Catalogue Purchase or Project RFQ? How to Buy Aquaculture Equipment the Right Way

Updated 2026-09-29 11 min read

Short answer

Should I buy aquaculture equipment from a catalogue or issue an RFQ?

Buy from a catalogue when you know the exact model — a spare part, a consumable or an identical unit. Issue an RFQ when the right equipment depends on your fish, water and site: a new farm, an expansion, or anything where several systems must work together. The bigger and more connected the purchase, the more a common design basis matters, because otherwise quotes can't be compared.

Catalogue:
Known part or identical unit
Short RFQ:
One category, 3–5 suppliers
Project RFQ:
New farm or several linked systems
Key input:
Peak biomass and daily feed

Which buying route fits your purchase?

What you are buyingBest routeWhat to sendMain risk if you choose wrong
Spare part or consumable with a known model numberBuy direct from the manufacturer or distributorModel/part number, quantity, delivery addressOver-engineering a simple purchase and losing weeks
One equipment category for an existing farm (e.g. more aerators)Short RFQ to 3–5 qualified suppliersBiomass, water type, current equipment, power supply, target deliveryQuotes sized to different assumptions, so prices can't be compared
New farm, expansion or several categories that must work togetherFull project RFQ built on calculated duty figuresSpecies, tonnes/year, site and water data, system type, scope boundaries, timeline, budget bandGaps at the interfaces between vendors — nobody owns the whole system

Three worked examples

Illustrative planning figures using common industry rules of thumb. They show the method, not a design — suppliers confirm final sizing for your site.

Example 1 — Replacing a paddlewheel motor

A shrimp farm needs two replacement 1.5 kW motors for paddlewheels it already runs. The model is known and nothing about the pond changes. Route: catalogue. Call the manufacturer or local distributor with the model number. An RFQ would only add delay.

Example 2 — More aeration for a 20 ha vannamei farm

The owner wants to raise harvests to about 8 t/ha, so roughly 160 t of shrimp standing in the ponds near harvest. A widely used guideline is about 1 hp of mechanical aeration per 400–500 kg of shrimp biomass, which points to roughly 320–400 hp installed. Route: short RFQ. Send 3–5 aerator suppliers the same basis — pond areas and depths, target biomass, salinity, power supply (grid or generator, voltage) — and ask each to state its oxygen transfer rate. Without that, a quote for cheaper low-output units looks better than it is.

Example 3 — A new 1,200 t/year tilapia RAS

At an FCR of 1.5, 1,200 t of fish needs about 1,800 t of feed a year — around 5 t a day on average and more at peak. RAS designers often plan roughly 0.4–0.5 kg of oxygen per kg of feed, so about 2–2.5 t of oxygen a day. Filtration, oxygenation, pumps, monitoring and backup power all depend on those numbers and on each other. Route: full project RFQ. Work out the design basis first with the biomass, FCR and oxygen calculators, then ask every supplier to quote against it and to state what is excluded.

How to compare the quotes you get back

Before looking at totals, check each quote against these lines. Mark each one included, excluded or unclear.

Check this lineSupplier ASupplier BSupplier CWhy it matters
Design basis stated (biomass, feed/day, temperature)☐☐☐If a quote doesn't state what it was sized for, you can't tell whether it is cheap or undersized.
Oxygen supply and backup included☐☐☐The most common exclusion in RAS quotes — and the one that kills fish during a power cut.
Civil works and building excluded or included☐☐☐Often explains a 2× price difference between otherwise similar quotes.
Freight, duties and Incoterm (e.g. FOB vs CIF)☐☐☐A FOB price and a CIF price for the same kit are not comparable.
Installation, commissioning and training☐☐☐Some suppliers include on-site commissioning; others price it per day.
Spare parts and warranty period☐☐☐12 months of spares can be 3–5% of equipment value — check whether it is in.
Performance guarantees (flow, oxygen transfer, water quality)☐☐☐Without them, underperformance is your problem after handover.

What to prepare before any RFQ

  • Species, harvest size and tonnes per year (and phasing, if any)
  • Country, site, water source, temperature range and salinity
  • System type: ponds, cages, RAS, raceways, hatchery
  • Calculated peak biomass, daily feed and oxygen demand
  • Power supply and backup expectation
  • What you build locally and what the supplier delivers
  • Delivery terms (Incoterm), timeline and budget range

The full field list and a sample are in how to prepare an aquaculture RFQ.

FAQ

When you know exactly what you need: a replacement part, a consumable, or an identical unit to one you already run. Buying direct from the manufacturer or distributor is faster and a formal RFQ adds little.

When the right equipment depends on biology and site conditions — a new farm, an expansion, or a purchase spanning several categories such as filtration, oxygenation, pumps and monitoring. Suppliers then need the same design basis so their quotes can be compared.

Three to five qualified suppliers is usually enough. Fewer limits comparison; more creates evaluation work without better prices, and many suppliers decline RFQs they see sent to a long list.

Peak standing biomass, peak daily feed, oxygen demand, water flow or turnover, and installed power. These follow from species, annual tonnes, harvest weight and FCR, and can be estimated with free calculators before contacting suppliers.

Usually because they cover different scopes: one includes oxygen backup, civil works, freight or commissioning and the other doesn't. Put quotes side by side line by line before comparing totals.

No. FishMatch Group is an independent sourcing and RFQ service. It does not sell, stock or install equipment, and does not provide credit, loans or financial advice.

Planning a farm or a multi-system purchase?

Start with the calculators, then send one brief and we'll review it before any supplier is contacted. Free for buyers. FishMatch Group does not sell equipment or provide financing.

Continue reading

Aquaculture planning benchmarks

Indicative global planning ranges used in FishMatch Group calculators. Supplier quotes and site data confirm final values.
FigureValueContext
CAPEX — RASUSD 9,000–14,000 per tonne/yrGlobal baseline before country cost factor.
CAPEX — PondsUSD 1,800–4,000 per tonne/yrLined or earthen ponds, excluding land.
CAPEX — CagesUSD 2,500–5,500 per tonne/yrCages, moorings, nets and service equipment.
CAPEX — Flow-throughUSD 4,000–7,000 per tonne/yrRaceways and water intake works.
Energy useRAS ~6 kWh/kg; ponds ~1.2; flow-through ~1.5; cages ~0.3Per kg of fish produced.
Typical FCRTrout 1.1; salmon 1.2; shrimp 1.4; tilapia 1.6; carp 1.8kg feed per kg growth; varies with feed and management.
Farm size where FishMatch reviews projectsFrom ~USD 250,000 total project valueCommercial fish and shrimp projects.

Before you request quotes

Supplier selection criteria

How should a buyer compare aquaculture suppliers?

Compare on evidence, not on presentation: delivered projects at a similar scale and climate, engineering support during design, lead time commitments, spare-part and service availability in your region, certification and testing documentation, payment and warranty terms, and willingness to quote against your specification rather than substituting a catalogue package.

What are the warning signs in a supplier quotation?

Treat these as review triggers: no itemised scope, guaranteed biological or financial performance, no named delivery terms or lead time, no spare-parts or service statement, unclear responsibility for installation and commissioning, and equipment sizing that does not reference your water temperature, oxygen demand or biomass targets.

How does FishMatch handle supplier selection?

FishMatch is an independent sourcing service, not a manufacturer or reseller. The buyer submits one structured project request; our team reviews it first and only then contacts suitable suppliers on the buyer's behalf, presenting their responses through FishMatch in a comparable format. Buyers do not contact suppliers directly and nothing is sent automatically. The final choice stays with the buyer.

FishMatch Group email updates

Get the buyer intelligence briefing

Practical aquaculture intelligence for sourcing and project decisions: new buyer guides, dated official-source updates and free tools, for the topics you choose.

What you will receive

  • A short digest of newly published FishMatch Group articles and center updates for your topics
  • A summary, publication date and link to the full article for every item
  • No advertising, supplier promotions or sales calls; subscribing never creates a sourcing request

We first email you a confirmation link. Your subscription starts only after you confirm.

Digest sending is still being set up. Confirmed subscribers receive the first digest when it starts; nothing else is sent.

Topics
How often

Read our Privacy Policy. Subscribing is separate from any procurement request.