Infrastructure · Feed production

Feed-Mill RFQ: Extrusion and Pelleting Lines for Fish and Shrimp Feed

For farm groups and investors building their own fish or shrimp feed production. One brief, reviewed by a person, so suppliers quote comparable lines.

Short answer

What does an aquafeed mill RFQ need to contain?

A feed-mill RFQ needs the target species and feed types (sinking, floating, shrimp pellets), pellet sizes, annual and hourly output, raw materials you will use, process route (grinding, mixing, conditioning, extrusion or pelleting, drying, coating), bagging or bulk handling, site power, building status and the scope of installation and training. With that defined, competing suppliers quote the same line.

Sizing basis:
Tonnes per hour × operating hours
Common omission:
Raw-material specification
Supplier identities:
Confidential until you approve
Project focus:
USD 250,000+ commercial projects

What the brief must contain

Species and feed types

Floating or sinking fish feed and shrimp feed need different process routes and dies.

Pellet sizes

The range of diameters determines dies, cutters and drying needs.

Output

Annual tonnes and target tonnes per hour, with shifts per day.

Raw materials

Local ingredients and their form affect grinding, mixing and storage.

Process route

Extrusion or pelleting, drying, cooling, oil coating, packing — state what you need.

Site and utilities

Power, steam or boiler fuel, water, building and storage space.

Scope the quotation should cover

  • Raw-material intake and storage
  • Grinding and mixing
  • Extruder or pellet mill
  • Drying, cooling and coating
  • Packing or bulk loading
  • Installation, commissioning and training

Frequently asked questions

All infrastructure RFQ paths

Smart questions

Fish farm project details

Lets suppliers scope tanks, cages, aeration, feeders and water treatment for your species and site.

Documents that help us quote faster

Optional — you can email them after or bring them to the first call. Uploads are private and encrypted.

  • Site photos or coordinates
  • Water analysis (DO, pH, temperature, ammonia)
  • Existing licenses / aquaculture permits
  • Business plan or feasibility summary (if available)
Aquaculture project details (optional)

Tell suppliers what they need to quote accurately

The more complete your aquaculture project details are, the faster suitable partners can understand your request and respond with realistic options. Leave anything you do not know yet blank — nothing here is required.

Not sure what to write? Answer a few quick questions and we'll draft the brief for you.

Confidential matching · Supplier-paid model · No obligation · Human-assisted sourcing

Short answer

What is the fastest way to get quotes for Feed Mill RFQ?

Submit one structured request for Feed Mill RFQ. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer
What is the fastest way to get quotes for Feed Mill RFQ?

Submit one structured request for Feed Mill RFQ. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How does FishMatch Group source suppliers for this requirement?

You submit one structured request. We translate it into a technical RFQ, run it against qualified manufacturers and integrators in the relevant categories, and return normalised quotations you can compare side by side on scope, lead time and total cost of ownership.

Do buyers see supplier names during the sourcing process?

No. Supplier identities stay confidential during discovery and evaluation. You receive anonymised, comparable technical and commercial packages, and introductions happen only after both sides are qualified and agree to proceed.

Before you request quotes

Supplier selection criteria

How should a buyer compare aquaculture suppliers?

Compare on evidence, not on presentation: delivered projects at a similar scale and climate, engineering support during design, lead time commitments, spare-part and service availability in your region, certification and testing documentation, payment and warranty terms, and willingness to quote against your specification rather than substituting a catalogue package.

What are the warning signs in a supplier quotation?

Treat these as review triggers: no itemised scope, guaranteed biological or financial performance, no named delivery terms or lead time, no spare-parts or service statement, unclear responsibility for installation and commissioning, and equipment sizing that does not reference your water temperature, oxygen demand or biomass targets.

How does FishMatch handle supplier selection?

FishMatch is an independent sourcing service, not a manufacturer or reseller. The buyer submits one structured project request; our team reviews it first and only then contacts suitable suppliers on the buyer's behalf, presenting their responses through FishMatch in a comparable format. Buyers do not contact suppliers directly and nothing is sent automatically. The final choice stays with the buyer.