Origin guide

Argentina shrimp exports: wild-caught red shrimp, 2024 figures and EU-listed establishments

Short answer: Argentina exported US$939 million (146,689 t) of frozen shrimp in 2024. Its shrimp comes from the wild-caught Argentine red shrimp (Pleoticus muelleri) trawl fishery, not farming, so catch documentation matters. 408 Argentine establishments — many of them freezer and factory vessels — are on the EU list for fishery products.

Data year 2024 · trade figures checked 21 October 2026 · EU listings checked 23 October 2026

2024 export figures

HS 030613 exports were US$939 million (146,689 t), fourth worldwide. Customs totals do not separate farmed from wild shrimp; for Argentina the supply is associated with the wild red shrimp fishery.

Largest frozen shrimp (HS 030613) exporters, 2024
Exporter2024 valueQuantity
EcuadorUS$6.34 billion1,386,340 t
IndiaUS$4.31 billion666,420 t
IndonesiaUS$1.08 billion135,390 t
ArgentinaUS$939 million146,689 t
ThailandUS$547 million56,772 t
Largest frozen shrimp (HS 030613) exporters, 2024. Source: WITS / UN Comtrade — 2024 exports, HS 030613 frozen shrimps and prawns, all reporters (checked 21 October 2026).

Wild-caught: what changes for buyers

  • Wild-caught fishery products entering the EU need a catch certificate under the EU's IUU rules, in addition to the health certificate.
  • The vessel or plant that froze or processed the product must be on the EU list; for Argentina many listed establishments are vessels.
  • Sustainability or fishery assessments are third-party opinions, not approvals; read their date and scope.

EU-listed fishery establishments

Argentina establishments on the EU list for fishery products: 408 (list updated 29 September 2026).

Freezer vessel 184 · Processing plant 150 · Factory vessel 49 · Cold store 27

One establishment can be listed for more than one activity, so activity counts can add up to more than the total.

Approvals can change: establishments are added, suspended and removed, and these counts are a snapshot read on 23 October 2026. A listing covers fishery products in general — it does not name species or show that a plant handles frozen shrimp — and it does not replace other requirements such as health certificates or IUU catch certificates. FishMatch does not republish establishment names and does not imply any listed plant is a FishMatch supplier. Before contracting, check the live list and the exact approval number, and our team checks named plants during each request review.

Open the live EU establishment lists (TRACES NT)

What to verify before you buy

  1. Catch certificate and vessel identification for each lot where the destination requires it.
  2. The freezer or factory vessel, or the processing plant, on the current EU list.
  3. Size grade as stated in the offer, and whether the product is whole, tail or peeled.
  4. Net weight and glaze basis.

Request a reviewed sourcing round

Free for buyers, for annual or seasonal programs of USD 250,000 or more. A person reviews every request before any producer is approached; buyers and suppliers stay confidential to each other and there is no direct contact. FishMatch Group coordinates sourcing and does not produce, certify, inspect or guarantee products.

Questions

Is Argentine shrimp farmed?
No. Argentine shrimp supply comes from the wild-caught Argentine red shrimp fishery (Pleoticus muelleri), according to the Seafood Watch assessment cited here.
Why are so many Argentine EU-listed establishments vessels?
Much of the catch is frozen at sea. Of 408 listed establishments, 184 are freezer vessels and 49 factory vessels.

Sources