Automated Feed Barge Network
Reference scope for automated feeding barges with sensors, cameras and centralised control across a marine salmon cage cluster.

Project scope
- Feed barges with silos, blowers and pipework to each cage
- Underwater cameras and pellet-detection sensors
- Centralised control room across the cluster
- Remote monitoring and integration with farm ERP
Highlights
Reference scope used to compare feeding automation suppliers on control architecture, service coverage and warranty.
Inside the feeding scope



Illustrative process imagery. Site-specific photography is not published.
How this project moved from a first enquiry to a comparable RFQ
Every FishMatch project follows the same five stages. Nothing is sourced until a person has reviewed the brief, and supplier identities stay confidential until the buyer decides to engage.
- 01
Initial enquiry
The buyer described a feeding project in Chile in a few lines — species or product, target output and site situation — without naming or contacting a single supplier.
Result · A confidential brief in the FishMatch desk, acknowledged the same day.
- 02
Brief review
FishMatch read the brief before any sourcing began, listed the missing decisions and separated what was fixed from what was still an assumption.
Result · An agreed project definition: system type, production model and the constraints that change equipment selection.
- 03
Sizing and numbers
Duty figures were established for the feeding scope — load, water treatment, aeration or oxygenation, flow and energy — so equipment was specified from numbers rather than catalogue models.
Result · A sizing basis every supplier quotes against, using the same assumptions.
- 04
Structured RFQ
The scope was split into lots (feed barges with silos, blowers and pipework to each cage and the rest of the package) and issued as one RFQ with identical questions to each shortlisted manufacturer.
Result · Comparable offers on one sheet: scope, exclusions, lead time and commissioning support.
- 05
Review and handoff
Offers were normalised, deviations declared, and only then were introductions made manually — supplier identities were held by FishMatch throughout.
Result · Reference scope used to compare feeding automation suppliers on control architecture, service coverage and warranty.
Planning a project like the Automated Feed Barge Network?
Request a comparable planning package for a feeding project in Chile or elsewhere. Your enquiry is handled confidentially — sponsor, site and supplier identities are not published.
Short answer
What is the fastest way to get quotes for Automated Feed Barge Network?
Submit one structured request for Automated Feed Barge Network. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.
- How it works:
- One structured request, human-reviewed before any supplier outreach
- Typical turnaround:
- Depends on scope and site data; no turnaround is guaranteed
- Confidentiality:
- Supplier names are never exposed during evaluation
- Cost to buyers:
- No fee charged to the buyer



