United Kingdom: seafood imports by origin, product and production method

Import market context

United Kingdom reported USD 401 million of seafood imports (HS 03, 1604, 1605) from India, Ecuador, Peru, Kenya and Colombia combined in 2024, on UN Comtrade figures retrieved 25 Oct 2026. Customs values show historical trade, not current demand or prices.

United Kingdom origin map: seafood from India, Ecuador, Peru, Kenya and Colombia

Answer first: on its own 2024 customs figures, United Kingdom imported seafood worth USD 243 million from Ecuador, USD 118 million from India and USD 39.6 million from Peru, plus smaller flows from Colombia and Kenya. The largest single line is prepared tuna, skipjack and bonito from Ecuador (USD 167 million). A flow shows product cleared customs; it is not an approval for any supplier or lot.

Values: USD million, imports reported by United Kingdom to UN Comtrade (HS 2022, six-digit lines in chapters 03, 1604 and 1605), 2024, retrieved 25 Oct 2026. "Farmed" or "wild" comes from what is known about the species and origin, not from the customs code, which does not record production method.

United Kingdom: seafood imports from five origins, USD million
Origin20242023StatusOrigin-reported 2024
India118140Established flow (USD 10 million or more)111
Ecuador243215Established flow (USD 10 million or more)212
Peru39.627.4Established flow (USD 10 million or more)42.0
Kenya0.020.01Minor flow (under USD 0.5 million)0.06
Colombia1.61.8Small flow (USD 0.5–10 million)3.0

"Origin-reported 2024" is what the origin declared as exports to United Kingdom (HS 03, 1604, 1605). Importer and exporter figures differ because of timing, valuation (CIF vs FOB) and transhipment.

From India: USD 118 million in 2024

HSProductUSD mTonnesFarmed or wild
030617Frozen warm-water shrimp and prawns92.712,048Farmed and wild — India exports farmed vannamei and black tiger as well as wild-caught shrimp; the HS code does not say which — specify species and method per lot.
030389Frozen fish, other species5.21,187Not recorded — Species and production method are not identified by this HS line — confirm per offer.
030743Frozen squid and cuttlefish3.8744Wild-caught — Squid, cuttlefish and octopus in this trade are wild-caught.
030289Fresh or chilled fish, other species2.6439Not recorded — Species and production method are not identified by this HS line — confirm per offer.
160420Prepared fish, other forms1.9621Not recorded — Species and production method are not identified by this HS line — confirm per offer.
160529Prepared shrimp, in airtight containers1.9237Farmed and wild — India exports farmed vannamei and black tiger as well as wild-caught shrimp; the HS code does not say which — specify species and method per lot.

Largest 6 of 57 product lines shown.

From Ecuador: USD 243 million in 2024

HSProductUSD mTonnesFarmed or wild
160414Prepared tuna, skipjack and bonito16733,241Wild-caught — Tuna is wild-caught (some bluefin is ranched).
030617Frozen warm-water shrimp and prawns72.010,638Farmed (by species/origin) — Ecuador's shrimp exports are predominantly farmed whiteleg shrimp (FAO GLOBEFISH); the HS code does not record method — confirm per lot.
030636Fresh or chilled shrimp and prawns (not frozen)2.4250Farmed (by species/origin) — Ecuador's shrimp exports are predominantly farmed whiteleg shrimp (FAO GLOBEFISH); the HS code does not record method — confirm per lot.
160420Prepared fish, other forms0.78196Not recorded — Species and production method are not identified by this HS line — confirm per offer.
160529Prepared shrimp, in airtight containers0.1515Farmed (by species/origin) — Ecuador's shrimp exports are predominantly farmed whiteleg shrimp (FAO GLOBEFISH); the HS code does not record method — confirm per lot.
160411Fish preparations; salmon, prepared or preserved, whole or in pieces (but not minced)0.1214Not recorded — Species and production method are not identified by this HS line — confirm per offer.

Largest 6 of 13 product lines shown.

From Peru: USD 39.6 million in 2024

HSProductUSD mTonnesFarmed or wild
160414Prepared tuna, skipjack and bonito30.66,892Wild-caught — Tuna is wild-caught (some bluefin is ranched).
160416Prepared or preserved anchovies5.8390Wild-caught — Sardines, anchovies and mackerel are wild-caught small pelagic species.
160554Prepared or preserved squid and cuttlefish0.97187Wild-caught — Squid, cuttlefish and octopus in this trade are wild-caught.
160420Prepared fish, other forms0.7760Not recorded — Species and production method are not identified by this HS line — confirm per offer.
030563Fish; salted or in brine, not dried or smoked, other than edible fish offal, anchovies (En0.59171Not recorded — Species and production method are not identified by this HS line — confirm per offer.
160432Caviar substitutes0.3213Not recorded — Species and production method are not identified by this HS line — confirm per offer.

Largest 6 of 15 product lines shown.

From Kenya: USD 0.02 million in 2024

HSProductUSD mTonnesFarmed or wild
030119Live ornamental fish (not food)0.1716Not food — Ornamental fish — not food; outside seafood sourcing.
030699Crustaceans; smoked, whole, cooked or not, n.e.c. in item no. 0306.9, in shell or not0.021Not recorded — Species and production method are not identified by this HS line — confirm per offer.
030639Crustaceans; live, fresh or chilled, n.e.c. in item no. 0306.3, in shell or not0.00—Not recorded — Species and production method are not identified by this HS line — confirm per offer.
030791Live, fresh or chilled molluscs, other0.00—Not recorded — Species and production method are not identified by this HS line — confirm per offer.

From Colombia: USD 1.6 million in 2024

HSProductUSD mTonnesFarmed or wild
030431Fresh or chilled tilapia fillets1.2102Farmed (by species/origin) — Tilapia in international trade is overwhelmingly farmed (FAO); the HS code does not record method — confirm per lot.
030111Live freshwater ornamental fish (not food)0.4622Not food — Ornamental fish — not food; outside seafood sourcing.
030271Fresh or chilled whole tilapia0.4054Farmed (by species/origin) — Tilapia in international trade is overwhelmingly farmed (FAO); the HS code does not record method — confirm per lot.
160414Prepared tuna, skipjack and bonito0.001Wild-caught — Tuna is wild-caught (some bluefin is ranched).

Origin strength: what India and Ecuador export

  • India exported 1,698,170 t of seafood worth USD 7.45 billion in fiscal 2024-25, two-thirds of it frozen shrimp (USD 5.18 billion). By value the United States (USD 2.71 billion), China (USD 1.28 billion), the European Union (USD 1.13 billion), South-East Asia (USD 975 million), Japan (USD 412 million) and the Middle East (USD 278 million) were the main destinations. MPEDA press release, 9 July 2025 (PDF)
  • Ecuador's 2024 frozen shrimp exports (HS 030613, Ecuador-reported) went mainly to China (USD 2.92 billion), United States (USD 1.42 billion), Spain (USD 339 million), Italy (USD 292 million), France (USD 231 million). WITS / UN Comtrade — Ecuador 2024 exports of HS 030613 by partner

Exporters that name United Kingdom as a market

Our team keeps a private, source-linked file of seafood exporters and processors in the five origins. The counts below show how many of them say on their own websites that they sell to United Kingdom. These are the companies' own statements, checked on 25 Oct 2026. They are not shipment records and not approval for United Kingdom. Names stay private and are shared only through a reviewed request.

OriginExporters researchedName United Kingdom
India60
Ecuador82
Peru80
Kenya40
Colombia50

A zero means no statement was found, not that the company does not sell there. Certifications listed by these companies were not checked in certifier databases.

Verified, not verified and hypotheses

  • Verified: the customs-reported values and tonnages above, for the year shown.
  • Not verified here: whether a given producer, plant or lot is currently eligible for United Kingdom; prices; current demand.
  • Hypothesis to test in the RFQ: that importers and processors already buying these lines would compare a further origin on the same specification. Trade data shows what was bought, not who would switch.
  • Colombia: any Colombia line above is a customs flow only; exporter-level validation for United Kingdom is still open, so treat Colombian supply as unconfirmed until a supplier's documents are checked.

Where to check United Kingdom's import rules

General information, not legal advice. The importer of record and the exporter confirm the current requirements for each product and origin with the authorities.

Fresh fruit, vegetables and flowers — for example Ecuadorian bananas, Peruvian produce or Kenyan horticulture — are outside FishMatch's seafood and aquaculture scope. Source commodities through Global B2B Group.

Compare these origins on one specification

Free for buyers. For annual or seasonal programmes of USD 250,000 or more. Our team reviews every request and approaches producers and exporters privately; buyers and suppliers are not put in direct contact, and we do not guarantee supply, price or approvals. FishMatch Group is a sourcing intermediary — not a producer, exporter, importer or certifier.

Send a request with United Kingdom as destination

Questions about United Kingdom

Which of India, Ecuador, Peru, Kenya and Colombia ship seafood to United Kingdom?
on its own 2024 customs figures, United Kingdom imported seafood worth USD 243 million from Ecuador, USD 118 million from India and USD 39.6 million from Peru, plus smaller flows from Colombia and Kenya. The largest single line is prepared tuna, skipjack and bonito from Ecuador (USD 167 million). A flow shows product cleared customs; it is not an approval for any supplier or lot.
Is the shrimp United Kingdom imports from Ecuador and India farmed?
Customs codes do not record production method. Ecuador's shrimp exports are predominantly farmed whiteleg shrimp (FAO GLOBEFISH); India exports farmed vannamei and black tiger as well as some wild-caught shrimp. In 2024 United Kingdom reported USD 243 million of seafood from Ecuador and USD 118 million from India. Specify species and method per lot.
Does a trade flow mean a supplier can export to United Kingdom?
No. Each shipment must meet United Kingdom's import conditions. The importer of record and exporter confirm current requirements with the authorities listed on this page.
Is the sourcing service free?
Yes for buyers. Managed requests are for annual or seasonal programmes of at least USD 250,000. FishMatch Group is a sourcing intermediary, not a producer, exporter, importer or certifier, and does not guarantee supply, price or approvals.

Sources: UN Comtrade — importer- and origin-reported trade, HS 2022 (retrieved 25 Oct 2026) · FAO GLOBEFISH — Shifts in the global shrimp trade and production (29 Aug 2025) · MPEDA press release, 9 July 2025 (PDF) · FAO — National Aquaculture Sector Overview: Peru · All 15 markets ranked

Why source through FishMatch Group instead of alone

Answer first: a qualified importer sends one specification and receives offers from several screened producers and exporters, compared on the same basis — without disclosing its identity to every supplier. The buyer service is free; benefits below are possible outcomes, not guarantees.

  • One written specification instead of separate conversations with each exporter, so offers can be compared line by line.
  • Several origins on the same request — for example India and Ecuador for farmed shrimp — so price, size grading and documents can be compared side by side.
  • Document checks before an offer is shared: establishment listing, health certificate and, for wild-caught product, catch documentation.
  • Your company name stays private until you decide to proceed; suppliers do not contact you directly.
  • Our team reviews every request; we are a sourcing intermediary, not a producer, exporter, importer or certifier.

Specification template for a United Kingdom request

Answer first: fill one line per product. These are the fields producers need to quote comparably; set them against the product lines United Kingdom imported in 2024, shown above.

FieldWhat to write
Species (common and scientific name)e.g. whiteleg shrimp, Penaeus vannamei
Farmed or wild-caughtstate it per lot — customs codes do not record it
Product forme.g. frozen raw, headless shell-on, peeled and deveined, IQF or block
Size or counte.g. 31/40 pieces per lb, or fillet weight range
Glaze and net weightglaze percentage and whether price is per net weight
Packing and labellinginner and master carton, language of labels
Volume and frequencytonnes per shipment and per year (programmes of USD 250,000 or more)
Destination and Incotermport of discharge in United Kingdom, e.g. CFR or FOB
Delivery windowfirst shipment date and frequency
Documents requiredsee the checklist below

Quality and traceability documents to check for United Kingdom

Answer first: ask for these before contracting. Each item links to the official source; requirements change, so the importer of record and the exporter confirm them for the exact product and origin.

  1. For Great Britain, check exporting-country and establishment approval before importing fishery products. (Farmed and wild) Defra — Importing fishery products or bivalve molluscs
  2. For Great Britain, obtain the required health certificate according to origin and product risk category. (Farmed and wild) Defra — Importing or moving fish to the UK
  3. Pre-notify Great Britain seafood imports using IPAFFS within the applicable notification period. (Farmed and wild) APHA/Defra — Import of products, animals, food and feed system
  4. Obtain validated catch certificates for covered wild-caught marine imports; farmed fish and shellfish do not require catch certificates. (Wild-caught only) Defra — Importing or moving fish to the UK

Sources checked 25 Oct 2026. General information, not legal advice.

Cold chain: what the standards say

Answer first: Codex standards set the reference points below. Transit times, routes and freight rates for United Kingdom are not sourced on this page; ask for them in the request.

Questions from United Kingdom buyers

How do I request offers for United Kingdom?
Send one request with your specification and United Kingdom as destination. Our team reviews it, approaches suitable producers and exporters privately and shares comparable offers. It is free for buyers.
Is there a minimum?
Managed requests are for annual or seasonal programmes of at least USD 250,000. Smaller requests are saved and pointed to free tools.
Will suppliers contact me directly?
No. Communication is mediated by our team, and your company name stays private until you decide to proceed.

Products and forms

The largest lines from these origins were prepared tuna, skipjack and bonito from Ecuador (USD 167 million; wild-caught); frozen warm-water shrimp and prawns from India (USD 92.7 million; farmed and wild); frozen warm-water shrimp and prawns from Ecuador (USD 72.0 million; farmed by species and origin); prepared tuna, skipjack and bonito from Peru (USD 30.6 million; wild-caught). Specify species by scientific name and production method for each lot — customs codes do not record whether product was farmed.

Sourcing: what to specify

Write one specification per product — species by scientific name, farmed or wild, form, size or count, glaze and net weight, packing, volume, frequency, destination port and delivery window — so offers from different origins can be compared line by line.

Sources

Request a private sourcing review

Free for buyers. For annual or seasonal programs of USD 250,000 or more. Our team reviews every request; introductions happen only after review and supplier identities stay private until then. No supply, price or compliance guarantees.