Encuentra proveedores de equipos para cultivo en jaulas en Turquía
Una sola solicitud, varias ofertas anónimas para equipos para cultivo en jaulas en Turquía.
Türkiye — Mediterranean. Top Mediterranean producer of bass & bream. Main farmed species: sea-bass, sea-bream, trout.
Specify these four figures before requesting quotes
Quotes are only comparable when every supplier prices the same specification. These are the inputs that change everything downstream — fix them first, and the rest of the bill of quantities follows.
Site exposure class
Significant wave height, current speed and depth — cage and mooring class follows the exposure survey, not the budget.
Cage circumference & net depth
Number of cages, circumference and net depth defining biomass per unit.
Mooring grid design
Grid layout, anchor type and holding capacity for the seabed conditions.
Certification requirement
Whether the site requires NS 9415-class documentation or an equivalent national standard.
- HDPE cage collars with bracket and handrail specification
- Nets, weights, predator protection and antifouling regime
- Mooring grid, ropes, chains and anchors with certification
- Feed barge or shore feeding system and blowers
- Net cleaning, mortality removal and handling equipment
- Monitoring, cameras and biomass estimation
- Installation vessel scope and site commissioning
- →Exposure class — a high-energy site can double mooring and collar cost
- →Certification and third-party documentation requirements
- →Net material and predator protection level
- →Feed barge capacity and automation
- →Marine installation and vessel day rates
How the sourcing process runs
- Step 1
Structured brief
You submit the project figures once. FishMatch normalises them into a single specification so every supplier answers the same question.
- Step 2
Matched shortlist
Suppliers are selected against the specification, export experience and service reach for your market — never a directory dump.
- Step 3
Comparable quotes
Bids are returned on the same scope, so differences reflect engineering and delivery terms rather than what each vendor chose to include.
- Step 4
Financing review (optional)
Projects that need funding are reviewed for readiness and, where appropriate, introduced to financing partners. FishMatch is not a lender.