Kalkulator troškova uzgoja ribe – Hrvatska

Procijenite capex, hranu i energiju za uzgoj ribe ili škampa (Hrvatska) prema lokalnim cijenama. Rezultati u lokalnoj valuti i USD.

Korišteni tečaj: 1 USD ≈ 0.9 EUR

Okvirni rezultati

Capex opreme i ugradnje
562.500 € · 625.000 USD – 1.237.500 € · 1.375.000 USD
Potrebna hrana
450 t/godina
Trošak hrane
607.500 € · 675.000 USD/godina
Trošak energije
11.813 € · 13.125 USD/godina
PDV na opremu (25%)
140.625 € · 156.250 USD – 309.375 € · 343.750 USD

Okvirne procjene temeljene na regionalnim rasponima za 2026. i približnim tečajevima. Nije ponuda.

Struja: poslovne tarife GlobalPetrolPrices (2026). Tarife vode i tečajevi su procjene; PDV po standardnoj stopi.

Česta pitanja

Koliko košta uzgajalište ribe (Hrvatska)?

Okvirni RAS od 250 tona godišnje (Hrvatska) košta oko 2,0 mil. € (≈ 2,3 mil. USD) – 3,2 mil. € (≈ 3,5 mil. USD) za opremu i ugradnju, bez zemljišta i zgrada. Ribnjaci i kavezi obično su jeftiniji po toni. Koristite kalkulator, a zatim zatražite ponude.

Koje se ribe i škampi uzgajaju (Hrvatska)?

Komercijalni projekti (Hrvatska) uglavnom su usmjereni na: lubin, orada, pastrva.

Ova stranica na drugim jezicima

Before you request quotes

Costs & budgeting

How much does a commercial fish farm cost to build?

Budget ranges depend on system type, not on country alone. Pond and cage projects are usually the lowest capital per tonne of annual output, while recirculating (RAS) projects carry the highest equipment and energy share because filtration, oxygenation and backup power are mandatory. Reliable numbers come from a sized bill of quantities — species, target tonnage, water source and grow-out temperature — not from a generic price list. Use the FishMatch calculators to size the project, then submit an RFQ so quotes are priced against the same specification.

What drives the price differences between aquaculture equipment quotes?

Most spread between quotes comes from scope, not from margin: included spares, installation and commissioning, control and automation level, materials (HDPE vs steel vs FRP), certification and testing, delivery terms (EXW vs CIF) and warranty length. Two quotes are only comparable when they answer the same specification. A structured RFQ fixes the scope so differences reflect real engineering choices.

What operating costs should a business plan include?

Feed is normally the largest recurring cost, followed by energy (highest in RAS), labour, fingerlings or post-larvae, health management, water treatment consumables and maintenance. Financing cost and working capital for the first production cycle are frequently underestimated. FishMatch cost tools separate CAPEX from OPEX so the payback assumption is visible rather than implied.