Idioma:ENESFRPT

Pilar · HACCP

HACCP para acuicultura y pescado

HACCP es la línea base global de inocuidad de mariscos. Es legalmente obligatorio para exportar a EE.UU. (21 CFR 123) y UE (852/2004 y 853/2004), y funcionalmente obligatorio en todos los demás mercados.

FishMatch Group es neutral respecto a proveedores. Contenido educativo — no es asesoría legal, fiscal ni de inversión. Verifica siempre las regulaciones vigentes con autoridades locales y asesores licenciados antes de comprometer capital.

Normas aplicables
  • Codex Alimentarius CAC/RCP 1-1969 (HACCP)
  • US FDA 21 CFR 123 (Seafood HACCP)
  • EU Regulation 852/2004 & 853/2004
  • ISO 22000 (management-system)
Quién debe cumplir
  • Every seafood processor
  • Every aquaculture operation with export ambition
  • Cold-storage operators
  • Retail-facing distributors
Por qué importa

HACCP is the global baseline for seafood safety and the mandatory framework for US and EU export. Without a working HACCP plan, no export shipment moves.

The seven HACCP principles

1) Hazard analysis. 2) Identify critical control points. 3) Establish critical limits. 4) Monitor CCPs. 5) Establish corrective actions. 6) Verification. 7) Record-keeping. Every commercial seafood operation must implement all seven — no shortcuts.

US FDA Seafood HACCP (21 CFR 123)

Mandatory for every fish and fishery product processed for US commerce. Requires a written HACCP plan, monitoring records, corrective action records, verification and sanitation control records.

EU hygiene framework

EU 852/2004 (general hygiene) and 853/2004 (products of animal origin) require HACCP-based procedures, establishment approval and continuous compliance. Third-country producers must be listed on the EU establishment list to export.

ISO 22000 as the management-system wrapper

ISO 22000 wraps HACCP inside a full food-safety management system — recommended for large producers, retail-facing operations and export-heavy businesses.

Errores comunes

  • Copying a template HACCP without hazard analysis for your specific process.
  • Missing verification records — the plan exists but nobody signs off.
  • Under-training operators on critical control points.
  • Treating HACCP as a document rather than a live management system.

Checklist del comprador

  • Hazard analysis specific to your species, process and destination market.
  • Critical control points identified with measurable critical limits.
  • Monitoring procedures with recording responsibility assigned.
  • Corrective actions documented for every CCP deviation scenario.
  • Verification and validation activities scheduled.
  • Record-keeping structure that survives inspection.
  • Staff training records maintained for every operator at a CCP.
Checklist de cumplimiento para proyecto acuícola (PDF)

Preguntas frecuentes

Guías relacionadas

¿Necesitas proveedores que cumplan con estas normas?

Envía un solo RFQ y te ayudaremos a identificar proveedores internacionales calificados cuyo historial coincida con el envelope de cumplimiento de tu proyecto.

Short answer

What do buyers need to know about Haccp?

Haccp affects both project cost and project risk, so it belongs in the specification stage rather than the purchasing stage. This page sets out what commercial buyers assess, what typically drives cost and lead time, and which questions to put to suppliers before signing. You can turn any of it into a confidential RFQ in a few minutes.

Who it is for:
Investors, operators and project developers specifying commercial systems
Cost drivers:
Capacity, water source, energy price, permitting and logistics
Next step:
Turn the requirement into a confidential RFQ
Cost to buyers:
No fee charged to the buyer
Get Free QuotesFinancing