Aquaculture procurement cost calculator: compare two quotes on landed and lifetime cost

Short answer: the cheapest quote is not always the lowest total cost. Enter two shrimp or aquaculture equipment quotes line by line — freight, duties, installation, commissioning, training, spares and running costs — and compare them on the same currency, period and Incoterms® rule.

Free · no sign-in · English · nothing you enter is saved or sent unless you choose to copy it into a request.

Built on the procurement checklist

  • Requirement: Budget currency, what each quote includes, and which lines are still missing.
  • Technology and total cost: Energy, consumables, maintenance, spares and replacement; installation, integration, commissioning and training.
  • Quotes and terms: The Incoterms® rule, currency and your exchange rate, warranty, and whether each scope is verified against your brief.

Supplier evidence and the financing and market checks are not numbers — work through them in the article checklist.

Enter your quotes

Quote A

1 unit of quote currency in your reporting currency, with its date in your notes.

Upfront

Running costs

Quote B

1 unit of quote currency in your reporting currency, with its date in your notes.

Upfront

Running costs

Results

Quote A

  • Enter the quote currency as three letters, e.g. EUR.
  • Enter the quoted equipment or system price.

Quote B

  • Enter the quote currency as three letters, e.g. EUR.
  • Enter the quoted equipment or system price.

Send the comparison with a project request

Nothing is sent from this page. If you tick the box, your figures are copied into the request form in this browser tab, where you can edit or remove them before you submit.

Start a project request

Next steps