Kikokotoo cha gharama za shamba la samaki Uganda

Kadiria mtaji, chakula na umeme kwa shamba la samaki au kamba Uganda kwa bei za ndani. Matokeo kwa sarafu ya ndani na USD.

Kiwango cha ubadilishaji: 1 USD ≈ 3700 UGX

Matokeo ya makadirio

Mtaji wa vifaa na ufungaji
UGX 1,850,000,000 · US$ 500,000 – UGX 4,070,000,000 · US$ 1,100,000
Chakula kinachohitajika
400 t/mwaka
Gharama ya chakula
UGX 1,924,000,000 · US$ 520,000/mwaka
Gharama ya umeme
UGX 32,190,000 · US$ 8,700/mwaka
VAT kwa vifaa (18%)
UGX 333,000,000 · US$ 90,000 – UGX 732,600,000 · US$ 198,000

Makadirio ya mipango kulingana na viwango vya kikanda vya 2026 na viwango vya ubadilishaji vya takriban. Si nukuu.

Umeme: bei za biashara za GlobalPetrolPrices (2026). Bei za maji na viwango vya ubadilishaji ni makadirio; VAT ni kiwango cha kawaida.

Maswali yanayoulizwa mara kwa mara

Shamba la samaki linagharimu kiasi gani Uganda?

RAS ya makadirio ya tani 250 kwa mwaka Uganda inagharimu takriban UGX 6.7B (≈ US$ 1.8M) – UGX 10.4B (≈ US$ 2.8M) kwa vifaa na ufungaji, bila ardhi na majengo. Mabwawa na vizimba kwa kawaida ni nafuu zaidi kwa tani. Tumia kikokotoo kisha omba nukuu.

Ni samaki na kamba gani wanaofugwa Uganda?

Miradi ya kibiashara Uganda inalenga zaidi sato (tilapia), kambale.

Ukurasa huu kwa lugha nyingine

Before you request quotes

Costs & budgeting

How much does a commercial fish farm cost to build?

Budget ranges depend on system type, not on country alone. Pond and cage projects are usually the lowest capital per tonne of annual output, while recirculating (RAS) projects carry the highest equipment and energy share because filtration, oxygenation and backup power are mandatory. Reliable numbers come from a sized bill of quantities — species, target tonnage, water source and grow-out temperature — not from a generic price list. Use the FishMatch calculators to size the project, then submit an RFQ so quotes are priced against the same specification.

What drives the price differences between aquaculture equipment quotes?

Most spread between quotes comes from scope, not from margin: included spares, installation and commissioning, control and automation level, materials (HDPE vs steel vs FRP), certification and testing, delivery terms (EXW vs CIF) and warranty length. Two quotes are only comparable when they answer the same specification. A structured RFQ fixes the scope so differences reflect real engineering choices.

What operating costs should a business plan include?

Feed is normally the largest recurring cost, followed by energy (highest in RAS), labour, fingerlings or post-larvae, health management, water treatment consumables and maintenance. Financing cost and working capital for the first production cycle are frequently underestimated. FishMatch cost tools separate CAPEX from OPEX so the payback assumption is visible rather than implied.