FishMatch Group · Industries

Who FishMatch Group works with — and how we increase project bankability.

We serve investors, operators, EPC firms, governments and lenders on large aquaculture projects only. We do not sell equipment. Every mandate runs through a neutral, confidential RFQ path so buyers, suppliers and financiers see the same, comparable spec.

Shrimp farm investors & developers

Who: Family offices, agri-funds, integrators and coastal developers deploying $2M–$50M into vannamei or monodon farms.

What they need: Class-3 CAPEX, pond & aeration engineering, biosecurity, energy strategy, offtake and bankability.

  • • Neutral pond & aeration engineering, no equipment resale
  • • Solar-hybrid vs diesel modeling with 15-year cash flow
  • • Confidential RFQs to 2–4 selected suppliers per package
  • • Financing introductions to DFIs and specialist lenders

RAS producers & indoor fish farms

Who: Existing and greenfield RAS operators: salmon smolt, tilapia, sea bass, trout, sturgeon, yellowtail.

What they need: System sizing, biofilter & oxygen budgets, energy resilience, HACCP-ready processing, financing.

  • • Full RAS engineering: MBBR, drum filters, degassers, O₂ cones
  • • Energy audit + solar-hybrid + backup power sizing
  • • Class-3 CAPEX and OPEX modelling with 3 scenarios
  • • RFQ packages for tanks, life-support, controls, monitoring

Pond & cage fish producers

Who: Tilapia, catfish, sea bass, sea bream and trout producers scaling from 500 t to 10,000 t/yr.

What they need: Cage or pond upgrades, aeration, feeding, water treatment, processing and export.

  • • Cage & pond system engineering with independent sizing
  • • Feed strategy and FCR-driven OPEX modelling
  • • Cold-chain and processing plant integration
  • • Export-market gap analysis (EU, US, GCC, Japan)

Fish & shrimp hatcheries

Who: PL, fingerling and smolt producers supplying regional grow-out farms.

What they need: Biosecure larval systems, live feed, water treatment, energy resilience, genetics sourcing.

  • • Marine & freshwater hatchery engineering (broodstock → PL)
  • • Live-feed room, water treatment, UV/ozone sizing
  • • Off-grid solar & battery backup for remote sites
  • • Neutral sourcing of tanks, filtration, algae systems

Seafood processors & exporters

Who: Processing plants integrating farm supply, filleting, IQF, cold storage and export.

What they need: HACCP / BRC / EU / FDA / GCC-ready plants, blast freezing, cold chain and reefer logistics.

  • • Processing line engineering: reception, filleting, IQF, packing
  • • Cold storage & blast freezer sizing
  • • Export-lane logistics (reefer, port, documentation)
  • • Traceability & certification path

EPC & engineering firms

Who: EPC contractors and integrators bidding on aquaculture packages who need a neutral supplier network.

What they need: Access to project-matched equipment vendors across categories, class-3 packages, benchmark budgets.

  • • Neutral supplier shortlists across 24+ categories
  • • Reference CAPEX splits and bankable spec templates
  • • Confidential RFQ handling
  • • No conflict of interest — we don't sell equipment

Governments & development banks

Who: Ministries of fisheries/agriculture, sovereign wealth vehicles, DFIs and multilateral programmes funding aquaculture.

What they need: Independent feasibility, class-3 budgets, sustainability & food-security framing, bankable RFQs.

  • • Independent techno-economic studies (no vendor bias)
  • • Job-creation, food-security and FX-substitution modelling
  • • Solar & water-treatment integration for ESG mandates
  • • Bankable RFQ packages aligned with DFI procurement rules

Lenders, DFIs & impact funds

Who: Banks, leasing houses, DFIs and impact investors evaluating aquaculture deals.

What they need: Independent technical review, realistic CAPEX/OPEX, sensitivity analysis, sponsor readiness.

  • • Independent technical review of sponsor submissions
  • • Class-3 CAPEX benchmarking against comparable projects
  • • Scenario modelling (pessimistic / base / optimistic)
  • • Warm intros to bankable, project-matched sponsors

Cold chain & export operators

Who: Cold storage, reefer logistics and export platforms serving farmed seafood.

What they need: Blast freezing, cold rooms, traceability, port-to-port routing and buyer alignment.

  • • Cold storage & blast-freezer sizing
  • • Reefer container and multi-modal export routing
  • • Integration with upstream processing plants
  • • Neutral vendor shortlists (refrigeration, racking, WMS)

Why serious sponsors work with us

Neutral by design

We do not sell equipment. No conflict between what's specified and what's supplied.

Confidential by default

Sponsor identity, location and financials are not shared without approval. Suppliers receive the technical scope.

Bankable outputs

Every engagement ends with a class-3 CAPEX, sensitivity analysis and RFQ-ready package.

Global supplier reach

Project-matched vendors across 24+ categories in Europe, Asia and the Americas.

Financing-ready

Warm intros to DFIs, banks and impact funds when the project meets the criteria.

Export lens

Every mandate reviewed against EU, US, GCC, Japan and China market requirements.

Bring us your project.

Confidential intake. No equipment sales pitch. If your project isn't a fit, we say so.

Short answer

What is the fastest way to get quotes for Industries?

Submit one structured request for Industries. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer
What is the fastest way to get quotes for Industries?

Submit one structured request for Industries. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How does FishMatch Group source suppliers for this requirement?

You submit one structured request. We translate it into a technical RFQ, run it against qualified manufacturers and integrators in the relevant categories, and return normalised quotations you can compare side by side on scope, lead time and total cost of ownership.

Do buyers see supplier names during the sourcing process?

No. Supplier identities stay confidential during discovery and evaluation. You receive anonymised, comparable technical and commercial packages, and introductions happen only after both sides are qualified and agree to proceed.