Solutions · Feed Plants

Aquafeed extrusion plants — turnkey mill sourcing & financing

Fish and shrimp feed extrusion mills, 2–30 t/h. Extruders, driers, coaters, silos, packaging and QC lab. Verified global suppliers, bankable models.

  • Investment
    $2M – $40M
  • Timeline
    12–20 months from concept to commissioning
  • Capacity band
    2 t/h regional mills → 30+ t/h export-grade plants
System types

feed plants we source, engineer and finance

Fish feed extrusion lines

Sinking and floating pellets, species-specific formulations.

Shrimp feed lines

Micro-extrusion, high water stability, precise binder chemistry.

Larval and starter feed

Micro-particles, crumbles, functional feeds with premium ingredients.

Full turnkey mills

Raw material intake, dosing, grinding, extrusion, drying, coating, packaging.

What the package includes

Scope of engagement

  • Line sizing based on species, formulations and market forecast
  • Extruder, drier, vacuum coater and cooling package
  • Silos, dosing, grinding and micro-ingredient handling
  • QC lab (NIR, moisture, durability, water stability)
  • Utilities: steam, compressed air, electrical, dust management
  • Financing pack and off-taker letters of intent
Buyer outcomes

What you actually get

  • Independent process design — extruder choice not dictated by one supplier
  • Formulation flexibility to adjust to raw material market
  • Bankable model with realistic OPEX and yield assumptions
  • project-matched suppliers from Europe, Asia and the Americas

Risks we design out of the RFQ

  • · Extruder undersized for peak seasonal demand
  • · Vacuum coating omitted — kills margins on high-oil shrimp feed
  • · Raw material sourcing plan not aligned with plant capacity
Expert guidance

What our engineers tell every buyer before signing

Vendor-neutral principles drawn from live feed plants projects. Apply these before your RFQ goes out — they change what suppliers can quote.

  1. 1
    Size the extruder for peak, not average

    Feed demand is seasonal — sizing to yearly average leaves you short in the harvest window. Add 25–35% headroom on the extrusion line, not on drying.

  2. 2
    Never omit vacuum coating on shrimp or premium feed

    High-oil formulations are impossible to hold on the pellet without vacuum coating. Skipping it destroys margins on the exact SKUs that pay the CAPEX back.

  3. 3
    Tie raw material sourcing to your formulation flexibility

    A mill locked to one raw material profile is a liability. Design dosing and micro-ingredient handling so the plant can reformulate as commodity prices move.

Want these principles applied to your specific site, capacity and off-take before suppliers see anything?

Start guided RFQ

Ready to move? Turn this brief into a live RFQ.

Answer the structured questions once — our concierge takes it to verified manufacturers. Supplier identities stay confidential until you approve.

Frequently asked questions

Around 2 t/h is the practical minimum for a modern extrusion line. Below that, tolling from a nearby mill is usually more economical than owning production.

Yes. Shrimp feed is a specialised sub-vertical — micro-extrusion, high water stability, vacuum coating for high-oil formulas. Only a subset of global suppliers cover it credibly.

Yes. Signed off-take contracts from integrators, cooperatives or export buyers significantly improve financing terms. We package these into the bankability pack.

Short answer

What is the fastest way to get quotes for Feed Plants?

Submit one structured request for Feed Plants. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer