Sourcing aquícola, simplificado.

Encontre fornecedores de equipamentos para fazendas de camarão na Índia

Uma solicitação, várias propostas anônimas para equipamentos para fazendas de camarão na Índia.

Receber propostas
Market context

India — South Asia. Shrimp export powerhouse; major carp & tilapia inland farming. Main farmed species: shrimp, carp, tilapia.

Specify these four figures before requesting quotes

Quotes are only comparable when every supplier prices the same specification. These are the inputs that change everything downstream — fix them first, and the rest of the bill of quantities follows.

Pond area & lining

Hectares, pond size and whether ponds are earthen, partially or fully HDPE-lined.

Target density & cycles

PL/m² at stocking, survival assumption and cycles per year — this sets aeration and feed logistics.

Aeration demand

Installed kW per hectare at peak biomass, split between paddlewheel, blower and injector aeration.

Water intake & discharge

Pumping capacity, sedimentation and treatment required to meet local discharge rules.

What a comparable quote contains
  • Paddlewheel / aspirator aeration with kW sizing per pond
  • Blowers, diffusers and distribution piping where used
  • Intake pumps, reservoir and sedimentation layout
  • HDPE liners, geomembrane welding and central drains
  • Automatic feeders and feed monitoring
  • Water quality monitoring, alarms and standby power
  • Harvest, grading and chilling equipment
What drives the price difference
  • →Lining scope — full HDPE lining is the largest single CAPEX swing per hectare
  • →Installed aeration kW per hectare and motor efficiency class
  • →Automation of feeding and monitoring versus manual operation
  • →Standby power sizing for the whole aeration load
  • →Freight and duty on bulky, low-density pond equipment

How the sourcing process runs

  1. Step 1

    Structured brief

    You submit the project figures once. FishMatch normalises them into a single specification so every supplier answers the same question.

  2. Step 2

    Matched shortlist

    Suppliers are selected against the specification, export experience and service reach for your market — never a directory dump.

  3. Step 3

    Comparable quotes

    Bids are returned on the same scope, so differences reflect engineering and delivery terms rather than what each vendor chose to include.

  4. Step 4

    Financing review (optional)

    Projects that need funding are reviewed for readiness and, where appropriate, introduced to financing partners. FishMatch is not a lender.

Go deeper

FAQ

Uma solicitação e nossa equipe contata fornecedores qualificados. Identidades permanecem privadas.

Compradores enviam uma solicitação e nossa equipe contata fornecedores qualificados. Sem custo inicial.

Uma pessoa da equipe FishMatch responde em até um dia útil. O prazo das cotações depende do escopo do projeto e das respostas dos fornecedores; nenhum prazo é garantido.

Sim, projetos qualificados podem ser conectados com parceiros financeiros.