Species and life-stage experience at your scale
RAS engineering is species-specific and stage-specific. A supplier with strong smolt and post-smolt references is not automatically the right partner for marine grow-out, warm-water tilapia or shrimp. Ask for delivered projects with the same species, the same life stage and a comparable production volume, and for permission to speak to the owner.
“Which delivered projects match our species, life stage and annual tonnage, and can we contact those owners?”