Pre-project services

From idea to investable aquaculture project.

Most aquaculture failures are decided before a single tank is installed. FishMatch Group connects project owners, investors and integrators with independent specialists for feasibility, site selection, water analysis, budget estimation and farm design — anywhere in the world.

Feasibility Study

Independent technical and commercial feasibility analysis for new RAS, pond, cage and hatchery projects — species selection, production model, CAPEX/OPEX and ROI scenarios.

Site Selection

Site screening against water source, climate, regulation, logistics and grid access. We shortlist viable parcels and flag deal-breakers before you commit capital.

Water Analysis

Source-water characterisation: salinity, temperature profile, dissolved oxygen, contaminants, seasonal variability — matched to your target species.

Budget Estimation

Order-of-magnitude CAPEX and 5-year OPEX estimates benchmarked against comparable global builds. Used by lenders, investors and boards.

Farm Design

Conceptual layout, equipment scoping and turnkey-partner shortlist — engineered to your site, capacity target and budget envelope.

Who this is for

  • Project owners planning a new RAS, hatchery, shrimp or cage farm.
  • Investors and family offices evaluating aquaculture as an asset class.
  • Integrators and EPCs needing independent verification of vendor claims.
  • Government and development-finance buyers building national programmes.

FAQ

The initial sourcing and partner-matching is free for qualified buyers. Detailed studies, on-site visits and engineering work are quoted directly by the specialist partner.

RAS (salmon, trout, sea bass, sea bream, tilapia, shrimp), flow-through, biofloc, pond, cage and offshore — freshwater and marine, hatchery through grow-out.

Most pre-project briefs receive a shortlist of qualified specialists within 24–72 hours.
FishMatch Group and the other Global B2B Group platforms are committed to conducting their own activities in accordance with applicable laws and regulations. FishMatch facilitates sourcing and RFQs; it does not manufacture, process, export or sell the listed products and does not grant regulatory approval. Requirements differ by product and by origin, destination and transit country. As buyer or importer, you remain responsible for your own import permissions, local requirements and due diligence. This notice does not change anyone's legal duties and is not legal advice. Regulation & responsibilities
Step 1 of 6Equipment

Confidential matching · Supplier-paid model · No obligation · Human-assisted sourcing

Privacy: We use these details to review and answer this request. They stay confidential, are shared only as described in our Privacy Policy, and are not used for marketing unless you separately opt in. We keep them while your request or account is active and for as long as legal record-keeping requires. Privacy Policy · Your rights

Short answer

What is the fastest way to get quotes for Pre Project?

Submit one structured request for Pre Project. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer