← All RAS guides

RAS technology and food security

Quick answer

RAS supports food security by producing fish close to consumers, all year round, with low water use and less dependence on imports or wild catch. It suits water-scarce and import-dependent countries.

Local, year-round supply

Indoor systems are less affected by weather and seasons, allowing regular harvests close to city markets.

Water and land efficiency

RAS produces high volumes on small land areas and recycles most of its water, which matters where water is scarce.

Sustainable Development Goals

  • SDG 2: zero hunger
  • SDG 6: clean water and sanitation
  • SDG 12: responsible production
  • SDG 14: life below water

Public programs and financing

Many governments and development banks support aquaculture projects that reduce imports. A clear business plan and comparable supplier quotes improve the chance of financing.

Frequently asked questions

Gulf states, parts of North Africa, and several Asian countries are among those investing in local aquaculture to reduce seafood imports.

Planning a RAS project?

Send one request and our team shortlists suitable RAS suppliers and prepares comparable quotes. Human-reviewed, no automated marketplace.

Related RAS guides

Short answer

What is the fastest way to get quotes for RAS And Food Security?

Submit one structured request for RAS And Food Security. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.