Commercial fish, shrimp and hatchery projects in Bangladesh.

For commercial operators, integrators, developers and institutional projects — not backyard farming. Plan the pangasius project first, then source equipment and financing with the numbers already in hand.

  • Commercial fish and shrimp
  • Hatchery
  • Cage culture
  • Feed
  • Biosecurity

Indicative project plan

A 750 t/year pangasius project in semi-intensive pond (Bangladesh) needs roughly 36.4 ha, 1,200 t of feed per year, 37 kW of aeration and an indicative CAPEX of €1.80M – €4.20M.

Figures shown in EUR, converted from EUR at indicative planning rates.

Production & infrastructure

Cycles per year
1.5
Harvest per cycle
493.2 t
Standing biomass
305.8 t
Juveniles / PL per year
0.83 million
System volume
509,589 m³
Water area
36.4 ha
Number of ponds
32 × 16,000 m³
Stocking density
1.1 animals/m³

Water, oxygen & energy

Water exchange / make-up
40,767 m³/d
Annual water requirement
14,880,000 m³
Pump flow
2,548 m³/h (8 pumps incl. standby)
Oxygen demand
822 kg O₂/d
Installed aeration
37 kW (≈ 17 units)
Peak electrical load
133 kW
Annual energy
759,414 kWh
Backup generator (critical loads)
197 kVA

Feed

Feed per year
1,200 t
Feed per day (average)
3.29 t
Feed storage (14 days)
46 t
Annual feed cost
€900k
Automatic feeding justified?
Yes — likely commercially justified
Source feed (1,200 t)

Economics (base)

Indicative CAPEX
€1.80M – €4.20M
Annual OPEX
€1.29M
— feed
€900k
— juveniles / PL
€29k
— energy
€61k
Annual revenue
€1.20M
Operating contribution
€-90k
Indicative payback
—
Return on CAPEX
-3% / year

Oxygen is worked out from daily feed: about 0.25 kg O₂ per kg feed — Timmons & Ebeling, Recirculating Aquaculture Systems, NRAC Publication 01-002 (2002). Species FCR, survival, cycle length, prices, stocking density and build costs shown before you type are examples only, not published figures — replace them with your supplier quotes and your own records.

Equipment scope this project actually needs

  • Aerators / blowers
  • Pumps
  • Pond liners or tanks
  • Automatic feeding system
  • Feed storage (silos / warehouse)
  • Water quality monitoring & alarms
  • Backup generator
  • Solar for auxiliary loads

Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.

FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

FishMatch Group is a supplier-neutral sourcing and matching platform. We do not operate farms and do not guarantee survival, FCR, growth, yield, ROI, disease prevention or financing approval. Final system design must be validated by qualified aquaculture engineers, suppliers and aquatic-health professionals.

Budget model

CAPEX, OPEX & ROI calculator — Bangladesh

Indicative capital and operating budget for a commercial project in Bangladesh, sized with the same engineering assumptions as the planner above. Ranges only — engineered quotations follow the RFQ.

Indicative CAPEX

€2.40M – €5.60M

Mid €4.00M · excludes land

Annual OPEX

€1.72M

€2k per tonne

Simple payback

n/a

Contribution €-120k/yr

Return on CAPEX

-3%/yr

Revenue €1.60M/yr

Annual operating cost breakdown
OPEX linePer yearShare
Feed€1.20M69.8%
Juveniles / post-larvae€39k2.3%
Energy€81k4.7%
Labour, health, maintenance, other€400k23.3%
Total OPEX€1.72M100%

Planning ranges derived from published equipment, feed and energy benchmarks for Bangladesh. They are not a guarantee of biological or financial performance, and FishMatch Group is not a lender.

Bangladesh planning questions

Common questions

Frequently asked questions

Indicatively €2.40M – €5.60M CAPEX in semi-intensive pond, excluding land, with annual OPEX around €1.72M at Bangladesh energy and input costs. That configuration needs about 48.5 ha of water area, 1,600 t/year of feed and 49 kW of installed aeration. Ranges only — engineered quotations follow.

Bangladesh is a mixed market with typical water temperatures of 22–32 °C, so the commercially proven routes are semi-intensive pond, intensive (lined) pond, cage / offshore cage, hatchery / nursery. FishMatch does not recommend RAS by default; the planner compares the systems that actually work for pangasius at your production target and energy cost (≈ €0.08/kWh locally).

At an FCR near 1.6, every 1,000 t/year of pangasius requires roughly 1,600 t/year of feed — about 4.4 t/day, needing 61 t of storage for a 14-day buffer. The planner hands that tonnage to FeedMatch for aquafeed sourcing without re-entering your project data.

FishMatch Group is not a lender. Where a project is eligible we structure the summary, CAPEX/OPEX model and documentation that specialist aquaculture financing partners require, and make a qualified introduction. Approval, terms and security are entirely the partner's decision.

Next steps for Bangladesh projects

Pangasius · commercial fish farm Bangladesh · shrimp hatchery Bangladesh · cage fish farm Bangladesh. FishMatch Group is a supplier-neutral sourcing platform and does not operate farms or guarantee yield, FCR, ROI or financing approval.

More on Bangladesh

Each page answers a different stage of the same project — market, suppliers, feasibility and equipment.

Short answer

What is the fastest way to get quotes for Bangladesh?

Submit one structured request for Bangladesh. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer