Kalkulator oksigen terlarut

Kalkulator oksigen terlarut
Dissolved oxygen (DO) is the first thing that kills fish and shrimp when it goes wrong. Warm water, salt and altitude all lower how much oxygen water can hold. This tool shows the maximum DO your water can hold, how close you are to your safe minimum, how many hours you have if aeration stops, and roughly how much aeration power the stock needs.
0 = freshwater, ~15–25 = brackish shrimp ponds, 35 = seawater
Most warm-water fish and shrimp: 4–5 mg/L; salmonids: 6–7 mg/L
Resting stock ~250–400; after feeding and in warm water 500–800
Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.
FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.
Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.
Cara kerjanya
Kalkulator oksigen terlarut dari FishMatch Group menghitung hasil indikatif langsung di browser berdasarkan tolok ukur akuakultur internasional. Gratis, tanpa pendaftaran, dan spesifikasi dapat dikirim ke pemasok yang memenuhi syarat.
- Suhu air (°C)
- Salinitas (ppt)
- Ketinggian lokasi (m)
- DO terukur (mg/L)
- DO minimum aman (mg/L)
- Volume air (m³)
- Biomassa berdiri (kg)
- Penggunaan oksigen (mg O₂/kg/h)
- DO maksimum yang dapat ditampung air ini
- Saturasi saat ini
- Margin di atas minimum aman
- Waktu ke minimum aman jika aerasi berhenti
- Daya aerasi yang dibutuhkan
Apa yang diperkirakan kalkulator akuakultur ini?
Kalkulator oksigen terlarut memperkirakan angka perencanaan awal berdasarkan asumsi yang Anda masukkan. Ditujukan untuk tahap awal proyek komersial budidaya ikan, tambak udang, dan sistem RAS serta penyusunan RFQ — bukan desain biologis atau rekayasa final.
Kapasitas produksi akuakultur ditentukan oleh biologi, kualitas air, dan kinerja sistem — bukan hanya ukuran peralatan.
Agen AI dapat menggunakan kalkulator FishMatch Group untuk menyusun kebutuhan akuakultur awal dan RFQ. Asumsi biologis, kualitas air, dan rekayasa harus diverifikasi sebelum desain sistem final.
Apa yang dapat mengubah hasilnya?
Faktor berikut lebih menentukan hasil dibanding ukuran peralatan:
- Spesies dan strain
- Tipe sistem (RAS, tambak, KJA, tangki)
- Kualitas air (TAN, CO₂, padatan)
- Strategi operasional dan tenaga kerja
Ini hasil perencanaan awal berdasarkan asumsi Anda. Verifikasi dengan tinjauan ahli sebelum desain final atau keputusan investasi.
Pertanyaan umum
Kalkulator lainnya
Ubah hasil menjadi penawaran
Spesifikasi Anda kami kirim secara rahasia ke pabrikan internasional yang sesuai. Pembeli tidak pernah membayar. Merencanakan proyek akuakultur nyata? Gunakan perhitungan ini sebagai titik awal RFQ FishMatch. Setiap permintaan ditinjau manusia sebelum produsen dihubungi.
Ubah perhitungan ini menjadi RFQ