Mediterranean cage farming and inland trout projects in Spain.

For commercial operators, integrators, developers and institutional projects — not backyard farming. Plan the marine fish (sea bass / bream / barramundi) project first, then source equipment and financing with the numbers already in hand.

  • Sea bass and sea bream cages
  • Trout raceways
  • Emerging RAS
  • Aeration and pumping
  • Feed efficiency
  • Offshore expansion

Indicative project plan

A 750 t/year marine fish (sea bass / bream / barramundi) project in cage / offshore cage (Spain) needs roughly 31,849 m³, 1,200 t of feed per year, 0 kW of aeration and an indicative CAPEX of €3.30M – €9.07M.

Figures shown in EUR, converted from EUR at indicative planning rates.

Production & infrastructure

Cycles per year
0.8
Harvest per cycle
924.7 t
Standing biomass
573.3 t
Juveniles / PL per year
1.76 million
System volume
31,849 m³
Number of cages
8 × 4,000 m³
Stocking density
68.3 animals/m³

Water, oxygen & energy

Water exchange / make-up
0 m³/d
Annual water requirement
0 m³
Pump flow
0 m³/h (0 pumps incl. standby)
Oxygen demand
822 kg O₂/d
Installed aeration
0 kW (≈ 0 units)
Peak electrical load
8 kW
Annual energy
42,705 kWh
Backup generator (critical loads)
0 kVA

Feed

Feed per year
1,200 t
Feed per day (average)
3.29 t
Feed storage (14 days)
46 t
Annual feed cost
€1.98M
Automatic feeding justified?
Yes — likely commercially justified
Source feed (1,200 t)

Economics (base)

Indicative CAPEX
€3.30M – €9.07M
Annual OPEX
€2.87M
— feed
€1.98M
— juveniles / PL
€388k
— energy
€7k
Annual revenue
€5.10M
Operating contribution
€2.23M
Indicative payback
2.8 years
Return on CAPEX
36% / year

Oxygen is worked out from daily feed: about 0.25 kg O₂ per kg feed — Timmons & Ebeling, Recirculating Aquaculture Systems, NRAC Publication 01-002 (2002). Species FCR, survival, cycle length, prices, stocking density and build costs shown before you type are examples only, not published figures — replace them with your supplier quotes and your own records.

Equipment scope this project actually needs

  • Oxygen generation or LOX
  • Cages, nets and moorings
  • Feed barge / service craft
  • Automatic feeding system
  • Feed storage (silos / warehouse)
  • Water quality monitoring & alarms
  • Solar for auxiliary loads
  • • At this density a power or oxygen failure can cause total livestock loss within hours — full redundancy is mandatory.
  • • Cage feasibility depends on depth, currents, exposure and access — a professional site assessment is required.

Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.

FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

FishMatch Group is a supplier-neutral sourcing and matching platform. We do not operate farms and do not guarantee survival, FCR, growth, yield, ROI, disease prevention or financing approval. Final system design must be validated by qualified aquaculture engineers, suppliers and aquatic-health professionals.

Budget model

CAPEX, OPEX & ROI calculator — Spain

Indicative capital and operating budget for a commercial project in Spain, sized with the same engineering assumptions as the planner above. Ranges only — engineered quotations follow the RFQ.

Indicative CAPEX

€4.40M – €12.10M

Mid €8.25M · excludes land

Annual OPEX

€3.83M

€4k per tonne

Simple payback

2.8 yrs

Contribution €2.97M/yr

Return on CAPEX

36%/yr

Revenue €6.80M/yr

Annual operating cost breakdown
OPEX linePer yearShare
Feed€2.64M69%
Juveniles / post-larvae€518k13.5%
Energy€9k0.2%
Labour, health, maintenance, other€660k17.2%
Total OPEX€3.83M100%
  • • At this density a power or oxygen failure can cause total livestock loss within hours — full redundancy is mandatory.
  • • Cage feasibility depends on depth, currents, exposure and access — a professional site assessment is required.

Planning ranges derived from published equipment, feed and energy benchmarks for Spain. They are not a guarantee of biological or financial performance, and FishMatch Group is not a lender.

Spain planning questions

Common questions

Frequently asked questions

Indicatively €4.40M – €12.10M CAPEX in cage / offshore cage, excluding land, with annual OPEX around €3.83M at Spain energy and input costs. That configuration needs about 42,466 m³ of cage volume, 1,600 t/year of feed and 0 kW of installed aeration. Ranges only — engineered quotations follow.

Spain is a marine market with typical water temperatures of 14–28 °C, so the commercially proven routes are cage / offshore cage, raceway / flow-through, ras (recirculating), intensive (lined) pond. FishMatch does not recommend RAS by default; the planner compares the systems that actually work for marine fish (sea bass / bream / barramundi) at your production target and energy cost (≈ €0.16/kWh locally).

At an FCR near 1.6, every 1,000 t/year of marine fish (sea bass / bream / barramundi) requires roughly 1,600 t/year of feed — about 4.4 t/day, needing 61 t of storage for a 14-day buffer. The planner hands that tonnage to FeedMatch for aquafeed sourcing without re-entering your project data.

FishMatch Group is not a lender. Where a project is eligible we structure the summary, CAPEX/OPEX model and documentation that specialist aquaculture financing partners require, and make a qualified introduction. Approval, terms and security are entirely the partner's decision.

Next steps for Spain projects

Marine fish (sea bass / bream / barramundi) · piscicultura España · granja de dorada y lubina · cage farm Spain · RAS España · trout farm Spain. FishMatch Group is a supplier-neutral sourcing platform and does not operate farms or guarantee yield, FCR, ROI or financing approval.

More on Spain

Each page answers a different stage of the same project — market, suppliers, feasibility and equipment.

Short answer

What is the fastest way to get quotes for Spain?

Submit one structured request for Spain. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer