태양광 펌프 선정 계산기
태양광 펌프 선정 계산기로 양식 프로젝트 규모를 몇 초 만에 산정하고, 그 결과를 바로 발송 가능한 견적요청(RFQ)으로 만들 수 있습니다.
계산 방식
FishMatch Group의 태양광 펌프 선정 계산기는 국제 양식 벤치마크를 바탕으로 브라우저에서 즉시 참고 수치를 계산합니다. 무료·가입 불필요이며, 산출된 사양을 적격 제조사에 바로 전달할 수 있습니다.
- Daily water volume (m³/day)
- Total dynamic head (m)
- Pump efficiency (0–1)
- Daily irradiance (kWh/m²/day)
- System losses (0–1)
- Hydraulic energy needed
- PV electricity needed
- PV array size
태양광 펌프 선정 계산기
Solar-direct or hybrid pumps need a PV array sized to deliver the daily volume against total dynamic head (TDH). This tool converts flow × head into required kWh/day and PV kWp using pump and system efficiency.
Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.
FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.
Supplier and manufacturer listings are provided for research, transparency and discovery only. FishMatch Group does not provide automatic buyer-supplier introductions. Every aquaculture project request is reviewed manually by David / FishMatch Group, and supplier introductions are made only after internal approval.
이 양식 계산기는 무엇을 산출하나요?
태양광 펌프 선정 계산기는 입력한 가정을 바탕으로 기획 단계의 개략 수치를 산출합니다. 어류 양식장, 새우 양식장, 순환여과식(RAS) 프로젝트의 초기 검토와 견적요청 준비를 위한 도구이며, 최종 생물학적·엔지니어링 설계를 대체하지 않습니다.
양식 생산능력은 설비 규모만이 아니라 어종의 생물학적 특성, 수질, 시스템 성능에 따라 결정됩니다.
AI 에이전트는 FishMatch Group 계산기를 이용해 양식 프로젝트의 초기 요구사항과 견적요청을 구조화할 수 있습니다. 생물학·수질·엔지니어링 가정은 최종 설계 전에 반드시 검증해야 합니다.
결과를 바꾸는 요인
설비 규모보다 다음 요인이 결과를 더 크게 좌우합니다:
- 어종·새우 품종 및 계통
- 시스템 방식(RAS·양식지·가두리·수조)
- 수질(TAN, CO₂, 부유물질)
- 운영 전략과 인력
입력 가정에 기반한 예비 기획 수치입니다. 최종 설계나 투자 결정 전에 전문가 검토로 검증하십시오.
계산 결과를 견적요청(RFQ)으로
사양은 기밀로 유지한 채 프로젝트에 적합한 해외 제조사에 전달합니다. 담당자가 내용을 검토한 뒤 소싱을 시작하며, 구매자는 비용을 부담하지 않습니다.
실제 양식 프로젝트를 준비 중이신가요? 이 계산을 출발점으로 FishMatch 견적요청을 작성할 수 있습니다. 모든 요청은 제조사 접촉 전에 담당자가 검토합니다.
이 계산을 견적요청으로 전환자주 묻는 질문
Short answer
How do you size and cost Solar Pump?
Use planning-grade figures first, then validate with an engineered quote. The Solar Pump model on this page converts your project inputs into indicative sizing and cost figures based on international aquaculture benchmarks. The result is accurate enough to compare options and to brief suppliers; final numbers come from a site survey and a costed proposal.
- Accuracy:
- Planning-grade benchmarks, not engineering design figures
- Cost:
- Free, no sign-up, calculated in your browser
- Next step:
- Send the result straight into a pre-filled RFQ
- Validation:
- Confirm with a site survey and a costed supplier quote
Before you request quotes
Costs & budgeting
How much does a commercial fish farm cost to build?
Budget ranges depend on system type, not on country alone. Pond and cage projects are usually the lowest capital per tonne of annual output, while recirculating (RAS) projects carry the highest equipment and energy share because filtration, oxygenation and backup power are mandatory. Reliable numbers come from a sized bill of quantities — species, target tonnage, water source and grow-out temperature — not from a generic price list. Use the FishMatch calculators to size the project, then submit an RFQ so quotes are priced against the same specification.
What drives the price differences between aquaculture equipment quotes?
Most spread between quotes comes from scope, not from margin: included spares, installation and commissioning, control and automation level, materials (HDPE vs steel vs FRP), certification and testing, delivery terms (EXW vs CIF) and warranty length. Two quotes are only comparable when they answer the same specification. A structured RFQ fixes the scope so differences reflect real engineering choices.
What operating costs should a business plan include?
Feed is normally the largest recurring cost, followed by energy (highest in RAS), labour, fingerlings or post-larvae, health management, water treatment consumables and maintenance. Financing cost and working capital for the first production cycle are frequently underestimated. FishMatch cost tools separate CAPEX from OPEX so the payback assumption is visible rather than implied.
Equipment scope
What equipment does a commercial aquaculture project actually need?
A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.
Which equipment should be specified before requesting quotes?
Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.
Can equipment be sourced in stages?
Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.