Shrimp farm projects — vannamei & monodon, earthen to indoor
Verified global suppliers for earthen, lined and indoor shrimp farms. Full CAPEX packages: aeration, water treatment, biosecurity, hatchery integration.
- Investment$500K – $50M
- Timeline10–20 months from feasibility to first harvest
- Capacity band100 t/yr semi-intensive → 5,000 t/yr integrated indoor RAS
shrimp farms we source, engineer and finance
Traditional 1–2 crops/yr; lowest CAPEX, highest biosecurity exposure.
Higher density with aeration, central drains, sludge management.
Year-round production in cooler climates, tight nitrogen management.
Full biosecurity, 15–25 t/ha equivalent yields, premium-market pricing.
Scope of engagement
- Site & water assessment (salinity, temperature, discharge)
- System selection: earthen, lined, biofloc or indoor RAS
- Aeration, oxygenation and water treatment package
- Hatchery / nursery integration and PL sourcing strategy
- Biosecurity, feed and harvest logistics design
- Bankability pack and financing referrals
What you actually get
- Verified quotes from Ecuadorian, Asian and European technology partners
- Biosecurity design tied to disease pressure in your region
- CAPEX split between build, biological ramp-up and working capital
- Anonymous discovery — suppliers see the RFQ, never your identity
Risks we design out of the RFQ
- · PL sourcing not aligned with the biosecurity level of the farm
- · Aeration undersized for target stocking density
- · Effluent strategy undefined — a common permit blocker
What our engineers tell every buyer before signing
Vendor-neutral principles drawn from live shrimp farms projects. Apply these before your RFQ goes out — they change what suppliers can quote.
- 1Match biosecurity level to PL sourcing
SPF PLs demand tight farm biosecurity to protect their value — pond and PL biosecurity must be designed as one system, not two separate procurements.
- 2Size aeration for peak stocking density, not average
Aeration undersized at peak biomass causes cascading DO crashes. Model worst-case night-time DO, then spec paddlewheels or diffused aeration with headroom.
- 3Define effluent strategy before permitting
Sludge, sedimentation ponds and discharge quality are increasingly regulated. A defined effluent plan turns a permit blocker into a licensing advantage.
Want these principles applied to your specific site, capacity and off-take before suppliers see anything?
Start guided RFQReady to move? Turn this brief into a live RFQ.
Answer the structured questions once — our concierge takes it to verified manufacturers. Supplier identities stay confidential until you approve.