Disease prevention in RAS starts at design: split the farm into separate production units, disinfect incoming water, quarantine new fish, buy certified disease-free eggs or juveniles, and control movement of people, equipment and water between zones.
Separate production units
Independent units with their own water treatment stop a disease in one part of the farm from spreading everywhere. This also allows batch emptying and disinfection.
Water treatment and disinfection
UV and/or ozone treatment of make-up and recirculating water
Mechanical filtration to remove solids that carry pathogens
Stable water quality to reduce fish stress
Operating procedures
Certified disease-free eggs, fry or smolt
Quarantine area for new stock
Clean-to-dirty movement for staff and tools
Footbaths, hand washing and dedicated clothing per zone
Regular health checks with a fish veterinarian
Frequently asked questions
No farm is risk-free, but a well-designed and well-run RAS can greatly reduce disease risk compared with open systems.
Planning a RAS project?
Send one request and our team shortlists suitable RAS suppliers and prepares comparable quotes. Human-reviewed, no automated marketplace.
What is the fastest way to get quotes for RAS Biosecurity Design?
Submit one structured request for RAS Biosecurity Design. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.
How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer
Before you request quotes
Equipment scope
What equipment does a commercial aquaculture project actually need?
A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.
Which equipment should be specified before requesting quotes?
Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.
Can equipment be sourced in stages?
Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.