Equipment Comparison Sheet is a free, vendor-neutral calculator for professional aquaculture planning. Side-by-side kW, m³/hr, capex/opex, spare parts, life. Use it to size equipment, validate supplier proposals, and prepare a defensible technical specification before you go to market. All computation runs locally in your browser — no sign-up, no data leaves your device.
Procurement managers issuing an international RFQ.
Hatchery, RAS and processing plant operators evaluating expansions.
How it works
1Enter your project parameters — species, capacity and site conditions.
2The tool applies industry benchmarks and returns dimensioned outputs.
3Export or copy the numbers straight into your specification and RFQ.
Why it matters
Independent of any supplier — outputs are neutral engineering figures.
Removes guesswork before you request quotations.
Aligns budget, engineering and procurement teams on a single number.
Turns straight into an RFQ line item or financing input.
Frequently asked questions
Yes. Every Planning Center tool, including Equipment Comparison Sheet, is free and runs entirely in your browser. Buyers pay no fee, and suppliers cannot pay for ranking or shortlist position.
No. Equipment Comparison Sheet requires no sign-up. Your inputs never leave your device.
Equipment Comparison Sheet produces industry-standard engineering figures suitable for feasibility studies and RFQ documents. For financial close, pair it with the CAPEX, OPEX and ROI calculators and a stamped detailed design from a licensed engineer.
Yes. Equipment Comparison Sheet covers the aquaculture systems FishMatch Group specialises in — shrimp, tilapia, salmon, sea bass, trout, hatcheries, RAS and processing.
Copy the output into the RFQ Builder or the Technical Specification Template. FishMatch Group forwards the confidential brief to project-matched international manufacturers only.
Benchmarks are curated by the FishMatch Group aquaculture engineering team. Always validate against site-specific conditions and licensed engineering review.
How do you source Equipment Comparison Sheet for a commercial aquaculture project?
Start from the process requirement — biomass, flow, water quality target and site constraints — not from a product catalogue. FishMatch Group converts that requirement into a specification for Equipment Comparison Sheet, sources it from matched manufacturers and integrators across Europe, Asia and the Americas, and returns like-for-like quotations with lead times, energy consumption and lifetime running cost stated in the same format.
What we compare:
Scope, capacity, energy use, lead time and total cost of ownership
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Delivery terms:
Quotations normalised to EXW / FOB / CIF so prices are like-for-like
Cost to buyers:
No fee charged to the buyer
Before you request quotes
Equipment scope
What equipment does a commercial aquaculture project actually need?
A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.
Which equipment should be specified before requesting quotes?
Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.
Can equipment be sourced in stages?
Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.