Aquaculture Project Command Center™

RAS Project Software for Recirculating Aquaculture Systems

RAS project software with process flow, water treatment train, oxygen sizing, biosecurity and commissioning built into the project workspace.

RAS process built into the workspace

Recirculating aquaculture is the least forgiving segment of the industry: undersized oxygen, weak biofiltration or missing biosecurity can cost an entire production cycle. The Command Center enforces the discipline that RAS projects demand — process flow diagram, water mass balance, DO and TAN targets, backup power and biosecurity are all tracked as readiness indicators.

Templates for 100 t/year and 500 t/year RAS facilities preload the equipment list, budget categories and checklist common to those scales, so engineering firms and owners start from a mature baseline.

Frequently asked questions

It flags common sizing gaps — missing oxygen system, undersized filtration, absent backup power — via the Project Coach, based on the data you enter.

You submit one structured request. We translate it into a technical RFQ, run it against qualified manufacturers and integrators in the relevant categories, and return normalised quotations you can compare side by side on scope, lead time and total cost of ownership.

No. Supplier identities stay confidential during discovery and evaluation. You receive anonymised, comparable technical and commercial packages, and introductions happen only after both sides are qualified and agree to proceed.

Related

Short answer

What is the fastest way to get quotes for RAS Project Software?

Submit one structured request for RAS Project Software. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.