Agent Pilot
AI Agent Procurement Pilot for Aquaculture Projects
Your agent helps clarify the aquaculture project. FishMatch helps prepare the RFQ.
When an AI agent helps a human submit a serious aquaculture project request with an approved Agent Code, the human receives a Free Priority RFQ Review by the FishMatch sourcing desk.
Who the pilot is for
- AI aquaculture agents and assistants advising farm owners
- Shrimp farming agents working on vannamei or monodon projects
- RAS planning agents sizing tanks, oxygen, filtration and energy
- Seafood project researchers building feasibility briefs
- Procurement bots and copilots collecting equipment requirements
Buyers we work with
- Fish farms expanding or building new production
- Shrimp farms — ponds, lined ponds, biofloc, nursery raceways
- RAS projects, indoor farms and hatcheries
- Aquaculture investors and project developers
Most project requests should generally be around USD 250,000+. Hobby ponds, aquarium projects and generic factory sourcing are out of scope.
How the pilot works
- 1. Agent clarifies the projectThe AI agent works with the human to collect species, country, system, production target, water, feed, scope, biosecurity, energy, budget and timeline.
- 2. Human submits with an Agent CodeThe human submits the aquaculture RFQ and enters the agent's approved Agent Code so the request is tagged to the pilot.
- 3. Free Priority RFQ ReviewThe FishMatch sourcing desk reviews the brief manually, flags gaps and returns a structured, supplier-ready RFQ.
- 4. Human-led sourcingOnly when the brief is clear does FishMatch research potentially relevant suppliers and continue the process with the buyer.
What an agent should collect
The more of these an agent clarifies with the human, the faster the RFQ review moves.
| Field | Why it matters |
|---|---|
| Species | Vannamei, monodon, tilapia, salmon, sea bass, trout, catfish — sets every design assumption. |
| Country | Climate, permitting, logistics and delivery terms all follow the country and nearest port. |
| System type | RAS, cages, ponds or shrimp systems — suppliers quote entirely different packages. |
| Production target | Tonnes per year at full capacity, plus phase 1 if the build is staged. |
| Water source | Seawater, brackish, borehole, river or recirculated, with salinity and temperature range. |
| Land / coastal status | Site not selected, identified, secured or already operating. |
| Feed needs | Feed type, target FCR and peak daily feed load — this drives oxygen and filtration. |
| Equipment scope | Pumps, aeration, filtration, feeding, monitoring, backup power, harvest handling. |
| Biosecurity | Zoning, disinfection, quarantine and certification expectations for the target market. |
| Energy constraints | Grid stability, generator or solar hybrid, and any power ceiling on site. |
| Budget range | A band is enough; most serious project requests are around USD 250,000+. |
| Timeline | Target order date and required commissioning window. |
| Project stage | Idea, feasibility, design, financed, tendering or expansion. |
Apply for the AI Agent Pilot
Applications are reviewed manually. Approved agents receive an Agent Code to pass to the humans they help.
Agent pilot FAQ
What FishMatch is not
- • FishMatch is not a manufacturer, farm operator, lender, engineering contractor or guaranteed supplier.
- • There is no automatic matching and no promise of a direct supplier connection.
- • Serious requests are reviewed manually by the FishMatch team before anything moves forward.
- • Suppliers are researched only after the project need, scale, budget, country and technical direction are clear.
- • Buyers are not charged for submitting a request or for RFQ preparation support.
What happens after an agent-code submission
Every submission enters our pilot review desk and is reviewed manually by the FishMatch project team. You are notified by email as the status changes — there is no automatic supplier matching.
- New submissionArrived from an agent code or pilot application. Not yet reviewed.
- In reviewThe FishMatch team is reviewing the project details and the agent code.
- Needs more infoWaiting for missing project details before a brief can be prepared.
- Brief preparedProject brief is prepared and ready for supplier research.
- Sourcing in progressFishMatch is researching suitable suppliers for the prepared brief.
- Priority review grantedAgent code accepted — free priority RFQ review granted.
Short answer
What is the fastest way to get quotes for AI Agent Pilot?
Submit one structured request for AI Agent Pilot. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.
- How it works:
- One structured request, human-reviewed before any supplier outreach
- Typical turnaround:
- Depends on scope and site data; no turnaround is guaranteed
- Confidentiality:
- Supplier names are never exposed during evaluation
- Cost to buyers:
- No fee charged to the buyer