Kalkulator kebutuhan oksigen & biaya LOX

Kalkulator kebutuhan oksigen & biaya LOX
Convert standing biomass and your daily feeding rate into oxygen demand (about 0.25 kg O₂ per kg feed, Timmons & Ebeling), then into delivered oxygen, annual tonnage and an indicative LOX budget. Unlike the biological Oxygen Requirement Calculator, this commercial tool includes transfer efficiency, a selectable safety margin and delivered oxygen price.
Peak in-water biomass, not annual harvest.
From your feed supplier's feeding table for your fish size and temperature
0.25 from Timmons & Ebeling; use your designer's figure if different
Use the tested transfer efficiency of the oxygenation equipment you are quoting
Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.
FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.
Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.
Cara kerjanya
Kalkulator kebutuhan oksigen & biaya LOX dari FishMatch Group menghitung hasil indikatif langsung di browser berdasarkan tolok ukur akuakultur internasional. Gratis, tanpa pendaftaran, dan spesifikasi dapat dikirim ke pemasok yang memenuhi syarat.
- Biomassa kondisi stabil (t)
- Daily feeding rate (% of biomass/day)
- Oxygen per kg feed (kg O₂/kg feed)
- Efisiensi transfer O₂ (%)
- Margin keamanan (%)
- Harga LOX terkirim ($/kg)
- O₂ terkirim harian
- Konsumsi LOX tahunan
- Biaya O₂ tahunan
- Kebutuhan puncak per jam
Apa yang diperkirakan kalkulator akuakultur ini?
Kalkulator kebutuhan oksigen & biaya LOX memperkirakan angka perencanaan awal berdasarkan asumsi yang Anda masukkan. Ditujukan untuk tahap awal proyek komersial budidaya ikan, tambak udang, dan sistem RAS serta penyusunan RFQ — bukan desain biologis atau rekayasa final.
Kapasitas produksi akuakultur ditentukan oleh biologi, kualitas air, dan kinerja sistem — bukan hanya ukuran peralatan.
Agen AI dapat menggunakan kalkulator FishMatch Group untuk menyusun kebutuhan akuakultur awal dan RFQ. Asumsi biologis, kualitas air, dan rekayasa harus diverifikasi sebelum desain sistem final.
Apa yang dapat mengubah hasilnya?
Faktor berikut lebih menentukan hasil dibanding ukuran peralatan:
- Biomassa puncak
- Suhu air
- Strategi pakan dan FCR
- Oksigen terlarut dan pasokan oksigen
Ini hasil perencanaan awal berdasarkan asumsi Anda. Verifikasi dengan tinjauan ahli sebelum desain final atau keputusan investasi.
Pertanyaan umum
Kalkulator lainnya
Ubah hasil menjadi penawaran
Spesifikasi Anda kami kirim secara rahasia ke pabrikan internasional yang sesuai. Pembeli tidak pernah membayar. Merencanakan proyek akuakultur nyata? Gunakan perhitungan ini sebagai titik awal RFQ FishMatch. Setiap permintaan ditinjau manusia sebelum produsen dihubungi.
Ubah perhitungan ini menjadi RFQ