Solutions de financement pour des équipements aquacoles
Leasing et financement pour des équipements aquacoles.
Demande de projet · 3 étapes
Dites-nous ce que vous voulez construire
Trois étapes courtes. Notre équipe examine votre demande, contacte pour vous des fournisseurs adaptés et présente des réponses comparables via FishMatch ; vous ne traitez pas directement avec les fournisseurs.
Specify these four figures before requesting quotes
Quotes are only comparable when every supplier prices the same specification. These are the inputs that change everything downstream — fix them first, and the rest of the bill of quantities follows.
Project stage & tonnage
Greenfield or expansion, plus the annual output the equipment must support.
System type
Pond, cage, flow-through or RAS — the same category prices very differently per system.
Site constraints
Available power, water quality and access for containers and cranes.
Timeline & phasing
Required delivery window and whether procurement is phased.
- Itemised bill of quantities with capacities, not brand names
- Materials and corrosion class for the local environment
- Control, monitoring and alarm scope
- Spare parts package and consumables for the first cycle
- Delivery terms, packing and inland transport
- Installation, commissioning and training days
- Warranty duration and response commitment
- →Scope differences between quotes — spares, installation and commissioning
- →Material and certification level
- →Automation and control depth
- →Incoterms and freight route
- →Warranty length and local service availability
How the sourcing process runs
- Step 1
Structured brief
You submit the project figures once. FishMatch normalises them into a single specification so every supplier answers the same question.
- Step 2
Matched shortlist
Suppliers are selected against the specification, export experience and service reach for your market — never a directory dump.
- Step 3
Comparable quotes
Bids are returned on the same scope, so differences reflect engineering and delivery terms rather than what each vendor chose to include.
- Step 4
Financing review (optional)
Projects that need funding are reviewed for readiness and, where appropriate, introduced to financing partners. FishMatch is not a lender.