, utilities, freight, permits, taxes, commissioning and working-capital inclusions must be stated.
CAPEX composition assumptions
| Scope | Supplied share |
|---|---|
| Building | 22–30% |
| Tanks | 12–18% |
| Water treatment | 10–16% |
These are partial categories, not a complete budget. Do not force them to total 100% or assume identical shares across sites.
Build a comparable hatchery scope
Separate broodstock, larval rearing, algae or live-feed production, nursery and dispatch. Record water analysis, intake and treatment boundaries, backup utilities, biosecurity, operator training and acceptance criteria. Compare dated quotations with the same capacity basis and explicit exclusions.
Full shrimp hatchery procurement guideQuestions before using the guide
Prepare a private project request
Commercial project procurement starts at USD 250,000. Requests are human-reviewed; supplier identities remain private and introductions require approval. This guide does not create or send a request.