Deutsch

Germany: seafood imports by origin, product and production method

Import market context

Germany reported USD 212 million of seafood imports (HS 03, 1604, 1605) from India, Ecuador, Peru, Kenya and Colombia combined in 2024, on UN Comtrade figures retrieved 25 Oct 2026. As an EU member state, Germany applies EU import conditions: the exporting country and establishment must be on the EU lists and each consignment needs an official health certificate. Customs values show historical trade, not current demand or prices.

Germany origin map: seafood from India, Ecuador, Peru, Kenya and Colombia

Answer first: on its own 2024 customs figures, Germany imported seafood worth USD 110 million from Ecuador, USD 87.0 million from India and USD 13.5 million from Peru, plus smaller flows from Colombia and Kenya. The largest single line is prepared tuna, skipjack and bonito from Ecuador (USD 89.4 million). A flow shows product cleared customs; it is not an approval for any supplier or lot.

Values: USD million, imports reported by Germany to UN Comtrade (HS 2022, six-digit lines in chapters 03, 1604 and 1605), 2024, retrieved 25 Oct 2026. "Farmed" or "wild" comes from what is known about the species and origin, not from the customs code, which does not record production method.

Germany: seafood imports from five origins, USD million
Origin20242023StatusOrigin-reported 2024
India87.097.3Established flow (USD 10 million or more)60.6
Ecuador11075.8Established flow (USD 10 million or more)101
Peru13.510.3Established flow (USD 10 million or more)9.2
Kenya0.580.56Small flow (USD 0.5–10 million)0.28
Colombia1.50.00Small flow (USD 0.5–10 million)0.61

"Origin-reported 2024" is what the origin declared as exports to Germany (HS 03, 1604, 1605). Importer and exporter figures differ because of timing, valuation (CIF vs FOB) and transhipment.

From India: USD 87.0 million in 2024

HSProductUSD mTonnesFarmed or wild
030617Frozen warm-water shrimp and prawns69.39,152Farmed and wild — India exports farmed vannamei and black tiger as well as wild-caught shrimp; the HS code does not say which — specify species and method per lot.
160529Prepared shrimp, in airtight containers5.5674Farmed and wild — India exports farmed vannamei and black tiger as well as wild-caught shrimp; the HS code does not say which — specify species and method per lot.
030743Frozen squid and cuttlefish4.3835Wild-caught — Squid, cuttlefish and octopus in this trade are wild-caught.
160521Prepared shrimp, not in airtight containers3.9557Farmed and wild — India exports farmed vannamei and black tiger as well as wild-caught shrimp; the HS code does not say which — specify species and method per lot.
030487Frozen tuna fillets and meat1.4249Wild-caught — Tuna is wild-caught (some bluefin is ranched).
030752Frozen octopus0.3684Wild-caught — Squid, cuttlefish and octopus in this trade are wild-caught.

Largest 6 of 45 product lines shown.

From Ecuador: USD 110 million in 2024

HSProductUSD mTonnesFarmed or wild
160414Prepared tuna, skipjack and bonito89.418,515Wild-caught — Tuna is wild-caught (some bluefin is ranched).
030617Frozen warm-water shrimp and prawns9.01,326Farmed (by species/origin) — Ecuador's shrimp exports are predominantly farmed whiteleg shrimp (FAO GLOBEFISH); the HS code does not record method — confirm per lot.
160521Prepared shrimp, not in airtight containers4.1342Farmed (by species/origin) — Ecuador's shrimp exports are predominantly farmed whiteleg shrimp (FAO GLOBEFISH); the HS code does not record method — confirm per lot.
030481Fish fillets; frozen, salmon, Pacific (Oncorhynchus nerka, Oncorhynchus gorbuscha, Oncorhy2.2167Not recorded — Species and production method are not identified by this HS line — confirm per offer.
160529Prepared shrimp, in airtight containers2.1120Farmed (by species/origin) — Ecuador's shrimp exports are predominantly farmed whiteleg shrimp (FAO GLOBEFISH); the HS code does not record method — confirm per lot.
160420Prepared fish, other forms1.1263Not recorded — Species and production method are not identified by this HS line — confirm per offer.

Largest 6 of 16 product lines shown.

From Peru: USD 13.5 million in 2024

HSProductUSD mTonnesFarmed or wild
160416Prepared or preserved anchovies4.6388Wild-caught — Sardines, anchovies and mackerel are wild-caught small pelagic species.
160414Prepared tuna, skipjack and bonito4.6891Wild-caught — Tuna is wild-caught (some bluefin is ranched).
160554Prepared or preserved squid and cuttlefish1.2172Wild-caught — Squid, cuttlefish and octopus in this trade are wild-caught.
030743Frozen squid and cuttlefish0.90218Wild-caught — Squid, cuttlefish and octopus in this trade are wild-caught.
030722Frozen scallops0.6972Farmed (by species/origin) — Peru's scallop (Argopecten purpuratus) output is mainly cultured (FAO National Aquaculture Sector Overview: Peru); the HS code does not record method — confirm per lot.
030366Fish; frozen, hake (Merluccius spp., Urophycis spp.), excluding fillets, fish meat of 03040.5189Not recorded — Species and production method are not identified by this HS line — confirm per offer.

Largest 6 of 22 product lines shown.

From Kenya: USD 0.58 million in 2024

HSProductUSD mTonnesFarmed or wild
030119Live ornamental fish (not food)0.374Not food — Ornamental fish — not food; outside seafood sourcing.
030433Fresh or chilled Nile perch fillets0.2630Wild-caught — Nile perch is a Lake Victoria capture fishery species.
030463Frozen Nile perch fillets0.2127Wild-caught — Nile perch is a Lake Victoria capture fishery species.
030791Live, fresh or chilled molluscs, other0.04—Not recorded — Species and production method are not identified by this HS line — confirm per offer.
030636Fresh or chilled shrimp and prawns (not frozen)0.03—Not recorded — The HS code does not record whether shrimp were farmed or wild-caught — confirm per lot.
030890Aquatic invertebrates; other than crustaceans, molluscs, sea urchins, sea cucumbers and je0.03—Not recorded — Species and production method are not identified by this HS line — confirm per offer.

Largest 6 of 14 product lines shown.

From Colombia: USD 1.5 million in 2024

HSProductUSD mTonnesFarmed or wild
160414Prepared tuna, skipjack and bonito1.1210Wild-caught — Tuna is wild-caught (some bluefin is ranched).
030111Live freshwater ornamental fish (not food)0.543Not food — Ornamental fish — not food; outside seafood sourcing.
030399Frozen fish fins, heads, tails and other edible offal0.16130Not recorded — Species and production method are not identified by this HS line — confirm per offer.
030482Frozen trout fillets0.1317Farmed (by species/origin) — Rainbow trout from Peru and Colombia is mainly farmed (FAO country profiles); the HS code does not record method — confirm per lot.
030314Frozen whole trout0.1120Farmed (by species/origin) — Rainbow trout from Peru and Colombia is mainly farmed (FAO country profiles); the HS code does not record method — confirm per lot.

Origin strength: what India and Ecuador export

  • India exported 1,698,170 t of seafood worth USD 7.45 billion in fiscal 2024-25, two-thirds of it frozen shrimp (USD 5.18 billion). By value the United States (USD 2.71 billion), China (USD 1.28 billion), the European Union (USD 1.13 billion), South-East Asia (USD 975 million), Japan (USD 412 million) and the Middle East (USD 278 million) were the main destinations. MPEDA press release, 9 July 2025 (PDF)
  • Ecuador's 2024 frozen shrimp exports (HS 030613, Ecuador-reported) went mainly to China (USD 2.92 billion), United States (USD 1.42 billion), Spain (USD 339 million), Italy (USD 292 million), France (USD 231 million). WITS / UN Comtrade — Ecuador 2024 exports of HS 030613 by partner

Exporters that name Germany as a market

Our team keeps a private, source-linked file of seafood exporters and processors in the five origins. The counts below show how many of them say on their own websites that they sell to Germany. These are the companies' own statements, checked on 25 Oct 2026. They are not shipment records and not approval for Germany. Names stay private and are shared only through a reviewed request.

OriginExporters researchedName GermanySay "EU" only
India600
Ecuador811
Peru800
Kenya401
Colombia500

A zero means no statement was found, not that the company does not sell there. Certifications listed by these companies were not checked in certifier databases.

Verified, not verified and hypotheses

  • Verified: the customs-reported values and tonnages above, for the year shown.
  • Not verified here: whether a given producer, plant or lot is currently eligible for Germany (check the EU list of authorised establishments); prices; current demand.
  • Hypothesis to test in the RFQ: that importers and processors already buying these lines would compare a further origin on the same specification. Trade data shows what was bought, not who would switch.
  • Colombia: any Colombia line above is a customs flow only; exporter-level validation for Germany is still open, so treat Colombian supply as unconfirmed until a supplier's documents are checked.

Where to check Germany's import rules

General information, not legal advice. The importer of record and the exporter confirm the current requirements for each product and origin with the authorities.

Fresh fruit, vegetables and flowers — for example Ecuadorian bananas, Peruvian produce or Kenyan horticulture — are outside FishMatch's seafood and aquaculture scope. Source commodities through Global B2B Group.

Compare these origins on one specification

Free for buyers. For annual or seasonal programmes of USD 250,000 or more. Our team reviews every request and approaches producers and exporters privately; buyers and suppliers are not put in direct contact, and we do not guarantee supply, price or approvals. FishMatch Group is a sourcing intermediary — not a producer, exporter, importer or certifier.

Send a request with Germany as destination

Questions about Germany

Which of India, Ecuador, Peru, Kenya and Colombia ship seafood to Germany?
on its own 2024 customs figures, Germany imported seafood worth USD 110 million from Ecuador, USD 87.0 million from India and USD 13.5 million from Peru, plus smaller flows from Colombia and Kenya. The largest single line is prepared tuna, skipjack and bonito from Ecuador (USD 89.4 million). A flow shows product cleared customs; it is not an approval for any supplier or lot.
Is the shrimp Germany imports from Ecuador and India farmed?
Customs codes do not record production method. Ecuador's shrimp exports are predominantly farmed whiteleg shrimp (FAO GLOBEFISH); India exports farmed vannamei and black tiger as well as some wild-caught shrimp. In 2024 Germany reported USD 110 million of seafood from Ecuador and USD 87.0 million from India. Specify species and method per lot.
Does a trade flow mean a supplier can export to Germany?
No. Each shipment must meet Germany's import conditions, including an EU-listed establishment and health certificate. The importer of record and exporter confirm current requirements with the authorities listed on this page.
Is the sourcing service free?
Yes for buyers. Managed requests are for annual or seasonal programmes of at least USD 250,000. FishMatch Group is a sourcing intermediary, not a producer, exporter, importer or certifier, and does not guarantee supply, price or approvals.

Sources: UN Comtrade — importer- and origin-reported trade, HS 2022 (retrieved 25 Oct 2026) · FAO GLOBEFISH — Shifts in the global shrimp trade and production (29 Aug 2025) · MPEDA press release, 9 July 2025 (PDF) · FAO — National Aquaculture Sector Overview: Peru · European Union seafood trade data guide · All 15 markets ranked

Why source through FishMatch Group instead of alone

Answer first: a qualified importer sends one specification and receives offers from several screened producers and exporters, compared on the same basis — without disclosing its identity to every supplier. The buyer service is free; benefits below are possible outcomes, not guarantees.

  • One written specification instead of separate conversations with each exporter, so offers can be compared line by line.
  • Several origins on the same request — for example India and Ecuador for farmed shrimp — so price, size grading and documents can be compared side by side.
  • Document checks before an offer is shared: establishment listing, health certificate and, for wild-caught product, catch documentation.
  • Your company name stays private until you decide to proceed; suppliers do not contact you directly.
  • Our team reviews every request; we are a sourcing intermediary, not a producer, exporter, importer or certifier.

Specification template for a Germany request

Answer first: fill one line per product. These are the fields producers need to quote comparably; set them against the product lines Germany imported in 2024, shown above.

FieldWhat to write
Species (common and scientific name)e.g. whiteleg shrimp, Penaeus vannamei
Farmed or wild-caughtstate it per lot — customs codes do not record it
Product forme.g. frozen raw, headless shell-on, peeled and deveined, IQF or block
Size or counte.g. 31/40 pieces per lb, or fillet weight range
Glaze and net weightglaze percentage and whether price is per net weight
Packing and labellinginner and master carton, language of labels
Volume and frequencytonnes per shipment and per year (programmes of USD 250,000 or more)
Destination and Incotermport of discharge in Germany, e.g. CFR or FOB
Delivery windowfirst shipment date and frequency
Documents requiredsee the checklist below

Quality and traceability documents to check for Germany

Answer first: ask for these before contracting. Each item links to the official source; requirements change, so the importer of record and the exporter confirm them for the exact product and origin.

  1. Verify the exporting country and relevant seafood establishments appear on applicable EU authorised lists. (Farmed and wild) European Commission — Non-EU countries authorised establishments
  2. Obtain the applicable official health certificate for third-country fishery-product consignments. (Farmed and wild) European Commission — FAQs: Certification
  3. Pre-notify the EU entry border control post through TRACES using CHED-P Part I and obtain the authority’s entry decision. (Farmed and wild) European Commission — TRACES modules and features
  4. Submit flag-state-validated catch certification through CATCH for covered marine wild-caught products; aquaculture products obtained from fry or larvae are excluded. (Wild-caught only) European Commission — Illegal fishing

Sources checked 25 Oct 2026. General information, not legal advice.

Cold chain: what the standards say

Answer first: Codex standards set the reference points below. Transit times, routes and freight rates for Germany are not sourced on this page; ask for them in the request.

Questions from Germany buyers

How do I request offers for Germany?
Send one request with your specification and Germany as destination. Our team reviews it, approaches suitable producers and exporters privately and shares comparable offers. It is free for buyers.
Is there a minimum?
Managed requests are for annual or seasonal programmes of at least USD 250,000. Smaller requests are saved and pointed to free tools.
Will suppliers contact me directly?
No. Communication is mediated by our team, and your company name stays private until you decide to proceed.

Products and forms

The largest lines from these origins were prepared tuna, skipjack and bonito from Ecuador (USD 89.4 million; wild-caught); frozen warm-water shrimp and prawns from India (USD 69.3 million; farmed and wild); frozen warm-water shrimp and prawns from Ecuador (USD 9.0 million; farmed by species and origin); prepared shrimp, in airtight containers from India (USD 5.5 million; farmed and wild). Specify species by scientific name and production method for each lot — customs codes do not record whether product was farmed.

Sourcing: what to specify

Write one specification per product — species by scientific name, farmed or wild, form, size or count, glaze and net weight, packing, volume, frequency, destination port and delivery window — so offers from different origins can be compared line by line.

Sources

Request a private sourcing review

Free for buyers. For annual or seasonal programs of USD 250,000 or more. Our team reviews every request; introductions happen only after review and supplier identities stay private until then. No supply, price or compliance guarantees.