Shrimp farm projects — vannamei & monodon, earthen to indoor

Verified global suppliers for earthen, lined and indoor shrimp farms. Full CAPEX packages: aeration, water treatment, biosecurity, hatchery integration.

  • Investment
    $500K – $50M
  • Timeline
    10–20 months from feasibility to first harvest
  • Capacity band
    100 t/yr semi-intensive → 5,000 t/yr integrated indoor RAS
System types

shrimp farms we source, engineer and finance

Earthen ponds

Traditional 1–2 crops/yr; lowest CAPEX, highest biosecurity exposure.

HDPE-lined intensive ponds

Higher density with aeration, central drains, sludge management.

Biofloc & greenhouse systems

Year-round production in cooler climates, tight nitrogen management.

Indoor shrimp RAS

Full biosecurity, 15–25 t/ha equivalent yields, premium-market pricing.

What the package includes

Scope of engagement

  • Site & water assessment (salinity, temperature, discharge)
  • System selection: earthen, lined, biofloc or indoor RAS
  • Aeration, oxygenation and water treatment package
  • Hatchery / nursery integration and PL sourcing strategy
  • Biosecurity, feed and harvest logistics design
  • Bankability pack and financing referrals
Buyer outcomes

What you actually get

  • Verified quotes from Ecuadorian, Asian and European technology partners
  • Biosecurity design tied to disease pressure in your region
  • CAPEX split between build, biological ramp-up and working capital
  • Anonymous discovery — suppliers see the RFQ, never your identity

Risks we design out of the RFQ

  • · PL sourcing not aligned with the biosecurity level of the farm
  • · Aeration undersized for target stocking density
  • · Effluent strategy undefined — a common permit blocker
Expert guidance

What our engineers tell every buyer before signing

Vendor-neutral principles drawn from live shrimp farms projects. Apply these before your RFQ goes out — they change what suppliers can quote.

  1. 1
    Match biosecurity level to PL sourcing

    SPF PLs demand tight farm biosecurity to protect their value — pond and PL biosecurity must be designed as one system, not two separate procurements.

  2. 2
    Size aeration for peak stocking density, not average

    Aeration undersized at peak biomass causes cascading DO crashes. Model worst-case night-time DO, then spec paddlewheels or diffused aeration with headroom.

  3. 3
    Define effluent strategy before permitting

    Sludge, sedimentation ponds and discharge quality are increasingly regulated. A defined effluent plan turns a permit blocker into a licensing advantage.

Want these principles applied to your specific site, capacity and off-take before suppliers see anything?

Start guided RFQ

Ready to move? Turn this brief into a live RFQ.

Answer the structured questions once — our concierge takes it to verified manufacturers. Supplier identities stay confidential until you approve.

Frequently asked questions

Short answer

What is the fastest way to get quotes for Shrimp Farms?

Submit one structured request for Shrimp Farms. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer
Get Free QuotesFinancing