Premium collection · Caviar

Sturgeon Caviar Sourcing — CITES Permits, Labelling and Buyer Checks

Reviewed 2026-10-24

Short answer: Commercial caviar trade needs CITES documents: most sturgeon species are listed in Appendix II, and two species are in Appendix I with commercial trade generally prohibited. Every container must carry a universal CITES label identifying source and origin. Check permits before any offer.

Atlantic salmon swimming in clear blue water inside a large aquaculture tank
Atlantic salmon in a clear farm tank — collection photograph; it does not show caviar or any supplier product. Original illustrative photograph created for FishMatch.

Specification criteria

  • Species identified by scientific name and CITES appendix.
  • Source code (e.g. captive-bred or wild) and country of origin on the label.
  • Universal CITES labelling on every primary container, including repackaged caviar.
  • Product details: salting, pasteurisation, tin size and storage temperature.

Buyer fit

  • Importers with CITES import capability
  • Food-service and retail buyers with specialist cold chain

Commercial benefits

  • High-value product where documentation is standardised by CITES

Risks to manage

  • Trade in Appendix I species (Acipenser sturio, A. brevirostrum) is generally prohibited commercially.
  • Missing or invalid permits lead to seizure.
  • Mislabelled species or origin.

Limitations

  • Personal-baggage exemptions (e.g. 125 g in Spain) do not apply to commercial shipments.
  • QR codes on caviar labels were discussed by CITES in 2025 but are not a requirement.

Documents to request

  • CITES export permit and, where required, import permit.
  • Universal caviar label details for each container.
  • Health certificate and establishment approval for the destination.

Regulatory notes

  • CITES Appendix II for most sturgeon and paddlefish; Appendix I for two species.
  • EU: caviar container labelling obligatory under Regulation (EC) 865/2006 as amended by 100/2008.

No price ranges are shown because none were sourced for this product. Requirements vary by product and destination; each party remains responsible for the rules that apply to it. FishMatch does not certify products or guarantee compliance.

Comparison

What a complete caviar offer includes
PointComplete offerIncomplete offer
SpeciesScientific name + CITES appendixTrade name only
PermitsExport permit available'On request'
LabelsUniversal CITES code per containerMissing

Buyer questions

Can any caviar be imported commercially?
Only with valid CITES permits for listed species, correct universal labelling and the destination's food import approvals. Appendix I species are generally excluded from commercial trade.

Request through FishMatch

One free, reviewed RFQ for programmes from USD 250,000 per year or season. FishMatch coordinates all communication — buyers do not contact producers or suppliers directly. No availability, quality, certification or price guarantee.

Start RFQ
FishMatch Group and the other Global B2B Group platforms are committed to conducting their own activities in accordance with applicable laws and regulations. FishMatch facilitates sourcing and RFQs; it does not manufacture, process, export or sell the listed products and does not grant regulatory approval. Requirements differ by product and by origin, destination and transit country. As buyer or importer, you remain responsible for your own import permissions, local requirements and due diligence. This notice does not change anyone's legal duties and is not legal advice. Regulation & responsibilities

Related pages

Sources