Français · Nederlands

Belgium: seafood imports by origin, product and production method

Import market context

Belgium reported USD 121 million of seafood imports (HS 03, 1604, 1605) from India, Ecuador, Peru, Kenya and Colombia combined in 2024, on UN Comtrade figures retrieved 25 Oct 2026. As an EU member state, Belgium applies EU import conditions: the exporting country and establishment must be on the EU lists and each consignment needs an official health certificate. Customs values show historical trade, not current demand or prices.

Belgium origin map: seafood from India, Ecuador, Peru, Kenya and Colombia

Answer first: on its own 2024 customs figures, Belgium imported seafood worth USD 94.5 million from India, USD 19.9 million from Ecuador and USD 6.6 million from Peru. The largest single line is frozen warm-water shrimp and prawns from India (USD 86.3 million). No food seafood flow was reported from Kenya or Colombia. A flow shows product cleared customs; it is not an approval for any supplier or lot.

Values: USD million, imports reported by Belgium to UN Comtrade (HS 2022, six-digit lines in chapters 03, 1604 and 1605), 2024, retrieved 25 Oct 2026. "Farmed" or "wild" comes from what is known about the species and origin, not from the customs code, which does not record production method.

Belgium: seafood imports from five origins, USD million
Origin20242023StatusOrigin-reported 2024
India94.599.2Established flow (USD 10 million or more)205
Ecuador19.920.4Established flow (USD 10 million or more)67.1
Peru6.65.8Small flow (USD 0.5–10 million)9.3
Kenya0.000.10No food seafood flow reported0.37
Colombia0.000.00No food seafood flow reported0.01

"Origin-reported 2024" is what the origin declared as exports to Belgium (HS 03, 1604, 1605). Importer and exporter figures differ because of timing, valuation (CIF vs FOB) and transhipment.

From India: USD 94.5 million in 2024

HSProductUSD mTonnesFarmed or wild
030617Frozen warm-water shrimp and prawns86.313,445Farmed and wild — India exports farmed vannamei and black tiger as well as wild-caught shrimp; the HS code does not say which — specify species and method per lot.
160420Prepared fish, other forms2.7930Not recorded — Species and production method are not identified by this HS line — confirm per offer.
030743Frozen squid and cuttlefish2.4493Wild-caught — Squid, cuttlefish and octopus in this trade are wild-caught.
160529Prepared shrimp, in airtight containers1.3214Farmed and wild — India exports farmed vannamei and black tiger as well as wild-caught shrimp; the HS code does not say which — specify species and method per lot.
160521Prepared shrimp, not in airtight containers1.1159Farmed and wild — India exports farmed vannamei and black tiger as well as wild-caught shrimp; the HS code does not say which — specify species and method per lot.
160554Prepared or preserved squid and cuttlefish0.3852Wild-caught — Squid, cuttlefish and octopus in this trade are wild-caught.

Largest 6 of 14 product lines shown.

From Ecuador: USD 19.9 million in 2024

HSProductUSD mTonnesFarmed or wild
030617Frozen warm-water shrimp and prawns11.31,735Farmed (by species/origin) — Ecuador's shrimp exports are predominantly farmed whiteleg shrimp (FAO GLOBEFISH); the HS code does not record method — confirm per lot.
160414Prepared tuna, skipjack and bonito8.61,658Wild-caught — Tuna is wild-caught (some bluefin is ranched).
030743Frozen squid and cuttlefish0.017Wild-caught — Squid, cuttlefish and octopus in this trade are wild-caught.
160521Prepared shrimp, not in airtight containers0.00—Farmed (by species/origin) — Ecuador's shrimp exports are predominantly farmed whiteleg shrimp (FAO GLOBEFISH); the HS code does not record method — confirm per lot.
160569Aquatic invertebrates; other than crustaceans, molluscs, sea cucumbers, sea urchins, and j0.00—Not recorded — Species and production method are not identified by this HS line — confirm per offer.
030366Fish; frozen, hake (Merluccius spp., Urophycis spp.), excluding fillets, fish meat of 03040.00—Not recorded — Species and production method are not identified by this HS line — confirm per offer.

Largest 6 of 7 product lines shown.

From Peru: USD 6.6 million in 2024

HSProductUSD mTonnesFarmed or wild
030722Frozen scallops3.8301Farmed (by species/origin) — Peru's scallop (Argopecten purpuratus) output is mainly cultured (FAO National Aquaculture Sector Overview: Peru); the HS code does not record method — confirm per lot.
160416Prepared or preserved anchovies2.9243Wild-caught — Sardines, anchovies and mackerel are wild-caught small pelagic species.
030617Frozen warm-water shrimp and prawns0.032Not recorded — The HS code does not record whether shrimp were farmed or wild-caught — confirm per lot.
030539Dried or salted fish fillets, other species0.00—Not recorded — Species and production method are not identified by this HS line — confirm per offer.
030354Frozen mackerel0.00—Wild-caught — Sardines, anchovies and mackerel are wild-caught small pelagic species.

Origin strength: what India and Ecuador export

  • India exported 1,698,170 t of seafood worth USD 7.45 billion in fiscal 2024-25, two-thirds of it frozen shrimp (USD 5.18 billion). By value the United States (USD 2.71 billion), China (USD 1.28 billion), the European Union (USD 1.13 billion), South-East Asia (USD 975 million), Japan (USD 412 million) and the Middle East (USD 278 million) were the main destinations. MPEDA press release, 9 July 2025 (PDF)
  • Ecuador's 2024 frozen shrimp exports (HS 030613, Ecuador-reported) went mainly to China (USD 2.92 billion), United States (USD 1.42 billion), Spain (USD 339 million), Italy (USD 292 million), France (USD 231 million). WITS / UN Comtrade — Ecuador 2024 exports of HS 030613 by partner

Exporters that name Belgium as a market

Our team keeps a private, source-linked file of seafood exporters and processors in the five origins. The counts below show how many of them say on their own websites that they sell to Belgium. These are the companies' own statements, checked on 25 Oct 2026. They are not shipment records and not approval for Belgium. Names stay private and are shared only through a reviewed request.

OriginExporters researchedName BelgiumSay "EU" only
India600
Ecuador801
Peru800
Kenya401
Colombia500

A zero means no statement was found, not that the company does not sell there. Certifications listed by these companies were not checked in certifier databases.

Verified, not verified and hypotheses

  • Verified: the customs-reported values and tonnages above, for the year shown.
  • Not verified here: whether a given producer, plant or lot is currently eligible for Belgium (check the EU list of authorised establishments); prices; current demand.
  • Hypothesis to test in the RFQ: that importers and processors already buying these lines would compare a further origin on the same specification. Trade data shows what was bought, not who would switch.
  • Colombia: any Colombia line above is a customs flow only; exporter-level validation for Belgium is still open, so treat Colombian supply as unconfirmed until a supplier's documents are checked.

Where to check Belgium's import rules

General information, not legal advice. The importer of record and the exporter confirm the current requirements for each product and origin with the authorities.

Fresh fruit, vegetables and flowers — for example Ecuadorian bananas, Peruvian produce or Kenyan horticulture — are outside FishMatch's seafood and aquaculture scope. Source commodities through Global B2B Group.

Compare these origins on one specification

Free for buyers. For annual or seasonal programmes of USD 250,000 or more. Our team reviews every request and approaches producers and exporters privately; buyers and suppliers are not put in direct contact, and we do not guarantee supply, price or approvals. FishMatch Group is a sourcing intermediary — not a producer, exporter, importer or certifier.

Send a request with Belgium as destination

Questions about Belgium

Which of India, Ecuador, Peru, Kenya and Colombia ship seafood to Belgium?
on its own 2024 customs figures, Belgium imported seafood worth USD 94.5 million from India, USD 19.9 million from Ecuador and USD 6.6 million from Peru. The largest single line is frozen warm-water shrimp and prawns from India (USD 86.3 million). No food seafood flow was reported from Kenya or Colombia. A flow shows product cleared customs; it is not an approval for any supplier or lot.
Is the shrimp Belgium imports from Ecuador and India farmed?
Customs codes do not record production method. Ecuador's shrimp exports are predominantly farmed whiteleg shrimp (FAO GLOBEFISH); India exports farmed vannamei and black tiger as well as some wild-caught shrimp. In 2024 Belgium reported USD 19.9 million of seafood from Ecuador and USD 94.5 million from India. Specify species and method per lot.
Does a trade flow mean a supplier can export to Belgium?
No. Each shipment must meet Belgium's import conditions, including an EU-listed establishment and health certificate. The importer of record and exporter confirm current requirements with the authorities listed on this page.
Is the sourcing service free?
Yes for buyers. Managed requests are for annual or seasonal programmes of at least USD 250,000. FishMatch Group is a sourcing intermediary, not a producer, exporter, importer or certifier, and does not guarantee supply, price or approvals.

Sources: UN Comtrade — importer- and origin-reported trade, HS 2022 (retrieved 25 Oct 2026) · FAO GLOBEFISH — Shifts in the global shrimp trade and production (29 Aug 2025) · MPEDA press release, 9 July 2025 (PDF) · FAO — National Aquaculture Sector Overview: Peru · European Union seafood trade data guide · All 15 markets ranked

Why source through FishMatch Group instead of alone

Answer first: a qualified importer sends one specification and receives offers from several screened producers and exporters, compared on the same basis — without disclosing its identity to every supplier. The buyer service is free; benefits below are possible outcomes, not guarantees.

  • One written specification instead of separate conversations with each exporter, so offers can be compared line by line.
  • Several origins on the same request — for example India and Ecuador for farmed shrimp — so price, size grading and documents can be compared side by side.
  • Document checks before an offer is shared: establishment listing, health certificate and, for wild-caught product, catch documentation.
  • Your company name stays private until you decide to proceed; suppliers do not contact you directly.
  • Our team reviews every request; we are a sourcing intermediary, not a producer, exporter, importer or certifier.

Specification template for a Belgium request

Answer first: fill one line per product. These are the fields producers need to quote comparably; set them against the product lines Belgium imported in 2024, shown above.

FieldWhat to write
Species (common and scientific name)e.g. whiteleg shrimp, Penaeus vannamei
Farmed or wild-caughtstate it per lot — customs codes do not record it
Product forme.g. frozen raw, headless shell-on, peeled and deveined, IQF or block
Size or counte.g. 31/40 pieces per lb, or fillet weight range
Glaze and net weightglaze percentage and whether price is per net weight
Packing and labellinginner and master carton, language of labels
Volume and frequencytonnes per shipment and per year (programmes of USD 250,000 or more)
Destination and Incotermport of discharge in Belgium, e.g. CFR or FOB
Delivery windowfirst shipment date and frequency
Documents requiredsee the checklist below

Quality and traceability documents to check for Belgium

Answer first: ask for these before contracting. Each item links to the official source; requirements change, so the importer of record and the exporter confirm them for the exact product and origin.

  1. Verify the exporting country and relevant seafood establishments appear on applicable EU authorised lists. (Farmed and wild) European Commission — Non-EU countries authorised establishments
  2. Obtain the applicable official health certificate for third-country fishery-product consignments. (Farmed and wild) European Commission — FAQs: Certification
  3. Pre-notify the EU entry border control post through TRACES using CHED-P Part I and obtain the authority’s entry decision. (Farmed and wild) European Commission — TRACES modules and features
  4. Submit flag-state-validated catch certification through CATCH for covered marine wild-caught products; aquaculture products obtained from fry or larvae are excluded. (Wild-caught only) European Commission — Illegal fishing

Sources checked 25 Oct 2026. General information, not legal advice.

Cold chain: what the standards say

Answer first: Codex standards set the reference points below. Transit times, routes and freight rates for Belgium are not sourced on this page; ask for them in the request.

Questions from Belgium buyers

How do I request offers for Belgium?
Send one request with your specification and Belgium as destination. Our team reviews it, approaches suitable producers and exporters privately and shares comparable offers. It is free for buyers.
Is there a minimum?
Managed requests are for annual or seasonal programmes of at least USD 250,000. Smaller requests are saved and pointed to free tools.
Will suppliers contact me directly?
No. Communication is mediated by our team, and your company name stays private until you decide to proceed.

Products and forms

The largest lines from these origins were frozen warm-water shrimp and prawns from India (USD 86.3 million; farmed and wild); frozen warm-water shrimp and prawns from Ecuador (USD 11.3 million; farmed by species and origin); prepared tuna, skipjack and bonito from Ecuador (USD 8.6 million; wild-caught); frozen scallops from Peru (USD 3.8 million; farmed by species and origin). Specify species by scientific name and production method for each lot — customs codes do not record whether product was farmed.

Sourcing: what to specify

Write one specification per product — species by scientific name, farmed or wild, form, size or count, glaze and net weight, packing, volume, frequency, destination port and delivery window — so offers from different origins can be compared line by line.

Sources

Request a private sourcing review

Free for buyers. For annual or seasonal programs of USD 250,000 or more. Our team reviews every request; introductions happen only after review and supplier identities stay private until then. No supply, price or compliance guarantees.