Kembali ke panduan Indonesia

Panduan pasar akuakultur

Kalkulator biaya tambak ikan Indonesia

Perkirakan investasi, pakan, dan energi untuk tambak ikan atau udang di Indonesia dengan harga lokal. Hasil dalam mata uang lokal dan USD.

Kurs yang digunakan: 1 USD ≈ 16300 IDR

Hasil perkiraan

Investasi peralatan dan instalasi
Rp 31.173.750.000 · US$1.912.500 – Rp 48.492.500.000 · US$2.975.000
Kebutuhan pakan
350 t/tahun
Biaya pakan
Rp 7.416.500.000 · US$455.000/tahun
Biaya energi
Rp 1.711.500.000 · US$105.000/tahun
Biaya air (air tambahan RAS)
Rp 2.445.000.000 · US$150.000/tahun
PPN atas peralatan (11%)
Rp 3.429.112.500 · US$210.375 – Rp 5.334.175.000 · US$327.250
Volume air RAS
2.083 m³

Perkiraan perencanaan berdasarkan rentang regional 2026 dan kurs perkiraan. Bukan penawaran harga.

Listrik: tarif bisnis GlobalPetrolPrices (2026). Tarif air dan kurs adalah perkiraan; pajak menggunakan tarif nasional standar.

Pertanyaan umum

Berapa biaya membangun tambak ikan di Indonesia?

Sistem RAS 250 ton/tahun di Indonesia diperkirakan sekitar Rp 31,2 M (≈ US$1,9 jt) – Rp 48,5 M (≈ US$3 jt) untuk peralatan dan instalasi, di luar lahan dan bangunan. Kolam dan keramba jaring apung biasanya lebih murah per ton. Gunakan kalkulator, lalu minta penawaran.

Spesies apa yang dibudidayakan di Indonesia?

Proyek komersial di Indonesia terutama berfokus pada udang, nila, patin, kakap putih.

Halaman ini dalam bahasa lain

Short answer

What is the fastest way to get quotes for Indonesia?

Submit one structured request for Indonesia. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer
What is the fastest way to get quotes for Indonesia?

Submit one structured request for Indonesia. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How does FishMatch Group source suppliers for this requirement?

You submit one structured request. We translate it into a technical RFQ, run it against qualified manufacturers and integrators in the relevant categories, and return normalised quotations you can compare side by side on scope, lead time and total cost of ownership.

Do buyers see supplier names during the sourcing process?

No. Supplier identities stay confidential during discovery and evaluation. You receive anonymised, comparable technical and commercial packages, and introductions happen only after both sides are qualified and agree to proceed.

Before you request quotes

Costs & budgeting

How much does a commercial fish farm cost to build?

Budget ranges depend on system type, not on country alone. Pond and cage projects are usually the lowest capital per tonne of annual output, while recirculating (RAS) projects carry the highest equipment and energy share because filtration, oxygenation and backup power are mandatory. Reliable numbers come from a sized bill of quantities — species, target tonnage, water source and grow-out temperature — not from a generic price list. Use the FishMatch calculators to size the project, then submit an RFQ so quotes are priced against the same specification.

What drives the price differences between aquaculture equipment quotes?

Most spread between quotes comes from scope, not from margin: included spares, installation and commissioning, control and automation level, materials (HDPE vs steel vs FRP), certification and testing, delivery terms (EXW vs CIF) and warranty length. Two quotes are only comparable when they answer the same specification. A structured RFQ fixes the scope so differences reflect real engineering choices.

What operating costs should a business plan include?

Feed is normally the largest recurring cost, followed by energy (highest in RAS), labour, fingerlings or post-larvae, health management, water treatment consumables and maintenance. Financing cost and working capital for the first production cycle are frequently underestimated. FishMatch cost tools separate CAPEX from OPEX so the payback assumption is visible rather than implied.