Buyer FAQ hub

Aquaculture buyer FAQ hub

Answers for buyers planning aquaculture projects: procurement and RFQ process, recirculating aquaculture systems (RAS), shrimp farming and general aquaculture planning.

Procurement & RFQ

How to run a structured sourcing process and compare offers fairly.

How do I start an aquaculture procurement process?

Fix species, annual capacity, site and budget range first, then convert them into a structured RFQ so every supplier quotes the same scope. Starting with supplier catalogues produces offers you cannot compare.

What should an aquaculture RFQ include?

Species and target tonnage, system type, water source and quality, site and climate data, available power, required documentation, delivery terms (EXW/FOB/CIF), commissioning and training expectations.

How many suppliers should I compare?

Three to five qualified suppliers per scope is usually enough to see the real technical and price spread without slowing the project down.

How do I compare quotes fairly?

Normalise scope before price: included spares, installation and commissioning, warranty, energy consumption per tonne, lead time and payment terms often move the true cost more than the headline number.

RAS systems

Recirculating aquaculture: treatment train, energy, water use and cost.

What does a RAS system need?

Mechanical filtration, biofiltration, degassing/CO2 stripping, oxygenation, pumping, disinfection, monitoring and backup power — all sized from biomass and daily feed load.

How much power does a RAS use?

Pumping, oxygen supply and temperature control dominate the load. Connected power rises with flow rate, total head and treatment intensity; size it with the project sizer before asking suppliers for prices.

How much water does a RAS exchange?

Most commercial RAS replace roughly 5–10% of system volume per day, depending on species, feed load, treatment and discharge rules. Lower exchange means heavier treatment and higher energy.

Is RAS more expensive than ponds?

Capex and energy per tonne are higher, offset by biosecurity, site independence, water savings, year-round output and proximity to market.

Shrimp farming

Pond, biofloc and indoor shrimp production questions.

Which system should I use for shrimp?

Lined intensive ponds, biofloc raceways or indoor RAS — the choice follows climate, biosecurity risk, land and water cost and the price your market pays for year-round supply.

How much aeration do shrimp ponds need?

Aeration follows biomass and feeding rate, not pond area alone. Intensive ponds need substantially more installed aeration per hectare than semi-intensive ones; oxygen demand peaks late in the cycle.

Which equipment matters most in a shrimp farm?

Aeration, pond liners, intake and water treatment, automatic feeders, pumps and water-quality monitoring — in that order for most intensive projects.

Can I convert a fish farm to shrimp?

Sometimes. Salinity, pond depth, aeration capacity, intake treatment and biosecurity usually need rework, so treat it as a redesign rather than a swap of stock.

Aquaculture planning

Species, feed, site selection and permitting basics.

Which species is most profitable?

It depends on market price, climate and feed cost. Tilapia, shrimp, salmon, seabass, barramundi and catfish all have different economics — model your own feed, energy and market numbers before choosing.

How do I estimate feed requirements?

Multiply target biomass produced by the expected FCR, then adjust for mortality, feeding tables and temperature. Feed is usually the largest single operating cost.

What makes a site suitable?

Water availability and quality, temperature range, power supply, discharge and permitting options, logistics to market and access to trained workforce.

Which permits are required?

It varies by country, but typically water abstraction, effluent discharge, environmental impact assessment, construction approval and an aquaculture or veterinary licence.

Answers are planning-level guidance. Final figures depend on site conditions, species, regulation and supplier engineering.

Question not answered here?

Send your project question and we will answer with planning-level numbers, not sales copy.

Ask a question

Ready to turn questions into a quote?

Submit a structured RFQ or size the project first — both are free for buyers.

Short answer

What is the fastest way to get quotes for FAQ Hub?

Submit one structured request for FAQ Hub. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer